NexGold Mining

TSXV: NEXG · Gold & silver developers

A gold developer in Canada (Goldboro, Nova Scotia, plus the paused Goliath project in Ontario): fully permitted, early works under way, updated study due by end-2026.

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Value rating · 16 Nov 2026 · start close 13 Nov 2026
CheapFairExpensive

Fair: past the cheap line only if late builds count · low confidence

Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 40% (before, 50%, the figure the rankings page used); Goldboro's study value has its costs brought up to today (C$1,953.9M instead of C$2,254.8M at 2021 costs). Before: 2.49×, which the analyst had kept fair on judgement. Now: 2.05×, fair. Re-run by the analyst and checked by an independent re-run.

Confidence: low. Low. The study is old, stretched far outside its tested range and about to be replaced; the two funded gold peers are unlike Goldboro (at Denarius's multiple the expected value is 1.63×, at Montage's 2.48×); the loan is non-binding; late builds (4 in 10 misses, an estimate nobody measures) add 0.38×. At 2021 costs the expected value would be 2.28× (1.83× without late builds).

You pay todayC$1.120 · €0.711 a share
Close of Fri 13 Nov 2026 on the TSX Venture Exchange, from the desk's nightly price record, checked against a dated price history on 15 Nov 2026; a later re-check could not open the page.

What one share should be worth in Nov 2030, by the analyst's estimate:

40% chance it works
C$3.584€2.274if it works · 3.20×
C$1.447€0.918if it fails · 1.29×

Works means Goldboro's financing closes in H1 2027, the mine is built within the updated study's budget plus contingency, and first gold is poured by about mid-2029.

Fails means Anything else by 13 Nov 2030: a late build (financed and built or building, but late or over budget; 4 in 10 of these outcomes, valued 1.5 years late) or a stalled project (no build; 6 in 10).

Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.5758 C$ per €); the rating itself is worked out in Canadian dollars, and future exchange rates will differ.

Expected value in Nov 2030
C$2.302€1.461
You pay today
C$1.120€0.711
2.05× today's price+19.7% a year over 4 years
40% × 3.200× + 60% × 1.292× = 2.055×
chance it works × value if it works + chance it fails × value if it fails

Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.

Price levels · everything else fixed
Cheap belowC$0.845 €0.536
Last close (Fri 13 Nov)C$1.120 €0.711
Expensive aboveC$2.767 €1.756

Latest close, Mon 16 Nov 2026: C$1.030 (€0.655), in the fair range. Same range as the rating.

The new shares and options each path needs are re-priced at each level.

Beside the rating · not counted in it

At the rankings' own target: 1.76×. The rankings page's own range for the value if it works, about 1.43 – 3.5 times today's price (set on 6 Nov; it is re-derived when the updated Goldboro study is out), mid-point 2.46, gives an expected value of 1.76× with the same value if it fails: fair. Shown beside the rating, never counted.

At the top metal price on the rankings: If gold were US$7,000/oz, the top regular price on the rankings page (not a forecast): value if it works 6.36×, expected value 3.85× (2.94× without late builds), cheap by the numbers but still needing the written tests. Shown beside the rating, never counted.

The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).

Why

Fair. At C$1.12 (close of Fri 13 Nov 2026) the expected value of a share in four years is 2.05 times today's price counting late builds and 1.68 times without them. A cheap label needs 2.0 times on both counts, plus a written reason, a dated catalyst and no tripped thesis breaker (a dated test, set in advance, that would show the case is wrong), so the share is fair. Goldboro's study value (the after-tax net present value, NPV, in its 2021 feasibility study) is taken at today's gold price with its costs brought up to today by a dated cost index: C$1,953.9M (C$2,254.8M at 2021 costs). If the financing closes in H1 2027 and first gold is poured by about mid-2029, a share is worth 3.20 times today's price, at what the market pays for funded gold mines being built (0.76 of study value on enterprise value, EV: shares plus debt minus cash), with the build money added and the loan deducted. The analyst's chance of that (a judgement): 40%. Otherwise a late build is worth 2.24× and a stalled project 0.66×. The study is being replaced by 31 Dec 2026, and the only loan is a non-binding letter: without it the expected value would be 1.61×.

What would change the rating

Cheap below about C$0.85, if there is also a written reason the market is wrong, a dated catalyst and no tripped thesis breaker. The reason could come with the updated study (due by 31 Dec 2026) and a binding loan of at least US$150M. At today's price the numbers alone would need a chance of about 53% or more, or gold near US$4,680/oz.

It would turn expensive above about C$2.77 with nothing else changed (an expensive label also needs a written reason), or if gold fell below about US$2,270/oz. The thesis breakers (capex in the updated study above C$500M, no binding debt of at least US$150M by 30 Jun 2027, gold below US$3,000/oz before the financing closes) would force a re-rating, but on the numbers alone they leave it fair (1.78×, 1.61× and 1.54×).

Thesis breakers

Set in advance: any one of these would mean the plan has failed or the rating must be redone.

Dated events to watch

WhenWhat
11 Dec 20264.21M warrants at C$0.95 expire
by 31 Dec 2026Updated Goldboro feasibility study and the board's construction decision
H1 2027Binding financing package (Appian credit of up to US$175M and equity)
31 Oct 202769.4M warrants at C$1.92 expire
mid-2029First gold at Goldboro
Try your own assumptions · private test

Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.

CheapFairExpensive
Worth in Nov 2030
You pay today
Chance it works
If it works
If it fails
Today's price against the two price levels
Cheap below
Today
Expensive above
Main assumptions
More judgement calls ()

The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.

At other metal prices

The same function at the rankings page's regular price columns: sensitivities, not forecasts. Goldboro's NPV on the study's gold line at each price (the royalty as a lower price); the multiple, the funding and the stalled value held; the late build moves with the study value. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

Swipe the table sideways for more columns →

PriceExpected valueIf it worksIf it failsCheap belowExpensive above
gold US$3,5001.83× · fair2.81×1.18×C$0.736C$2.419
gold US$4,5002.41× · fair3.82×1.47×C$1.064C$3.320
gold US$5,5002.99× · cheap4.84×1.75×C$1.372C$4.222
gold US$6,5003.56× · cheap5.86×2.04×C$2.028C$5.125
gold US$7,0003.85× · cheap6.36×2.18×C$2.192C$5.577

How we got this

Show the full calculationThe key steps first; every step and input one tap further

NexGold Mining is worth about C$3.584 a share in Nov 2030 if the plan works and C$1.447 if it fails. At a 40% chance the expected value is C$2.302, 2.05× today's C$1.120: fair. Cheap also needs the cheap line without late builds: 1.68×.

The calculation in brief

Each step says first what its numbers are, then what the step does, then shows the sum.

Today

1What the market pays today
The numbers
261.084M
shares in issue (TSXV)
C$1.120
closing share price, 13 Nov 2026
What this step does

Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.

Calculation
261.084M × C$1.120 = C$292.4M

If it works

2Goldboro's study value at today's gold
The numbers
C$1,953.9M
the 2021 study's after-tax NPV re-priced to today's gold, less the royalty, with its costs brought up to today by a dated cost index (C$2,254.8M at 2021 costs)
0.7591
funded gold builders per dollar of study value (Denarius, Montage)
What this step does

A study is a plan, not a result; the study is old and being replaced by 31 Dec 2026.

Calculation
0.7591 × C$1,953.9M = C$1,483.1M
3Value of the whole company if built
The numbers
C$1,483.1M
Goldboro
C$369.9M + C$37M
build cost and reserve, added once
C$249.5M
the Appian loan, deducted (non-binding)
C$99.6M
Goliath
warrant and option money
What this step does

On the enterprise-value basis the money that goes into the mine is added once and the debt taken off.

Calculation
Goldboro + build money − loan + Goliath + warrant money = C$1,885.5M
4The money still to raise
The numbers
C$141.0M
build, reserve and other spending less cash, the loan and in-the-money warrants
C$0.896
price of new shares
What this step does

Raised by selling new shares at today's price less 20%.

Calculation
C$141.0M ÷ C$0.896 = 157.4M new shares
5Adding up: one share if it works
The numbers
C$1,885.5M
the company's value if it works (the parts above)
261.08M
shares in issue today
265.09M
new shares sold to fund the plan, plus options, warrants and share units that turn into shares
526.17M
all the shares there would be
What this step does

All of the company's value divided by all the shares there will be (261.08 + 265.09 = 526.17M), then compared with today's price.

Calculation
C$1,885.5M ÷ 526.17M = C$3.58; C$3.58 ÷ C$1.120 = 3.200× today's price

If it fails

6If it stalls
The numbers
C$204M
Goldboro and Goliath as unbuilt projects at the cap (US$23.9 an ounce), after a rescue share sale
What this step does

If Goldboro is not financed and built, the projects are valued like other unbuilt gold projects, capped at NexGold's own value per ounce.

Calculation
C$204M, then per share (after a rescue share sale where cash runs short) = C$0.739 a share = 0.660×
7If it comes late
The numbers
1.5 years
how late
10.7% a year
the desk's required return, used to discount the late value
What this step does

A late build: C$107M more spending raised in shares, discounted 1.5 years.

Calculation
works case, with its own extra funding, discounted for the delay = C$2.51 a share = 2.240×
8Value if it fails: late builds and stalls together
The numbers
40%
of the misses are late builds (an estimate nobody measures yet)
60%
are stalls
What this step does

Each kind of miss counts by its share.

Calculation
0.40 × C$2.51 + 0.60 × C$0.739 = C$1.447 = 1.292× today's price

The result

9Weighing the two futures
The numbers
40%
the desk's chance that the plan works
3.200×
if it works
1.292×
if it fails
What this step does

Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.

Calculation
0.40 × 3.200 + 0.60 × 1.292 = 2.055× = C$2.30
10The two price levels
The numbers
1.10× and 2.00×
the expensive and cheap lines
re-priced
the new shares and the options at each price
What this step does

The share prices at which, everything else as above, the rating would turn.

Calculation
solved by the function at each price = expensive above C$2.77 · cheap below C$0.845

Judgement calls to challenge

Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.

Chance the plan works
We used: Desk 40% → 2.05× · fair
Alternatives, one at a time:
  • Before 16 Nov 50%2.25× · fair
  • 30% (10 points lower)1.86× · fair
  • 50% (10 points higher)2.25× · fair
About this input
The analyst's estimate, from the deep dive, that the company reaches the “works” state above by its date. No measured base rates exist yet for these stages, so this is a judgement call.
Gold price, held flat
We used: Desk US$3,886 (COMEX, 13 Nov) → 2.05× · fair
Alternatives, one at a time:
  • US$3,5001.83× · fair
  • US$4,5002.41× · fair
  • US$5,5002.99× · cheap
  • US$6,5003.56× · cheap
  • US$7,0003.85× · cheap
About this input
The chips are the gold rankings' price columns, not forecasts.
Goldboro if built, × its study value
We used: Desk 0.759 (median) → 2.05× · fair
Alternatives, one at a time:
  • Denarius 0.5351.63× · fair
  • Montage 0.9842.48× · fair
About this input
Gold projects that are funded and being built, per dollar of study value (enterprise value ÷ NPV): two names, unlike Goldboro, so weak.
Goldboro study value at today's gold
We used: Desk C$1,953.9M (costs brought to today) → 2.05× · fair
Alternatives, one at a time:
  • At 2021 costs C$2,254.8M2.28× · fair
About this input
The 2021 study re-priced to today's gold, less the royalty, with its costs brought up to today by a dated cost index. The study is being replaced by 31 Dec 2026. Until 16 Nov the rating used the 2021 costs.
Misses that are a late build
We used: Desk 40% → 2.05× · fair
Alternatives, one at a time:
  • None (the cheap test)1.68× · fair
About this input
Of the outcomes that miss the works state, the share that is a build that comes late rather than a stall. Nobody measures this yet; the cheap test uses none. A late build can be worth less than a stall: it still needs the build money, raised by selling new shares, and it counts later, while a stalled project spends nothing more.
Loan for the build
We used: Desk C$249.5M (non-binding) → 2.05× · fair
Alternatives, one at a time:
  • No loan1.61× · fair
About this input
The Appian loan is not binding yet.
Build cost
We used: Desk C$369.9M → 2.05× · fair
Alternatives, one at a time:
  • C$500M (breaker line)1.78× · fair
About this input
The 2021 figure escalated by a dated cost index.

Every step

The analyst's arithmetic, line by lineAs written in the rating, with the metal-price table

The analyst's lines below are for the earlier case (chance 50%, expected value 2.494×). The calculation in brief above uses the case of 16 Nov.

Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.

Goldboro at today's gold (A2, X1): C$2,346.4M less the Appian royalty C$91.6M = C$2,254.8M. A1 on EV: Denarius 0.535, Montage 0.984 (90%) → 0.759 × 2,254.8 = C$1,711.5M; + capex 369.9 + reserve 37.0 (money into the project or kept, once) − Appian loan 249.5 + Goliath 99.6 + warrant cash 145.5 = C$2,113.9M ÷ 526.17M shares (157.4M new at C$0.896; 77.8M higher-priced warrants and options exercised) = C$4.02. Late: same value, C$107M more spending raised as equity (645.59M shares) → C$3.27 ÷ 1.10668^1.5 = C$2.81. Stalled at the F1 cap C$204.0M, F2 raise (C$1.15M) → C$0.74. Cost reset (NPV C$1,953.9M): E 2.25×, 1.93× at q = 0.

  • Start: C$1.12 (€0.71), close of Fri 13 Nov 2026 (source as v0.4). Shares by branch: works 526.169M, late 645.589M, fail 276.014M.
  • If it works: C$4.02 a share = 3.587×.
  • If it fails: late build C$2.81 (2.511×), stalled C$0.74 (0.660×); q = 0.4: Mf = C$1.57 = 1.400×.
  • E = 0.50 × 3.5871 + 0.50 × 1.4004 = 2.4938 (+25.7% a year over 4.00 years; lines: cheap 2.000, hurdle 1.500, expensive 1.1000). E at q = 0: 2.1235.
  • Chance the price implies for the hurdle: 5%; cheap from a chance of 27%; expensive at no chance (the fail value alone is above the line).
  • Price levels (everything else fixed, new shares re-priced at each price): expensive above C$3.42 (€2.17); the arithmetic's cheap level is C$1.55, against a stalled value of C$0.74 a share at that price: cheap below C$1.55 (€0.98).
  • Yardstick B (stored, not counted): works 3.89× (the row's own target, as v0.4) → E 2.645× with the counted fail value.
  • Low case (m = 0.5346): Mw 2.73×, Mf 1.16×, E 1.94×.
  • High case (m = 0.8713): Mw 4.02×, Mf 1.52×, E 2.77×.
  • Metal −10% / +10%: E 2.24× / 2.75×. Bull (shown, never counted): if gold US$7,000, works 6.75×, E 4.52×.
Metal column E Works Fail Cheap below Expensive above
gold US$3,500 2.24× 3.19× 1.29× C$1.32 C$3.03
gold US$4,500 2.89× 4.21× 1.58× C$2.18 C$4.03
gold US$5,500 3.54× 5.23× 1.86× C$2.73 C$5.03
gold US$6,500 4.19× 6.24× 2.14× C$3.28 C$6.04
gold US$7,000 4.52× 6.75× 2.29× C$3.55 C$6.54

Method: Goldboro's NPV on the study's gold line at each price (X1; the royalty as a lower price); the multiple, the funding and the stalled value held; the late build moves with the study value. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

The rating function itself (Python)The exact code behind the card, the sliders and this calculation
# NexGold Mining (TSXV: NEXG) - value rating v0.4.1 (16 Nov 2026). C$M; share values C$.
# Rule set v0.4.1: A1 - the works state (financed, built, first gold about mid-2029) at the EV / study-NPV median
# of gold 'funded / in construction' (Denarius 0.535, Montage 0.885), with the money that goes into the project
# or stays as cash added once and the loan deducted; F3 - q = 0.4, the late build valued the same way with the
# extra spending funded by equity and discounted at the hurdle rate (10.668%/yr) for 1.5 years; E at q = 0 is the
# cheap test. F1 - stalled projects at the cap (NexGold's own US$23.9/oz on 5.986 Moz), F2 raise.
DEFAULTS = dict(
    P=1.12,            # share price, C$ (start close 13 Nov 2026)
    pw=0.50, q=0.4, delay=1.5,
    ev_nav=[173.1 / 323.8, 4275.6 / (0.9 * 4830.2)],   # Denarius, Montage: EV / NPV at today's metal (table C-3(a) v2)
    npv=2254.8,        # Goldboro after-tax NPV5 at today's gold, C$M (A2, X1; less Appian 2.9% royalty). Cost reset: 1953.9
    capex=369.9,       # C$M, C$271.0M (Dec 2021) escalated +36.48% (FRED PCU333131333131)
    reserve=37.0, other_uses=92.3,   # overrun reserve; G&A 19.6 + other projects 22.0 + Q4 spend 13.6 + interest 37.2 (estimates)
    debt=249.5,        # Appian US$175M, non-binding letter, counted as drawn in works and late
    goliath=99.6,      # Goliath at US$23.9/oz x 2.921 Moz
    late_extra=107.0,  # C$M extra spending that builds nothing in a late build (estimate)
    stalled=204.0,     # C$M stalled assets at the cap (US$23.9/oz x 5.986 Moz)
    fail_spend=96.55,  # C$M spending that builds nothing to 13 Nov 2030 (estimate)
    years=4.0,
)
CASH = 87.4
SHARES = 261.084264
UNITS = 3.010009 + 0.901507 + 0.568440
SPROTT_CAD = 3.375 * 1.5758 / 1.1052          # US$3.375M of royalty payments settled in shares at the price
R = 1.5 ** 0.25
SERIES = [(4.209523, 0.95), (1.580301, 1.00), (6.913623, 1.40), (69.425, 1.92), (12.5, 1.05), (1.386382, 0.84),
          (0.057501, 0.96), (0.059182, 4.64), (0.193481, 2.32), (1.166667, 1.00), (0.025, 0.77), (0.011941, 5.95),
          (0.01244, 4.02), (0.100263, 2.50), (0.6, 1.51), (0.15, 1.68), (0.217072, 0.73), (0.0775, 1.44),
          (0.155, 1.78), (0.15, 1.24)]       # warrants then options: (M, strike C$)

def npv_at(au):
    """Goldboro 2021 FS after-tax NPV5, C$M, at US$ gold: C$ price = US$ x 1.4258 (X1); C$328M at C$2,000, last
    slope C$0.57M per C$1; less Appian's 2.9% royalty as a 2.9% lower price."""
    c = au * 1.5758 / 1.1052
    return 328 + (c - 2000) * 0.57 - 0.029 * c * 0.57

def _m(i):
    s = sorted(i['ev_nav']); n = len(s)
    return i.get('m', s[n // 2] if n % 2 else (s[n // 2 - 1] + s[n // 2]) / 2)

def _npv(i):
    # desk, 16 Nov: a lower study value (the cost reset) is carried to other gold prices as the same C$ amount
    return i['npv'] if 'au' not in i else npv_at(i['au']) - (2254.8 - i['npv'])

def _built(i, P, extra):
    itm = [(n, k) for n, k in SERIES if k < P]
    rest = sorted([(n, k) for n, k in SERIES if k >= P], key=lambda x: x[1])
    cashP = sum(n * k for n, k in itm)
    gap = i['capex'] + i['reserve'] + i['other_uses'] - CASH - i['debt'] - cashP + extra
    raise_sh = max(gap, 0.0) / (0.8 * P); surplus = max(-gap, 0.0)
    sh = SHARES + UNITS + SPROTT_CAD / P + sum(n for n, _ in itm) + raise_sh
    V = _m(i) * _npv(i) + i['capex'] + i['reserve'] - i['debt'] + i['goliath'] + surplus
    for n, k in rest:                      # higher-priced series exercised when struck below the value per share
        if k < V / sh:
            V += n * k; sh += n
    return V / sh, sh, gap

def _stalled(i, P):
    ex = [(n, k) for n, k in SERIES[:1] if k < P]          # only the C$0.95 series expiring 11 Dec 2026
    n0 = SHARES + UNITS + SPROTT_CAD / P + sum(n for n, _ in ex)
    funds = CASH + sum(n * k for n, k in ex) + 4.0 - i['fail_spend']
    s = max(-funds, 0.0); A = i['stalled'] + max(funds, 0.0)
    if A - s <= 0: return 0.0, n0
    p = 0.8 * (A - s) / n0
    return A / (n0 + s / p), n0 + s / p

def _branches(i, P):
    Mw_ps, sh_w, gap = _built(i, P, 0.0)
    Ml0, sh_l, _ = _built(i, P, i['late_extra'])
    Ml_ps = Ml0 / R ** i['delay']
    Ms_ps, sh_f = _stalled(i, P)
    Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
    return dict(m=_m(i), gap=gap, shares_works=sh_w, shares_late=sh_l, shares_fail=sh_f, Mw_ps=Mw_ps,
                M_late_ps=Ml_ps, M_stalled_ps=Ms_ps, Mf_ps=Mf_ps)

def value(inp=None):
    i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
    E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
    Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
    return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_late=b['M_late_ps'] / P, M_stalled=b['M_stalled_ps'] / P,
                E=E, E_q0=Eq0, per_year=E ** (1 / i['years']) - 1)

def _E(i, P):
    b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b

def _cross(i, line, hi, lo=0.02, steps=4000):
    import math
    prev = hi
    for k in range(steps + 1):
        P = hi * math.exp(math.log(lo / hi) * k / steps)
        if _E(i, P)[0] >= line:
            a, b = P, prev
            for _ in range(60):
                mid = (a + b) / 2
                a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
            return a
        prev = P
    return None

def levels(inp=None):
    i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
    exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
    fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
    return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
                cheap_arith=cheap, fail_ps_at_cheap=fps)

if __name__ == '__main__':
    r = value(); l = levels()
    print({k: round(v, 4) for k, v in r.items()}); print(l)

# desk, 16 Nov: the counted case
DEFAULTS.update({'npv': 1953.9, 'pw': 0.4})
The inputs (15)Each marked fact, estimate or desk choice, with its source

Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.

The function's inputs

Share price at the start closeFact
1.12
share price, C$ (start close 13 Nov 2026)
Chance the plan worksDesk choice
0.4
see the analyst's arithmetic
Misses that are a late buildDesk choice
0.4
see the analyst's arithmetic
How late a late build is, yearsDesk choice
1.5
see the analyst's arithmetic
ev navDesk choice
0.5346, 0.9835
Denarius, Montage: EV / NPV at today's metal (table C-3(a) v2)
Goldboro study value at today's goldDesk choice
1,953.9
Goldboro after-tax NPV5 at today's gold, C$M (less Appian 2.9% royalty). Cost reset: 1953.9
Build costDesk choice
369.9
C$M, C$271.0M (Dec 2021) escalated +36.48% (FRED PCU333131333131)
reserveEstimate
37
overrun reserve; G&A 19.6 + other projects 22.0 + Q4 spend 13.6 + interest 37.2 (estimates)
other usesEstimate
92.3
overrun reserve; G&A 19.6 + other projects 22.0 + Q4 spend 13.6 + interest 37.2 (estimates)
Loan for the buildDesk choice
249.5
Appian US$175M, non-binding letter, counted as drawn in works and late
goliathDesk choice
99.6
Goliath at US$23.9/oz x 2.921 Moz
late extraEstimate
107
C$M extra spending that builds nothing in a late build (estimate)
Value if it stallsDesk choice
204
C$M stalled assets at the cap (US$23.9/oz x 5.986 Moz)
fail spendEstimate
96.55
C$M spending that builds nothing to 13 Nov 2030 (estimate)
Years to the end of the horizonDesk choice
4
see the analyst's arithmetic

Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.

Sources

How we rate a share, with two worked examples →

Back to all value ratings (14 companies)

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Chung Huynh is an independent equity researcher, not a licensed financial adviser.

The author may own shares in companies rated here and may buy or sell them at any time.

A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.

Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.

Educational research, not personal financial advice.