TSX: WRN · Copper
A copper-gold developer in Yukon, Canada (the Casino project): feasibility study done, now in the permitting panel review.
Fair: a deal pays 5.3×, no deal 0.4× · low confidence
Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 20% (before, 25%, the figure the rankings page used). Before: 1.62×, fair. Now: 1.38×, fair. Re-run by the analyst and checked by an independent re-run.
Confidence: low. Low. The value rests on the median of a four-name peer group (0.22 of study value) that sits in a gap between two low names (0.04, 0.07) and two high ones (0.36, 0.37): at the group's lowest the expected value is 0.52×, at the high reading 1.75×, so even that stays under the cheap line. The study is from 2022, stretched to a gold price 101% above its top tested price, at 2022 costs. The price, C$2.04, sits between the two price levels.
What one share should be worth in Nov 2030, by the analyst's estimate:
Works means A major (Rio Tinto, Mitsubishi or another) bids for Western or signs a deal that funds Casino, by 13 Nov 2030.
Fails means No bid and no funding deal by 13 Nov 2030; Western still owns an unfunded study-stage project and has spent its cash.
Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.5758 C$ per €); the rating itself is worked out in Canadian dollars, and future exchange rates will differ.
Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.
Latest close, Mon 16 Nov 2026: C$1.92 (€1.22), in the fair range. Same range as the rating.
The new shares and options each path needs are re-priced at each level.
At the rankings' own target: 1.19×. The rankings page's own range for the value if it works, about 2 – 6.7 times today's price (a takeover at 0.3 – 0.45 of a study value with the build cost brought up to date, or a funding partner at about 2 times), mid-point 4.35, gives an expected value of 1.19× with the same value if it fails: fair, like the counted rating. Shown beside the rating, never counted.
At the top metal price on the rankings: If copper were US$8/lb, the top regular price on the rankings page (not a forecast): value if it works 6.35×, expected value 1.59×, still fair. Shown beside the rating, never counted.
The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).
Fair. At C$2.04 (close of Fri 13 Nov 2026) the expected value of a share in four years is 1.38 times today's price (about 8% a year): above the 1.1× line for expensive, below the 2.0× line for cheap. The expected value weighs a share's value with and without a deal by their chances. It rests on one input: what a buyer or funder would pay for Casino. At the median that copper projects with a feasibility study trade at today (0.22 of their study value at today's metal, measured as price to net asset value (the study value of the projects plus cash, minus debt), P/NAV), a deal makes a share worth 5.27 times today's price; with no deal it is worth 0.40 times today's price. The analyst puts the chance of a bid or funding deal by 13 Nov 2030 at 20% (a judgement). The price is low for known reasons: no permit timetable, a C$3.6B build against a C$462M company, and Rio Tinto's rights ending on 30 Nov 2026.
Cheap below about C$1.41, if there is also a written reason the market is wrong, a dated catalyst and no tripped thesis breaker. Without a price move it would take evidence that a buyer or funder would pay about 0.35 or more of Casino's study value at today's metal (the peer median is 0.22): for example Rio Tinto renewing its rights with a named path (they end on 30 Nov 2026 unless both sides extend them), a dated timetable from YESAB (the Yukon assessment board), or a signed funding deal.
Expensive above about C$2.56 with nothing else changed, or if deals for comparable projects came in at about 0.16 of study value or less, with a written reason. The thesis breakers (dated tests, set in advance, that would show the case is wrong) point the same way: Rio Tinto below 5.0% and Mitsubishi Materials below 3.0% of the shares, no YESAB Panel terms of reference by 31 Dec 2027, or a share issue below C$2.00.
Set in advance: any one of these would mean the plan has failed or the rating must be redone.
| When | What |
|---|---|
| 30 Nov 2026 | Rio Tinto's investor rights agreement ends unless both sides extend it |
| Q4 2026 to H1 2027 (undated) | YESAB sufficiency decision and Panel terms of reference |
| about 25 Mar 2027 | Audited 2026 results and annual report |
| 30 Nov 2028 | Mitsubishi Materials' investor rights agreement ends |
Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.
The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.
The same function at the rankings page's regular price columns: sensitivities, not forecasts. Only Casino's study value moves (both one-metal tables, straight line at the last slope, converted at the ECB rate); the peer multiple (0.2175), the fail value and the shares are held fixed. Gold held at US$3,886.3 in the copper columns. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
Swipe the table sideways for more columns →
| Price | Expected value | If it works | If it fails | Cheap below | Expensive above |
|---|---|---|---|---|---|
| copper US$5/lb | 1.24× · fair | 4.59× | 0.40× | C$1.27 | C$2.30 |
| copper US$6/lb | 1.36× · fair | 5.17× | 0.40× | C$1.38 | C$2.52 |
| copper US$7/lb | 1.47× · fair | 5.76× | 0.40× | C$1.50 | C$2.73 |
| copper US$8/lb | 1.59× · fair | 6.35× | 0.40× | C$1.62 | C$2.95 |
Western Copper and Gold is worth about C$10.76 a share in Nov 2030 if the plan works and C$0.82 if it fails. At a 20% chance the expected value is C$2.81, 1.38× today's C$2.04: fair.
Each step says first what its numbers are, then what the step does, then shows the sum.
Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.
If a partner or buyer comes, Casino is valued like its peers today. Nothing is credited separately, so the multiple is P/NAV.
All of the company's value divided by all the shares there will be (226.28 + 8.66 = 234.93M), then compared with today's price.
If no deal comes, Casino is valued like the cheapest peer in its group.
Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.
The share prices at which, everything else as above, the rating would turn.
Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.
The analyst's lines below are for the earlier case (chance 25%, expected value 1.621×). The calculation in brief above uses the case of 16 Nov.
Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.
Casino's 2022 study at today's metal (A2, X1): copper C$3,917M + (7.041 − 5.00) × 1,132 = C$6,227.6M; gold C$3,310M + (4,432.9 − 2,200) × 1.9533 = C$7,671.5M; sum less the base C$2,334M = C$11,565.2M. Works (A1, P/NAV; nothing credited separately): median of the whole copper FS / permitted group (Western 0.040, Highland 0.071, Marimaca 0.364, Ivanhoe 0.373) = 0.2175 × 11,565.2 = C$2,515.4M + option money C$12.54M = C$2,528.0M ÷ 234.93M shares = C$10.76. Fail (F1, works and stall group coincide → lowest name): Highland 1.20¢ × 10,720 Mlb = US$128.6M = C$183.4M + cash C$4.47M = C$187.9M ÷ 228.21M = C$0.82. No raise, no warrants, so nothing is re-priced at the levels.
| Metal column | E | Works | Fail | Cheap below | Expensive above |
|---|---|---|---|---|---|
| copper US$5/lb | 1.45× | 4.59× | 0.40× | C$1.48 | C$2.69 |
| copper US$6/lb | 1.60× | 5.17× | 0.40× | C$1.63 | C$2.96 |
| copper US$7/lb | 1.74× | 5.76× | 0.40× | C$1.78 | C$3.23 |
| copper US$8/lb | 1.89× | 6.35× | 0.40× | C$1.93 | C$3.50 |
Method: Only Casino's study value moves (both one-metal tables, straight line at the last slope, X1 at the ECB rate); the peer multiple (0.2175), the fail value and the shares are held fixed. Gold held at US$3,886.3 in the copper columns. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
# Western Copper and Gold (TSX: WRN) - value rating v0.4.1 (16 Nov 2026). C$ unless marked.
# Rule set v0.4.1: A1 on P/NAV (no own cash or raise credited), whole-group median for groups of fewer
# than five names; F1 central = lowest name of the stall group (works and stall groups coincide); q = 0.
FX = 1.5758 / 1.1052 # C$ per US$, ECB reference rates 13 Nov 2026
DEFAULTS = dict(
P=2.04, # share price, C$ (start close 13 Nov 2026, TSX)
pw=0.25, # chance it works (desk), 0-1
cu=6.173, # copper, US$/lb (LME cash 13 Nov 2026)
au=3886.3, # gold, US$/oz (COMEX close 13 Nov 2026)
pnav=[0.040, 0.071, 0.364, 0.373], # copper FS / permitted P/NAV today: Western (X1), Highland, Marimaca, Ivanhoe Electric
fail_c_lb=1.20, # stalled value, US cents per lb Cu (Highland, lowest name of the group)
lb=10720.0, # Mlb Cu, all categories (gold not counted)
cash_fail=4.469, # C$M cash at 13 Nov 2030 if no deal: 120.669 - 30 x 4.12 + 7.4 interest (estimate)
years=4.0,
)
SHARES = 226.276171 # M, MD&A 5 Nov 2026
OPTIONS = [(1.000000, 1.35), (2.814600, 1.58), (0.709668, 2.04), (1.112000, 2.19), (0.685256, 4.18)] # (M, strike C$)
OPT_UNKNOWN = 0.400000 # M options added after 30 Sep 2026, terms not available: shares, no money
UNITS = 1.351920 + 0.581854 # RSUs + DSUs, M
def npv_today(cu, au):
"""Casino 2022 FS after-tax NPV8, C$M, re-based by rules A2 and X1 (last stated slopes, added)."""
k = FX / 1.25 # study at C$1.25 per US$
cu_s, au_s = cu * k, au * k
cu_part = 3917 + (cu_s - 5.00) * 1132 if cu_s >= 4.50 else 3351 + (cu_s - 4.50) * 1132
au_part = 3310 + (au_s - 2200) * (293 / 150)
return cu_part + au_part - 2334
def _median(x):
s = sorted(x); n = len(s)
return s[n // 2] if n % 2 else (s[n // 2 - 1] + s[n // 2]) / 2
def value(inp=None):
i = dict(DEFAULTS, **(inp or {}))
npv = npv_today(i['cu'], i['au'])
m = i.get('m', _median(i['pnav']))
eq_w = m * npv
vps0 = eq_w / SHARES
itm = [(n, k) for n, k in OPTIONS if k < vps0] # options struck below the works value
opt_money = sum(n * k for n, k in itm)
sh_w = SHARES + sum(n for n, _ in itm) + (OPT_UNKNOWN if itm else 0) + UNITS
Mw_ps = (eq_w + opt_money) / sh_w
A = i['fail_c_lb'] / 100 * i['lb'] * FX + i['cash_fail']
sh_f = SHARES + UNITS # no option in the money at the fail value
itm_f = [(n, k) for n, k in OPTIONS if k < A / sh_f]
sh_f += sum(n for n, _ in itm_f); A += sum(n * k for n, k in itm_f)
Mf_ps = A / sh_f
P = i['P']
E = (i['pw'] * Mw_ps + (1 - i['pw']) * Mf_ps) / P
return dict(npv=npv, m=m, shares_works=sh_w, shares_fail=sh_f, Mw_ps=Mw_ps, Mf_ps=Mf_ps, M_stalled_ps=Mf_ps,
Mw=Mw_ps / P, Mf=Mf_ps / P, E=E, per_year=E ** (1 / i['years']) - 1)
def levels(inp=None):
"""No raise, no warrants: the value per share does not depend on the price, so the levels are V / line."""
i = dict(DEFAULTS, **(inp or {}))
r = value(i); y = i['years']
V = r['E'] * i['P']
cheap = V / 2.0 ** (y / 4); exp = V / 1.1 ** (y / 4)
return dict(cheap_below=cheap if cheap > r['M_stalled_ps'] else None, expensive_above=exp,
fail_ps=r['M_stalled_ps'], V=V)
if __name__ == '__main__':
r = value(); l = levels()
print({k: round(v, 4) for k, v in r.items()}); print({k: (round(v, 4) if v else v) for k, v in l.items()})
assert round(r['E'], 2) == 1.62 and round(r['Mw'], 2) == 5.27 and round(r['Mf'], 2) == 0.40 # test line
# desk, 16 Nov: the counted case
DEFAULTS.update({'pw': 0.2})Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.
Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.
How we rate a share, with two worked examples →
Human judgement (Chung Huynh) on what matters. Machine effort on everything else.
Chung Huynh is an independent equity researcher, not a licensed financial adviser.
The author may own shares in companies rated here and may buy or sell them at any time.
A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.
Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.
Educational research, not personal financial advice.