TSXV: NEXG · Gold & silver developers
A gold developer in Canada (Goldboro, Nova Scotia, plus the paused Goliath project in Ontario): fully permitted, early works under way, updated study due by end-2026.
Fair: past the cheap line only if late builds count · low confidence
Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 40% (before, 50%, the figure the rankings page used); Goldboro's study value has its costs brought up to today (C$1,953.9M instead of C$2,254.8M at 2021 costs). Before: 2.49×, which the analyst had kept fair on judgement. Now: 2.05×, fair. Re-run by the analyst and checked by an independent re-run.
Confidence: low. Low. The study is old, stretched far outside its tested range and about to be replaced; the two funded gold peers are unlike Goldboro (at Denarius's multiple the expected value is 1.63×, at Montage's 2.48×); the loan is non-binding; late builds (4 in 10 misses, an estimate nobody measures) add 0.38×. At 2021 costs the expected value would be 2.28× (1.83× without late builds).
What one share should be worth in Nov 2030, by the analyst's estimate:
Works means Goldboro's financing closes in H1 2027, the mine is built within the updated study's budget plus contingency, and first gold is poured by about mid-2029.
Fails means Anything else by 13 Nov 2030: a late build (financed and built or building, but late or over budget; 4 in 10 of these outcomes, valued 1.5 years late) or a stalled project (no build; 6 in 10).
Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.5758 C$ per €); the rating itself is worked out in Canadian dollars, and future exchange rates will differ.
Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.
Latest close, Mon 16 Nov 2026: C$1.030 (€0.655), in the fair range. Same range as the rating.
The new shares and options each path needs are re-priced at each level.
At the rankings' own target: 1.76×. The rankings page's own range for the value if it works, about 1.43 – 3.5 times today's price (set on 6 Nov; it is re-derived when the updated Goldboro study is out), mid-point 2.46, gives an expected value of 1.76× with the same value if it fails: fair. Shown beside the rating, never counted.
At the top metal price on the rankings: If gold were US$7,000/oz, the top regular price on the rankings page (not a forecast): value if it works 6.36×, expected value 3.85× (2.94× without late builds), cheap by the numbers but still needing the written tests. Shown beside the rating, never counted.
The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).
Fair. At C$1.12 (close of Fri 13 Nov 2026) the expected value of a share in four years is 2.05 times today's price counting late builds and 1.68 times without them. A cheap label needs 2.0 times on both counts, plus a written reason, a dated catalyst and no tripped thesis breaker (a dated test, set in advance, that would show the case is wrong), so the share is fair. Goldboro's study value (the after-tax net present value, NPV, in its 2021 feasibility study) is taken at today's gold price with its costs brought up to today by a dated cost index: C$1,953.9M (C$2,254.8M at 2021 costs). If the financing closes in H1 2027 and first gold is poured by about mid-2029, a share is worth 3.20 times today's price, at what the market pays for funded gold mines being built (0.76 of study value on enterprise value, EV: shares plus debt minus cash), with the build money added and the loan deducted. The analyst's chance of that (a judgement): 40%. Otherwise a late build is worth 2.24× and a stalled project 0.66×. The study is being replaced by 31 Dec 2026, and the only loan is a non-binding letter: without it the expected value would be 1.61×.
Cheap below about C$0.85, if there is also a written reason the market is wrong, a dated catalyst and no tripped thesis breaker. The reason could come with the updated study (due by 31 Dec 2026) and a binding loan of at least US$150M. At today's price the numbers alone would need a chance of about 53% or more, or gold near US$4,680/oz.
It would turn expensive above about C$2.77 with nothing else changed (an expensive label also needs a written reason), or if gold fell below about US$2,270/oz. The thesis breakers (capex in the updated study above C$500M, no binding debt of at least US$150M by 30 Jun 2027, gold below US$3,000/oz before the financing closes) would force a re-rating, but on the numbers alone they leave it fair (1.78×, 1.61× and 1.54×).
Set in advance: any one of these would mean the plan has failed or the rating must be redone.
| When | What |
|---|---|
| 11 Dec 2026 | 4.21M warrants at C$0.95 expire |
| by 31 Dec 2026 | Updated Goldboro feasibility study and the board's construction decision |
| H1 2027 | Binding financing package (Appian credit of up to US$175M and equity) |
| 31 Oct 2027 | 69.4M warrants at C$1.92 expire |
| mid-2029 | First gold at Goldboro |
Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.
The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.
The same function at the rankings page's regular price columns: sensitivities, not forecasts. Goldboro's NPV on the study's gold line at each price (the royalty as a lower price); the multiple, the funding and the stalled value held; the late build moves with the study value. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
Swipe the table sideways for more columns →
| Price | Expected value | If it works | If it fails | Cheap below | Expensive above |
|---|---|---|---|---|---|
| gold US$3,500 | 1.83× · fair | 2.81× | 1.18× | C$0.736 | C$2.419 |
| gold US$4,500 | 2.41× · fair | 3.82× | 1.47× | C$1.064 | C$3.320 |
| gold US$5,500 | 2.99× · cheap | 4.84× | 1.75× | C$1.372 | C$4.222 |
| gold US$6,500 | 3.56× · cheap | 5.86× | 2.04× | C$2.028 | C$5.125 |
| gold US$7,000 | 3.85× · cheap | 6.36× | 2.18× | C$2.192 | C$5.577 |
NexGold Mining is worth about C$3.584 a share in Nov 2030 if the plan works and C$1.447 if it fails. At a 40% chance the expected value is C$2.302, 2.05× today's C$1.120: fair. Cheap also needs the cheap line without late builds: 1.68×.
Each step says first what its numbers are, then what the step does, then shows the sum.
Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.
A study is a plan, not a result; the study is old and being replaced by 31 Dec 2026.
On the enterprise-value basis the money that goes into the mine is added once and the debt taken off.
Raised by selling new shares at today's price less 20%.
All of the company's value divided by all the shares there will be (261.08 + 265.09 = 526.17M), then compared with today's price.
If Goldboro is not financed and built, the projects are valued like other unbuilt gold projects, capped at NexGold's own value per ounce.
A late build: C$107M more spending raised in shares, discounted 1.5 years.
Each kind of miss counts by its share.
Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.
The share prices at which, everything else as above, the rating would turn.
Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.
The analyst's lines below are for the earlier case (chance 50%, expected value 2.494×). The calculation in brief above uses the case of 16 Nov.
Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.
Goldboro at today's gold (A2, X1): C$2,346.4M less the Appian royalty C$91.6M = C$2,254.8M. A1 on EV: Denarius 0.535, Montage 0.984 (90%) → 0.759 × 2,254.8 = C$1,711.5M; + capex 369.9 + reserve 37.0 (money into the project or kept, once) − Appian loan 249.5 + Goliath 99.6 + warrant cash 145.5 = C$2,113.9M ÷ 526.17M shares (157.4M new at C$0.896; 77.8M higher-priced warrants and options exercised) = C$4.02. Late: same value, C$107M more spending raised as equity (645.59M shares) → C$3.27 ÷ 1.10668^1.5 = C$2.81. Stalled at the F1 cap C$204.0M, F2 raise (C$1.15M) → C$0.74. Cost reset (NPV C$1,953.9M): E 2.25×, 1.93× at q = 0.
| Metal column | E | Works | Fail | Cheap below | Expensive above |
|---|---|---|---|---|---|
| gold US$3,500 | 2.24× | 3.19× | 1.29× | C$1.32 | C$3.03 |
| gold US$4,500 | 2.89× | 4.21× | 1.58× | C$2.18 | C$4.03 |
| gold US$5,500 | 3.54× | 5.23× | 1.86× | C$2.73 | C$5.03 |
| gold US$6,500 | 4.19× | 6.24× | 2.14× | C$3.28 | C$6.04 |
| gold US$7,000 | 4.52× | 6.75× | 2.29× | C$3.55 | C$6.54 |
Method: Goldboro's NPV on the study's gold line at each price (X1; the royalty as a lower price); the multiple, the funding and the stalled value held; the late build moves with the study value. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
# NexGold Mining (TSXV: NEXG) - value rating v0.4.1 (16 Nov 2026). C$M; share values C$.
# Rule set v0.4.1: A1 - the works state (financed, built, first gold about mid-2029) at the EV / study-NPV median
# of gold 'funded / in construction' (Denarius 0.535, Montage 0.885), with the money that goes into the project
# or stays as cash added once and the loan deducted; F3 - q = 0.4, the late build valued the same way with the
# extra spending funded by equity and discounted at the hurdle rate (10.668%/yr) for 1.5 years; E at q = 0 is the
# cheap test. F1 - stalled projects at the cap (NexGold's own US$23.9/oz on 5.986 Moz), F2 raise.
DEFAULTS = dict(
P=1.12, # share price, C$ (start close 13 Nov 2026)
pw=0.50, q=0.4, delay=1.5,
ev_nav=[173.1 / 323.8, 4275.6 / (0.9 * 4830.2)], # Denarius, Montage: EV / NPV at today's metal (table C-3(a) v2)
npv=2254.8, # Goldboro after-tax NPV5 at today's gold, C$M (A2, X1; less Appian 2.9% royalty). Cost reset: 1953.9
capex=369.9, # C$M, C$271.0M (Dec 2021) escalated +36.48% (FRED PCU333131333131)
reserve=37.0, other_uses=92.3, # overrun reserve; G&A 19.6 + other projects 22.0 + Q4 spend 13.6 + interest 37.2 (estimates)
debt=249.5, # Appian US$175M, non-binding letter, counted as drawn in works and late
goliath=99.6, # Goliath at US$23.9/oz x 2.921 Moz
late_extra=107.0, # C$M extra spending that builds nothing in a late build (estimate)
stalled=204.0, # C$M stalled assets at the cap (US$23.9/oz x 5.986 Moz)
fail_spend=96.55, # C$M spending that builds nothing to 13 Nov 2030 (estimate)
years=4.0,
)
CASH = 87.4
SHARES = 261.084264
UNITS = 3.010009 + 0.901507 + 0.568440
SPROTT_CAD = 3.375 * 1.5758 / 1.1052 # US$3.375M of royalty payments settled in shares at the price
R = 1.5 ** 0.25
SERIES = [(4.209523, 0.95), (1.580301, 1.00), (6.913623, 1.40), (69.425, 1.92), (12.5, 1.05), (1.386382, 0.84),
(0.057501, 0.96), (0.059182, 4.64), (0.193481, 2.32), (1.166667, 1.00), (0.025, 0.77), (0.011941, 5.95),
(0.01244, 4.02), (0.100263, 2.50), (0.6, 1.51), (0.15, 1.68), (0.217072, 0.73), (0.0775, 1.44),
(0.155, 1.78), (0.15, 1.24)] # warrants then options: (M, strike C$)
def npv_at(au):
"""Goldboro 2021 FS after-tax NPV5, C$M, at US$ gold: C$ price = US$ x 1.4258 (X1); C$328M at C$2,000, last
slope C$0.57M per C$1; less Appian's 2.9% royalty as a 2.9% lower price."""
c = au * 1.5758 / 1.1052
return 328 + (c - 2000) * 0.57 - 0.029 * c * 0.57
def _m(i):
s = sorted(i['ev_nav']); n = len(s)
return i.get('m', s[n // 2] if n % 2 else (s[n // 2 - 1] + s[n // 2]) / 2)
def _npv(i):
# desk, 16 Nov: a lower study value (the cost reset) is carried to other gold prices as the same C$ amount
return i['npv'] if 'au' not in i else npv_at(i['au']) - (2254.8 - i['npv'])
def _built(i, P, extra):
itm = [(n, k) for n, k in SERIES if k < P]
rest = sorted([(n, k) for n, k in SERIES if k >= P], key=lambda x: x[1])
cashP = sum(n * k for n, k in itm)
gap = i['capex'] + i['reserve'] + i['other_uses'] - CASH - i['debt'] - cashP + extra
raise_sh = max(gap, 0.0) / (0.8 * P); surplus = max(-gap, 0.0)
sh = SHARES + UNITS + SPROTT_CAD / P + sum(n for n, _ in itm) + raise_sh
V = _m(i) * _npv(i) + i['capex'] + i['reserve'] - i['debt'] + i['goliath'] + surplus
for n, k in rest: # higher-priced series exercised when struck below the value per share
if k < V / sh:
V += n * k; sh += n
return V / sh, sh, gap
def _stalled(i, P):
ex = [(n, k) for n, k in SERIES[:1] if k < P] # only the C$0.95 series expiring 11 Dec 2026
n0 = SHARES + UNITS + SPROTT_CAD / P + sum(n for n, _ in ex)
funds = CASH + sum(n * k for n, k in ex) + 4.0 - i['fail_spend']
s = max(-funds, 0.0); A = i['stalled'] + max(funds, 0.0)
if A - s <= 0: return 0.0, n0
p = 0.8 * (A - s) / n0
return A / (n0 + s / p), n0 + s / p
def _branches(i, P):
Mw_ps, sh_w, gap = _built(i, P, 0.0)
Ml0, sh_l, _ = _built(i, P, i['late_extra'])
Ml_ps = Ml0 / R ** i['delay']
Ms_ps, sh_f = _stalled(i, P)
Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
return dict(m=_m(i), gap=gap, shares_works=sh_w, shares_late=sh_l, shares_fail=sh_f, Mw_ps=Mw_ps,
M_late_ps=Ml_ps, M_stalled_ps=Ms_ps, Mf_ps=Mf_ps)
def value(inp=None):
i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_late=b['M_late_ps'] / P, M_stalled=b['M_stalled_ps'] / P,
E=E, E_q0=Eq0, per_year=E ** (1 / i['years']) - 1)
def _E(i, P):
b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b
def _cross(i, line, hi, lo=0.02, steps=4000):
import math
prev = hi
for k in range(steps + 1):
P = hi * math.exp(math.log(lo / hi) * k / steps)
if _E(i, P)[0] >= line:
a, b = P, prev
for _ in range(60):
mid = (a + b) / 2
a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
return a
prev = P
return None
def levels(inp=None):
i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
cheap_arith=cheap, fail_ps_at_cheap=fps)
if __name__ == '__main__':
r = value(); l = levels()
print({k: round(v, 4) for k, v in r.items()}); print(l)
# desk, 16 Nov: the counted case
DEFAULTS.update({'npv': 1953.9, 'pw': 0.4})Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.
Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.
How we rate a share, with two worked examples →
Human judgement (Chung Huynh) on what matters. Machine effort on everything else.
Chung Huynh is an independent equity researcher, not a licensed financial adviser.
The author may own shares in companies rated here and may buy or sell them at any time.
A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.
Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.
Educational research, not personal financial advice.