Ucore Rare Metals

TSXV: UCU · Critical minerals

A rare-earth processor, not a miner: it is building a separation plant in Louisiana, USA, after a demonstration plant in Kingston, Canada. No published plant economics yet.

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Value rating · 16 Nov 2026 · start close 13 Nov 2026
CheapFairExpensive

Expensive: even certain success is worth about 1.05× · low confidence

Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 25% (before, 30%, the figure the rankings page used). Before: 0.64×, expensive. Now: 0.61×, expensive. Re-run by the analyst and checked by an independent re-run.

Confidence: low. Low. There is no company study; the value if it works rests on one comparable company (Lynas, an integrated miner; enterprise value dated 27 Oct 2026); cash is an estimate until the Q3 statements; the start close could not be re-read on the web. The label itself is robust: certain success is worth only 1.05×, so it stays expensive at any chance; with more late builds (5 in 10 misses) the expected value is 0.66×, on the rankings page's own target 0.65×, and at NdPr (the rare-earth oxide used in magnets) oxide US$180/kg 0.94×.

You pay todayC$2.18 · €1.38 a share
Close of Fri 13 Nov 2026 on the TSX Venture Exchange (UCU.V): C$2.18, up 4.81% from C$2.08, from Yahoo Finance's quote page dated at that close (a quote page, not a dated price history), equal to the desk's nightly price record.

What one share should be worth in Nov 2030, by the analyst's estimate:

25% chance it works
C$2.29€1.45if it works · 1.05×
C$1.02€0.65if it fails · 0.47×

Works means Machine A runs on commercial feed by 31 Dec 2027 and a binding offtake is signed.

Fails means That has not happened by 31 Dec 2027: the plant runs about 18 months late (4 in 10 of these outcomes) or stalls (6 in 10).

Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.5758 C$ per €); the rating itself is worked out in Canadian dollars, and future exchange rates will differ.

Expected value in Nov 2030
C$1.34€0.85
You pay today
C$2.18€1.38
0.61× today's price−11.5% a year over 4 years
25% × 1.050× + 75% × 0.469× = 0.615×
chance it works × value if it works + chance it fails × value if it fails

Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.

Price levels · everything else fixed
Cheap belownone
Last close (Fri 13 Nov)C$2.18 €1.38
Expensive aboveC$1.16 €0.73

Latest close, Mon 16 Nov 2026: C$2.02 (€1.28), in the expensive range. Same range as the rating.

The new shares and options each path needs are re-priced at each level.

No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).

Why is there no cheap price?

A share counts as cheap here if, on average, it should be worth at least 2.00 times its price by Nov 2030. Worked out on paper, that would happen at C$0.44 a share. But at that price a share would still be worth C$0.52 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.

Beside the rating · not counted in it

At the rankings' own target: 0.65×. The rankings page's own target for a working Machine A (a range of about 0.25 – 2.65 times today's price, centre 1.18×) gives an expected value of 0.65× with the same value if it fails: still expensive. Shown beside the rating, never counted.

At the top metal price on the rankings: If NdPr oxide (the main rare-earth product used in magnets) were US$180/kg, the top regular price on the rankings page (not a forecast): value if it works 1.72×, expected value 0.94×, still expensive. Shown beside the rating, never counted.

The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).

Why

Expensive. At C$2.18 (close of Fri 13 Nov 2026) the expected value of a share in four years is 0.61 times today's price (about -11% a year), under the 1.1× line below which a share counts as expensive. The expected value weighs what a share is worth if the plan works and if it fails by their chances. The plan: Machine A (600 tonnes a year of rare-earth oxide) runs on commercial feed with a binding offtake (a contract to sell the output) by 31 Dec 2027. Even certain success is worth only 1.05 times today's price, because the market already pays about US$300k for each tonne a year of Machine A's capacity, 69% of what it pays for Lynas's operating, mine-fed output, before the machine is installed or any binding contract is signed. If the plan fails, a share is worth 0.47 times today's price. The analyst's chance that it works (a judgement): 25%.

What would change the rating

Price alone won't make this cheap. What could raise the value: factory-acceptance results for Machine A (expected by 31 Dec 2026, marked overdue in the research records); its installation and commissioning (H1 2027); and a first binding feed or offtake contract (required by 31 Dec 2027). A binding feed and offtake contract with committed outside money for Line 1 would let the full 3,600 tonnes a year be valued like an operating producer. Canada's contribution agreement for Kingston has no company date.

Already expensive. It stays so at any price above about C$1.16 with nothing else changed, and it gets worse if Machine A's commissioning is re-dated past 30 Jun 2027, or if equity is raised below C$1.50 a share or cash falls below C$40M before Machine A is commissioned (these are thesis breakers: dated tests, set in advance, that would mean the rating must be redone).

Thesis breakers

Set in advance: any one of these would mean the plan has failed or the rating must be redone.

Dated events to watch

WhenWhat
by 30 Nov 2026Q3 2026 statements: cash, share count, Machine A spending
by 31 Dec 2026Factory-acceptance results for Machine A (overdue since September)
10 Jan 2027China's suspension of its October 2025 export controls expires
H1 2027Machine A installed and commissioned in Louisiana (company guidance)
31 Dec 2027Works date: Machine A on commercial feed and a binding offtake
Try your own assumptions · private test

Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.

CheapFairExpensive
Worth in Nov 2030
You pay today
Chance it works
If it works
If it fails
Today's price against the two price levels
Cheap below
Today
Expensive above
Main assumptions
More judgement calls ()

The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.

At other metal prices

The same function at the rankings page's regular price columns: sensitivities, not forecasts. Works and late EV move in proportion to NdPr oxide; stalled value, funding and shares fixed. Columns are the rankings' NdPr cases. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

Swipe the table sideways for more columns →

PriceExpected valueIf it worksIf it failsCheap belowExpensive above
NdPr US$75/kg0.45× · expensive0.72×0.37×noneC$0.82
NdPr US$95/kg0.55× · expensive0.91×0.42×noneC$1.01
NdPr US$130/kg0.71× · expensive1.24×0.53×noneC$1.35
NdPr US$180/kg0.94× · expensive1.72×0.68×C$0.62C$1.84

How we got this

Show the full calculationThe key steps first; every step and input one tap further

Ucore Rare Metals is worth about C$2.29 a share in Nov 2030 if the plan works and C$1.02 if it fails. At a 25% chance the expected value is C$1.34, 0.61× today's C$2.18: expensive.

The calculation in brief

Each step says first what its numbers are, then what the step does, then shows the sum.

Today

1What the market pays today
The numbers
152.070M
shares in issue (TSXV, Q3 2026 report)
C$2.18
closing share price, 13 Nov 2026
What this step does

Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.

Calculation
152.070M × C$2.18 = C$331.5M

If it works

2Machine A's value once running
The numbers
US$433.4k
what the market pays per tonne a year of separated rare-earth output (Lynas, 27 Oct 2026; one name)
600 t a year
Machine A's capacity
US$110/kg
NdPr oxide price; the value moves in proportion
What this step does

If Machine A runs with a binding sales contract by end-2027, it is valued like Lynas per tonne of capacity.

Calculation
US$433.4k × 600 × 110/110 = US$260.0M ÷ 0.7014 = C$370.8M
3The money still to raise
The numbers
C$7.1M
what cash, milestones and in-the-money options do not cover
C$1.744
price of new shares: today's price less 20%
What this step does

Only a small raise is needed before the works date; the C$150M Line 1 money is not part of this case.

Calculation
C$7.07M ÷ C$1.744 = 4.05M new shares
4Adding up: one share if it works
The numbers
C$370.8M
the company's value if it works (the parts above)
152.07M
shares in issue today
9.89M
new shares sold to fund the plan, plus options, warrants and share units that turn into shares
161.96M
all the shares there would be
What this step does

All of the company's value divided by all the shares there will be (152.07 + 9.89 = 161.96M), then compared with today's price.

Calculation
C$370.8M ÷ 161.96M = C$2.29; C$2.29 ÷ C$2.18 = 1.050× today's price

If it fails

5If it stalls
The numbers
C$96.1M
Element 25's whole value as a stand-in, plus half of Machine A's cost
What this step does

No rare-earth processing peers exist, so a stalled Ucore is valued on a stand-in.

Calculation
C$96.1M after a rescue share sale for the C$13.4M shortfall, then per share (after a rescue share sale where cash runs short) = C$0.520 a share = 0.239×
6If it comes late
The numbers
1.5 years
how late
10.7% a year
the desk's required return, used to discount the late value
What this step does

A plant that runs late is valued like the works case 1.5 years later, with C$30M more overhead to fund.

Calculation
works case, with its own extra funding, discounted for the delay = C$1.778 a share = 0.815×
7Value if it fails: late builds and stalls together
The numbers
40%
of the misses are late builds (an estimate nobody measures yet)
60%
are stalls
What this step does

Each kind of miss counts by its share.

Calculation
0.40 × C$1.778 + 0.60 × C$0.520 = C$1.023 = 0.469× today's price

The result

8Weighing the two futures
The numbers
25%
the desk's chance that the plan works
1.050×
if it works
0.469×
if it fails
What this step does

Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.

Calculation
0.25 × 1.050 + 0.75 × 0.469 = 0.615× = C$1.340
9The two price levels
The numbers
1.10× and 2.00×
the expensive and cheap lines
re-priced
the new shares and the options at each price
What this step does

The share prices at which, everything else as above, the rating would turn.

Calculation
solved by the function at each price = expensive above C$1.155 · no cheap price (see the price levels at the top)

Judgement calls to challenge

Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.

Chance the plan works
We used: Desk 25% → 0.61× · expensive
Alternatives, one at a time:
  • Before 16 Nov 30%0.64× · expensive
  • 15% (10 points lower)0.56× · expensive
  • 35% (10 points higher)0.67× · expensive
About this input
The analyst's estimate, from the deep dive, that the company reaches the “works” state above by its date. No measured base rates exist yet for these stages, so this is a judgement call.
NdPr oxide price, held flat
We used: Desk US$110 → 0.61× · expensive
Alternatives, one at a time:
  • US$750.45× · expensive
  • US$950.55× · expensive
  • US$1300.71× · expensive
  • US$1800.94× · expensive
About this input
The value of the plant moves in proportion to the price of NdPr oxide, the main rare-earth product (an estimate). The chips are the analyst's price columns.
Value of a tonne a year of capacity
We used: Desk US$433.4k (Lynas) → 0.61× · expensive
Alternatives, one at a time:
  • Low: build cost US$100k0.22× · expensive
  • High US$612.7k0.82× · expensive
About this input
What the market pays per tonne a year of separated rare-earth output: Lynas, an integrated miner, the only like-for-like name (27 Oct 2026). Low: what Machine A costs to build; high: halfway to MP Materials. This slider counts Machine A's 600 tonnes a year only. A case that values all 3,600 tonnes a year planned (see Confidence) needs a much lower value per tonne to turn fair.
Misses that are a late build
We used: Desk 40% → 0.61× · expensive
Alternatives, one at a time:
  • None (the cheap test)0.44× · expensive
About this input
Of the outcomes that miss the works state, the share that is a build that comes late rather than a stall. Nobody measures this yet; the cheap test uses none. A late build can be worth less than a stall: it still needs the build money, raised by selling new shares, and it counts later, while a stalled project spends nothing more.

Every step

The analyst's arithmetic, line by lineAs written in the rating, with the metal-price table

The analyst's lines below are for the earlier case (chance 30%, expected value 0.644×). The calculation in brief above uses the case of 16 Nov.

Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.

Unchanged from v0.4: Machine A at Lynas's US$433.4k per tpa × 600 = US$260.0M = C$370.8M ÷ 161.96M shares = C$2.29; late ÷ 1.10668^1.5 with C$30M more overhead → C$1.78; stalled C$96.1M with an F2 raise → C$0.52.

  • Start: C$2.18 (€1.38), close of Fri 13 Nov 2026 (source as v0.4). Shares by branch: works 161.956M.
  • If it works: C$2.29 a share = 1.050×.
  • If it fails: late build C$1.78 (0.815×), stalled C$0.52 (0.239×); q = 0.4: Mf = C$1.02 = 0.469×.
  • E = 0.30 × 1.0501 + 0.70 × 0.4694 = 0.6436 (-10.4% a year over 4.00 years; lines: cheap 2.000, hurdle 1.500, expensive 1.1000). E at q = 0: 0.4821.
  • Chance the price implies for the hurdle: not reachable (even a certain success is below the hurdle); cheap at no chance; expensive at every chance.
  • Price levels (everything else fixed, new shares re-priced at each price): expensive above C$1.22 (€0.77); the arithmetic's cheap level is C$0.61, against a stalled value of C$0.52 a share at that price: cheap below C$0.61 (€0.384).
  • Yardstick B (stored, not counted): works 1.18× (the row's own target, as v0.4) → E 0.683× with the counted fail value.
  • Metal −10% / +10%: E 0.59× / 0.70×. Bull (shown, never counted): if NdPr US$180/kg, works 1.72×, E 0.99×.
Metal column E Works Fail Cheap below Expensive above
NdPr US$75/kg 0.47× 0.72× 0.37× no cheap level C$0.86
NdPr US$95/kg 0.57× 0.91× 0.42× C$0.52 C$1.07
NdPr US$130/kg 0.74× 1.24× 0.53× C$0.72 C$1.43
NdPr US$180/kg 0.99× 1.72× 0.68× C$1.01 C$1.95

Method: Works and late EV move in proportion to NdPr oxide (the v0.4 method); stalled value, funding and shares fixed. Columns are the row's NdPr cases. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

The rating function itself (Python)The exact code behind the card, the sliders and this calculation
# Ucore Rare Metals (TSXV: UCU) - value rating v0.4.1 (16 Nov 2026). C$M; share values C$. Unchanged rules.
# Works: Machine A (600 tpa) running with a binding offtake by 31 Dec 2027, at Lynas's EV per tpa of REO output
# (US$433.4k; one name). Fail: q = 0.4 late (works EV discounted 1.5 years at 10.668%, 30 more of overhead) and a
# stall (Element 25's EV + half Machine A's capex = C$96.1M, F2 raise).
USD = 1.1052 / 1.5758                          # US$ per C$
DEFAULTS = dict(
    P=2.18, pw=0.30, q=0.4, delay=1.5,
    ev_per_tpa=433.4, tpa=600,      # US$k per tpa (Lynas, 27 Oct 2026); Machine A capacity
    ndpr=110.0,                     # US$/kg; works and late EV move in proportion (estimate)
    uses=55 / USD + 10 / USD + 25.0,  # Machine A remaining + first fill + 5 quarters of overhead (estimates)
    cash=75.0, milestones=21.1 / USD, late_extra=30.0,
    stalled=96.1, stalled_s=13.4,
    years=4.0,
)
SHARES = 152.070251
UNITS = 0.640 + 0.025710
INSTR = [(0.364511, 0.75), (0.501113, 1.75), (3.103334, 0.8787), (1.2, 1.3748)]  # warrants; option buckets (strike
# table not available: buckets rebuilt from v0.4's counts and proceeds at C$2.18, C$1.22 and C$0.61)
R = 1.5 ** 0.25
HI = 10

def _branches(i, P):
    itm = [(n, k) for n, k in INSTR if k < P]
    n_i = sum(n for n, _ in itm); money = sum(n * k for n, k in itm)
    EVw = i['ev_per_tpa'] * i['tpa'] / 1000 / USD * i['ndpr'] / 110.0
    gap = max(0.0, i['uses'] - i['cash'] - i['milestones'] - money)
    base = SHARES + UNITS + n_i
    Mw_ps = EVw / (base + gap / (0.8 * P))
    Ml_ps = EVw / R ** i['delay'] / (base + (gap + i['late_extra']) / (0.8 * P))
    n0 = SHARES + UNITS + 0.865624
    A, s = i['stalled'], i['stalled_s']; p = 0.8 * (A - s) / n0
    Ms_ps = A / (n0 + s / p)
    return dict(EV_works=EVw, gap=gap, shares_works=base + gap / (0.8 * P), Mw_ps=Mw_ps, M_late_ps=Ml_ps,
                M_stalled_ps=Ms_ps, Mf_ps=i['q'] * Ml_ps + (1 - i['q']) * Ms_ps)
def _E(i, P):
    b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b

def _cross(i, line, hi, lo=0.005, steps=4000):
    """Highest price at or below `hi` where E(P) >= line (scan down on a log grid, then bisect)."""
    import math
    prev = hi
    for k in range(steps + 1):
        P = hi * math.exp(math.log(lo / hi) * k / steps)
        if _E(i, P)[0] >= line:
            a, b = P, prev
            for _ in range(60):
                mid = (a + b) / 2
                a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
            return a
        prev = P
    return None

def levels(inp=None):
    i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = HI * i['P']
    exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
    fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
    return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
                cheap_arith=cheap, fail_ps_at_cheap=fps)

def value(inp=None):
    i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
    E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
    Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
    return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_stalled=b['M_stalled_ps'] / P, E=E, E_q0=Eq0,
                per_year=E ** (1 / i['years']) - 1)

if __name__ == '__main__':
    r = value(); l = levels()
    print({k: round(v, 4) for k, v in r.items()}); print(l)

# desk, 16 Nov: the counted case
DEFAULTS.update({'pw': 0.25})
The inputs (14)Each marked fact, estimate or desk choice, with its source

Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.

The function's inputs

Share price at the start closeFact
2.18
see the analyst's arithmetic
Chance the plan worksDesk choice
0.25
see the analyst's arithmetic
Misses that are a late buildDesk choice
0.4
see the analyst's arithmetic
How late a late build is, yearsDesk choice
1.5
see the analyst's arithmetic
Value of a tonne a year of capacityDesk choice
433.4
US$k per tpa (Lynas, 27 Oct 2026); Machine A capacity
tpaDesk choice
600
US$k per tpa (Lynas, 27 Oct 2026); Machine A capacity
NdPr oxide price, held flatEstimate
110
US$/kg; works and late EV move in proportion (estimate)
usesEstimate
117.677
Machine A remaining + first fill + 5 quarters of overhead (estimates)
CashDesk choice
75
see the analyst's arithmetic
milestonesDesk choice
30.0845
see the analyst's arithmetic
late extraDesk choice
30
see the analyst's arithmetic
Value if it stalls, C$MDesk choice
96.1
see the analyst's arithmetic
stalled sDesk choice
13.4
see the analyst's arithmetic
Years to the end of the horizonDesk choice
4
see the analyst's arithmetic

Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.

Sources

How we rate a share, with two worked examples →

Back to all value ratings (14 companies)

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Chung Huynh is an independent equity researcher, not a licensed financial adviser.

The author may own shares in companies rated here and may buy or sell them at any time.

A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.

Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.

Educational research, not personal financial advice.