All value ratingsGold & silver developers

Vizsla Silver

NYSE American: VZLA · Gold & silver developers

A silver developer in Sinaloa, Mexico (the Panuco project): feasibility study done and funded, but the site has been closed since January 2026 and a permit is pending.

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Value rating · 16 Nov 2026 · start close 13 Nov 2026
CheapFairExpensive

Fair: 1.85× if Panuco is built and producing, 0.95× if not · low confidence

Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 35% (before, 38%, the figure the rankings page used); a working Panuco is valued like a producing mine (0.80× its study value) instead of like a mine still being built (0.442×). Before: 0.81×, which the analyst had kept fair on judgement. Now: 1.27×, fair. Re-run by the analyst and checked by an independent re-run.

Confidence: low. Low. The value if it works rests on one choice, how a producing Panuco is valued: at 0.80 times its study value the expected value is 1.27×, at 0.90 times 1.38×, at 1.0 times 1.50× (the late build valued the same way, and the convertible notes counted as shares where they would convert); valued like a silver mine still being built (0.44 times, two names) it would be 0.80×, under the 1.08× line for expensive, a case the earlier rating kept fair only because no written reason for expensive passed. The chance is a judgement: the reopening and the permit have no date. The missing cheap price is a near miss: at a chance of 36% or more the arithmetic would give one, at about US$1.89.

You pay todayUS$3.07 · €2.78 a share
Close of Fri 13 Nov 2026 on NYSE American (in US$), from the desk's nightly price record, equal to stockanalysis.com's dated price history read on 15 Nov 2026, and to a StockAlarm quote dated 13 Nov 2026.

What one share should be worth in Dec 2029, by the analyst's estimate:

35% chance it works
US$5.68€5.14if it works · 1.85×
US$2.91€2.64if it fails · 0.95×

Works means Panuco built within the study's capex plus contingency and producing at or near design output by 31 Dec 2029, after the site reopens and the permit (MIA) is granted by mid-2027.

Fails means Anything else by 31 Dec 2029: a late build (site reopened, permit granted, mine decided or under construction; 4 in 10 of these outcomes, valued 2 years late) or a stalled project (no build; 6 in 10).

Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.1052 US$ per €); the rating itself is worked out in US dollars, and future exchange rates will differ.

Expected value in Dec 2029
US$3.88€3.51
You pay today
US$3.07€2.78
1.27× today's price+7.8% a year over 3.13 years
35% × 1.852× + 65% × 0.949× = 1.265×
chance it works × value if it works + chance it fails × value if it fails

Expensive at 1.08× or less, cheap at 1.72× or more (lines scaled to the 3.13-year horizon). Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.

Price levels · everything else fixed
Cheap belownone
Last close (Fri 13 Nov)US$3.07 €2.78
Expensive aboveUS$3.60 €3.26

Latest close, Mon 16 Nov 2026: US$2.93 (€2.66), in the fair range. Same range as the rating.

The new shares and options each path needs are re-priced at each level.

No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).

Why is there no cheap price?

A share counts as cheap here if, on average, it should be worth at least 1.72 times its price by Dec 2029. Worked out on paper, that would happen at US$1.87 a share. But at that price a share would still be worth US$1.89 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.

Beside the rating · not counted in it

At the rankings' own target: 1.34×. The rankings page's own target for a producing mine, 0.9 times the study value at today's metal (the middle of its 0.8 – 1.0 band), gives 2.06 times today's price if it works (the convertible notes then turn into shares, which is counted) and an expected value of 1.34× with the counted value if it fails: fair, like the counted rating. Shown beside the rating, never counted.

At the top metal price on the rankings: If gold were US$7,000/oz and silver US$108/oz, the top regular prices on the rankings page (not a forecast): value if it works 4.09× (the US$300M of convertible notes then turn into shares at US$5.84, which is counted), expected value 2.52× (1.83× without late builds). That would pass the cheap line by the numbers, but a cheap label also needs a written reason, a dated catalyst and no failed thesis test. Shown beside the rating, never counted.

The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).

Why

Fair. At US$3.07 (close of Fri 13 Nov 2026) the expected value of a share at the end of 2029 is 1.27 times today's price, between the 1.077× expensive line and the 1.72× cheap line for that 3.1-year horizon. The expected value weighs a share's value if the plan works and if it fails by their chances. If it works, Panuco is built and producing by the end of 2029, so it is valued like a producing mine: 0.80 times its study value (the after-tax net present value, NPV, in its feasibility study, re-worked at today's metal prices), the low end of the 0.8 – 1.0 times the rankings page uses for producing mines, plus the build money and cash, less the US$300M convertible notes. That is 1.85 times today's price a share. The analyst puts the chance at 35% (a judgement); otherwise (a late build or a stalled project) a share is worth 0.95×. The site has been closed since 23 Jan 2026, and neither the return nor the permit has a date.

What would change the rating

Price alone won't make this cheap. What could raise the value: a company release confirming crews back on the Panuco site (company aim by 31 Dec 2026; a thesis breaker trips if not by 31 Mar 2027), the environmental permit (MIA) and change of land use (company aim Q4 2026 to Q1 2027), then a construction decision with an updated capex and schedule, needed by about the end of 2027 to reach design output by the end of 2029 (an estimate). The results due by 15 Dec 2026 will show cash and idle costs.

It would turn expensive above about US$3.60 with nothing else changed (an expensive label also needs a written reason), or if producing silver mines came to be valued below about 0.65 times their study value (like a mine still being built, 0.44 times, it reads 0.80×). The thesis breakers (dated tests, set in advance, that would show the case is wrong) would force a re-rating: no crews back on site by 31 Mar 2027, no MIA and no construction decision by 31 Dec 2027, or cash below US$380M at 31 Oct 2026 or an updated initial capex above US$300M.

Thesis breakers

Set in advance: any one of these would mean the plan has failed or the rating must be redone.

Dated events to watch

WhenWhat
by 15 Dec 2026Results for the quarter to 31 Oct 2026: cash and idle cost
by 31 Dec 2026 (company aim)Return to site under a new security arrangement
Q4 2026 - Q1 2027 (company aim)Environmental permit (MIA) and change of land use
after the permitConstruction decision with updated capex and schedule
by 17 Mar 2027Results for the quarter to 31 Jan 2027
Try your own assumptions · private test

Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.

CheapFairExpensive
Worth in Dec 2029
You pay today
Chance it works
If it works
If it fails
Today's price against the two price levels
Cheap below
Today
Expensive above
Main assumptions
More judgement calls ()

The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.

At other metal prices

The same function at the rankings page's regular price columns: sensitivities, not forecasts. Panuco's NPV on its +25%/+50% table (deck-revenue weights Ag 58.3%, Au 41.7%), last slope beyond +50%; the multiple and the stalled value held; the late build moves with the study value. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

Swipe the table sideways for more columns →

PriceExpected valueIf it worksIf it failsCheap belowExpensive above
gold US$3,500 / silver US$451.14× · fair1.63×0.88×noneUS$3.26
gold US$4,500 / silver US$691.64× · fair2.52×1.17×US$2.29US$4.67
gold US$5,500 / silver US$852.00× · fair3.15×1.38×US$2.68US$5.70
gold US$6,500 / silver US$1002.34× · fair3.77×1.58×US$3.07US$6.68
gold US$7,000 / silver US$1082.52× · cheap4.09×1.68×US$3.27US$7.19

How we got this

Show the full calculationThe key steps first; every step and input one tap further

Vizsla Silver is worth about US$5.68 a share in Dec 2029 if the plan works and US$2.91 if it fails. At a 35% chance the expected value is US$3.88, 1.27× today's US$3.07: fair.

The calculation in brief

Each step says first what its numbers are, then what the step does, then shows the sum.

Today

1What the market pays today
The numbers
US$3.07
closing share price, 13 Nov 2026
382.16M
shares with options, share units and shares to be issued
What this step does

Everything below is compared with this price.

Calculation
382.16M × US$3.07 = US$1,173.2M

If it works

2Panuco's study value at today's metal
The numbers
US$2,683.0M
the study's NPV re-priced to today's silver and gold
0.8000
per dollar of study value for a producing mine: the low end of the 0.8 – 1.0× the rankings use for producing mines
What this step does

If the plan works, Panuco is producing by the end of 2029, so it is valued like a producing mine. Valued like a mine still being built (0.44×, Silver Tiger and GoGold) the rating would be expensive: see the judgement calls.

Calculation
0.8000 × US$2,683.0M = US$2,146.4M
3Value of the whole company if built
The numbers
US$2,146.4M
Panuco
US$198M
build money, added once
US$92M
cash left
US$36.1M
option money
US$300M
convertible notes, deducted
What this step does

On the enterprise-value basis the build money is added once.

Calculation
2,146.4 + 198 + 92 + 36.1 − 300 = US$2,172.5M
4Adding up: one share if it works
The numbers
US$2,172.5M
the company's value if it works (the parts above)
382.16M
all the shares there would be, counting options, share units and shares to be issued
What this step does

All of the company's value divided by all the shares there will be (382.16M), then compared with today's price.

Calculation
US$2,172.5M ÷ 382.16M = US$5.68; US$5.68 ÷ US$3.07 = 1.852× today's price

If it fails

5If it stalls
The numbers
US$181.86/oz
Panuco unbuilt, per ounce (AbraSilver), on 4.242 Moz, after a rescue share sale
What this step does

If no build by end-2029, Panuco is valued like other unbuilt silver projects.

Calculation
US$181.86 × 4.242 Moz, then per share (after a rescue share sale where cash runs short) = US$1.894 a share = 0.617×
6If it comes late
The numbers
2 years
how late
10.7% a year
the desk's required return, used to discount the late value
What this step does

A late build: the works value without the cash left, discounted two years.

Calculation
works case, with its own extra funding, discounted for the delay = US$4.45 a share = 1.448×
7Value if it fails: late builds and stalls together
The numbers
40%
of the misses are late builds (an estimate nobody measures yet)
60%
are stalls
What this step does

Each kind of miss counts by its share.

Calculation
0.40 × US$4.45 + 0.60 × US$1.894 = US$2.91 = 0.949× today's price

The result

8Weighing the two futures
The numbers
35%
the desk's chance that the plan works
1.852×
if it works
0.949×
if it fails
What this step does

Each future counts by its chance. Over 3.13 years, 1.08× or less is expensive and 1.72× or more is cheap; between is fair. Expensive and cheap also need the written tests.

Calculation
0.35 × 1.852 + 0.65 × 0.949 = 1.265× = US$3.88
9The two price levels
The numbers
1.08× and 1.72×
the expensive and cheap lines
re-priced
the new shares and the options at each price
What this step does

The share prices at which, everything else as above, the rating would turn.

Calculation
solved by the function at each price = expensive above US$3.60 · no cheap price (see the price levels at the top)

Judgement calls to challenge

Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.

Chance the plan works
We used: Desk 35% → 1.27× · fair
Alternatives, one at a time:
  • Before 16 Nov 38%1.29× · fair
  • 25% (10 points lower)1.17× · fair
  • 45% (10 points higher)1.36× · fair
About this input
The analyst's estimate, from the deep dive, that the company reaches the “works” state above by its date. No measured base rates exist yet for these stages, so this is a judgement call.
Silver price, held flat
We used: Desk US$49.121 (COMEX, 13 Nov) · gold US$3,886 → 1.27× · fair
Alternatives, one at a time:
  • US$45 · gold US$3,5001.14× · fair
  • US$69 · gold US$4,5001.64× · fair
  • US$85 · gold US$5,5002.00× · fair
  • US$100 · gold US$6,5002.34× · fair
  • US$108 · gold US$7,0002.52× · cheap
About this input
The chips are the gold and silver rankings' price columns (they move gold too), not forecasts.
Panuco if it works, × its study value
We used: Desk 0.800 (producing mine, low end) → 1.27× · fair
Alternatives, one at a time:
  • Producing mine, middle 0.9001.38× · fair
  • At study value 1.0001.50× · fair
  • Mine still being built 0.442 (Silver Tiger, GoGold)0.80× · expensive
About this input
If the plan works, Panuco is producing by the end of 2029, so the desk values it like a producing mine: 0.8 – 1.0× its study value is what the rankings use for producing mines, and eleven of twelve producers in the desk's table trade above 0.82×. Until 16 Nov the rating used what the market pays for silver mines still being built (0.442×, two names).
Misses that are a late build
We used: Desk 40% → 1.27× · fair
Alternatives, one at a time:
  • None (the cheap test)1.05× · expensive
About this input
Of the outcomes that miss the works state, the share that is a build that comes late rather than a stall. Nobody measures this yet; the cheap test uses none. A late build can be worth less than a stall: it still needs the build money, raised by selling new shares, and it counts later, while a stalled project spends nothing more.

Every step

The analyst's arithmetic, line by lineAs written in the rating, with the metal-price table

The analyst's lines below are for the earlier case (chance 38%, expected value 0.815×). The calculation in brief above uses the case of 16 Nov.

Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.

Panuco at today's metal (A2): +32.9% on the deck (revenue weights) → US$2,683.0M. A1 on EV: silver funded / in construction EV ÷ NPV = Silver Tiger 0.286, GoGold 0.598 → median 0.4417 × 2,683.0 = US$1,184.9M; + build money 198 + cash left 92 + option money 36.1 − notes 300 = US$1,211.0M ÷ 382.16M = US$3.17. Late: without the 92 left (spent while idle), ÷ 1.10668^2 → US$2.39. Stalled: AbraSilver US$181.86 × 4.242 Moz = US$771.5M; F2 raise for the US$44.9M short of the notes → US$1.89.

  • Start: US$3.07 (€2.78), close of Fri 13 Nov 2026 (source as v0.4). Shares by branch: works 382.160M, late 382.160M, fail 407.415M.
  • If it works: US$3.17 a share = 1.032×.
  • If it fails: late build US$2.39 (0.779×), stalled US$1.89 (0.617×); q = 0.4: Mf = US$2.09 = 0.682×.
  • E = 0.38 × 1.0322 + 0.62 × 0.6816 = 0.8148 (-6.3% a year over 3.13 years; lines: cheap 1.721, hurdle 1.374, expensive 1.0775). E at q = 0: 0.7747.
  • Chance the price implies for the hurdle: not reachable (even a certain success is below the hurdle); cheap at no chance; expensive at every chance.
  • Price levels (everything else fixed, new shares re-priced at each price): expensive above US$2.32 (€2.10); the arithmetic's cheap level is US$1.45, against a stalled value of US$1.89 a share at that price: no cheap level (rule F1).
  • Yardstick B (stored, not counted): works 1.93× (the row's own target, as v0.4) → E 1.156× with the counted fail value.
  • Low case (m = 0.2857): Mw 0.68×, Mf 0.57×, E 0.61×.
  • High case (m = 0.5196): Mw 1.21×, Mf 0.74×, E 0.92×.
  • Metal −10% / +10%: E 0.74× / 0.89×. Bull (shown, never counted): if gold US$7,000 / silver US$108, works 2.43×, E 1.63×.
Metal column E Works Fail Cheap below Expensive above
gold US$3,500 / silver US$45 0.74× 0.91× 0.64× no cheap level US$2.12
gold US$4,500 / silver US$69 1.05× 1.44× 0.82× no cheap level US$3.00
gold US$5,500 / silver US$85 1.29× 1.84× 0.95× US$2.30 US$3.67
gold US$6,500 / silver US$100 1.51× 2.23× 1.07× US$2.70 US$4.30
gold US$7,000 / silver US$108 1.63× 2.43× 1.14× US$2.90 US$4.64

Method: Panuco's NPV on its +25%/+50% table (deck-revenue weights Ag 58.3%, Au 41.7%), last slope beyond +50%; the multiple and the stalled value held; the late build moves with the study value. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

The rating function itself (Python)The exact code behind the card, the sliders and this calculation
# Vizsla Silver (NYSE American: VZLA) - value rating v0.4.1 (16 Nov 2026). US$M; share values US$.
# Horizon: works date 31 Dec 2029 (3.13 years); lines carried to it (cheap 1.72x, expensive 1.077x).
# Rule set v0.4.1: a mine not yet built is valued by rule A1, never by the producer rule. A1 on EV / study NPV:
# silver 'funded / in construction' median (Silver Tiger 0.286, GoGold 0.598), with the build money that goes
# into the project (net initial cost 173 + working capital 25) and the cash left (92) added once, notes deducted.
# F3: q = 0.4; late = the works case without the 92 left (spent on holding costs) discounted 2 years at 10.668%.
# F1: stalled at AbraSilver US$181.86/oz AuEq (cap US$230.82), F2 raise.
DEFAULTS = dict(
    P=3.07,            # share price, US$ (start close 13 Nov 2026)
    pw=0.38, q=0.4, delay=2.0,
    ag=49.121, au=3886.3,
    ev_nav=[185.0 / 647.5, 684.0 / 1144.6],   # Silver Tiger, GoGold: EV / NPV at today's metal (table C-3(a) v2)
    build=173.0 + 25.0,  # US$M into the project (net initial cost, working capital; estimates)
    cash_left=92.0,      # US$M left at the works date (410.9 - 319 of spending; estimate)
    opt_money=36.1,      # US$M option money (works and late)
    notes=300.0,         # US$M convertible notes at face (conversion US$5.84, out of the money in every case below)
    stalled_per_oz=181.86, cap_per_oz=230.82, oz=4.242,
    cash_fail=255.1,     # US$M at end-2029 in a stall incl. 21.8 option money (estimate)
    years=3.132,
)
SH_WORKS = 382.16           # M shares incl. options, share units, shares to be issued
SH_FAIL0 = 378.20           # M before the F2 raise in a stall
R = 1.5 ** 0.25

def npv_today(ag, au):
    """Panuco FS after-tax NPV5, US$M: 1,802 at the deck (35.50 / 3,100), +668.5 per +25% (both metals),
    deck-revenue weights Ag 58.3% / Au 41.7%; straight line, last slope beyond +50%."""
    move = 0.583 * (ag / 35.50 - 1) + 0.417 * (au / 3100 - 1)
    return 1802 + move / 0.25 * ((3139 - 1802) / 2)

def _m(i):
    s = sorted(i['ev_nav']); return i.get('m', (s[0] + s[-1]) / 2 if len(s) == 2 else s[len(s) // 2])

def _branches(i, P):
    npv = npv_today(i['ag'], i['au'])
    Vw = _m(i) * npv + i['build'] + i['cash_left'] + i['opt_money'] - i['notes']
    Mw_ps = Vw / SH_WORKS
    # desk, 16 Nov (analyst v0.4.2): above US$5.84 a share the US$300M notes turn into 51.37M shares and are no longer deducted
    conv = Mw_ps > 5.84
    if conv:
        Mw_ps = (Vw + i['notes']) / (SH_WORKS + 51.37)
    Ml_ps = ((Vw - i['cash_left'] + (i['notes'] if conv else 0)) / (SH_WORKS + (51.37 if conv else 0))) / R ** i['delay']
    A = min(i['stalled_per_oz'], i['cap_per_oz']) * i['oz']
    s = max(0.0, i['notes'] - i['cash_fail'])
    if A - s <= 0: Ms_ps = 0.0
    else:
        p = 0.8 * (A - s) / SH_FAIL0; Ms_ps = A / (SH_FAIL0 + s / p)
    Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
    sh_f = SH_FAIL0 + (s / p if A - s > 0 else 0)
    return dict(npv=npv, m=_m(i), shares_works=SH_WORKS, shares_late=SH_WORKS, shares_fail=sh_f, Mw_ps=Mw_ps, M_late_ps=Ml_ps, M_stalled_ps=Ms_ps, Mf_ps=Mf_ps)

def value(inp=None):
    i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
    E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
    Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
    y = i['years']
    return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_late=b['M_late_ps'] / P, M_stalled=b['M_stalled_ps'] / P,
                E=E, E_q0=Eq0, cheap_line=2.0 ** (y / 4), exp_line=1.1 ** (y / 4), per_year=E ** (1 / y) - 1)

def levels(inp=None):
    """No new shares in any branch and the notes stay out of the money: the value per share does not depend on
    the price, so the levels are V / line."""
    i = dict(DEFAULTS, **(inp or {})); r = value(i); V = r['E'] * i['P']
    cheap = V / r['cheap_line']; exp = V / r['exp_line']
    return dict(cheap_below=(cheap if cheap > r['M_stalled_ps'] else None), cheap_arith=cheap, expensive_above=exp,
                fail_ps=r['M_stalled_ps'], V=V)

if __name__ == '__main__':
    r = value(); l = levels()
    print({k: round(v, 4) for k, v in r.items()}); print(l)

# desk, 16 Nov: the counted case
DEFAULTS.update({'m': 0.8, 'pw': 0.35})
The inputs (17)Each marked fact, estimate or desk choice, with its source

Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.

The function's inputs

Share price at the start closeFact
3.07
share price, US$ (start close 13 Nov 2026)
Chance the plan worksDesk choice
0.35
see the analyst's arithmetic
Misses that are a late buildDesk choice
0.4
see the analyst's arithmetic
How late a late build is, yearsDesk choice
2
see the analyst's arithmetic
Silver price, held flatFact
49.121
COMEX silver close, 13 Nov 2026
Gold price, held flatFact
3,886.3
COMEX gold close, 13 Nov 2026
ev navDesk choice
0.2857, 0.5976
Silver Tiger, GoGold: EV / NPV at today's metal (table C-3(a) v2)
buildEstimate
198
US$M into the project (net initial cost, working capital; estimates)
cash leftEstimate
92
US$M left at the works date (410.9 - 319 of spending; estimate)
opt moneyDesk choice
36.1
US$M option money (works and late)
notesDesk choice
300
US$M convertible notes at face (conversion US$5.84, out of the money in every case below)
Panuco if it stalls, US$ an ounceDesk choice
181.86
see the analyst's arithmetic
cap per ozDesk choice
230.82
see the analyst's arithmetic
ozDesk choice
4.242
see the analyst's arithmetic
cash failEstimate
255.1
US$M at end-2029 in a stall incl. 21.8 option money (estimate)
Years to the end of the horizonDesk choice
3.132
see the analyst's arithmetic
Panuco if it works, × its study valueDesk choice
0.8
see the analyst's arithmetic

Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.

Sources

How we rate a share, with two worked examples →

Back to all value ratings (14 companies)

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Chung Huynh is an independent equity researcher, not a licensed financial adviser.

The author may own shares in companies rated here and may buy or sell them at any time.

A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.

Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.

Educational research, not personal financial advice.