TSX / NYSE: NXE · Critical minerals
A uranium developer in Canada (the Rook I project): licensed and under construction since August 2026, with first ore targeted for Q3 2030.
Expensive · medium confidence in the label, low in the numbers (one uranium peer)
Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 40% (before, 45%, the figure the rankings page used). Before: 0.73×, expensive. Now: 0.71×, expensive. Re-run by the analyst and checked by an independent re-run.
Confidence: medium. Medium in the label, low in the numbers. The label holds on every reading of the peer multiple and the fail value tried: 0.62× to 0.75× across the low and high readings, and about 0.77× with the uranium inventory and IsoEnergy stake added in every branch. Only a much higher uranium price changes it (fair near US$143/lb). The numbers are weak: one peer, read two ways; a three-name group of unlike companies for the stalled value; option strikes not available.
What one share should be worth in Sep 2030, by the analyst's estimate:
Works means First ore from Rook I by 30 Sep 2030, inside the C$2.2B budget plus contingency, with at most 10% new shares.
Fails means First ore is late or over budget with a large share issue (half of the cases, valued 1.5 years late) or building stops (the other half).
Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.5758 C$ per €); the rating itself is worked out in Canadian dollars, and future exchange rates will differ.
Expensive at 1.10× or less, cheap at 1.96× or more (lines scaled to the 3.88-year horizon). Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.
Latest close, Mon 16 Nov 2026: C$10.61 (€6.74), in the expensive range. Same range as the rating.
The new shares and options each path needs are re-priced at each level.
No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).
A share counts as cheap here if, on average, it should be worth at least 1.96 times its price by Sep 2030. Worked out on paper, that would happen at C$2.89 a share. But at that price a share would still be worth C$3.85 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.
At the rankings' own target: 0.69×. The rankings page's target of 1.0 – 1.2 times the project's study value for a licensed project in construction (mid-point 1.1) gives 0.91 times today's price if it works and an expected value of 0.69× with the same value if it fails: the same result, expensive. Shown beside the rating, never counted.
At the top metal price on the rankings: If uranium were US$150/lb, the top regular price on the rankings page (not a forecast): value if it works 1.65×, expected value 1.15×, fair by the numbers. Shown beside the rating, never counted.
The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).
Expensive. At C$11.05 (close of Fri 13 Nov 2026) the expected value of a share at first ore (30 Sep 2030) is 0.71 times today's price, under the 1.097× line for expensive over that 3.9-year horizon. The expected value weighs a share's value if the plan works and if it fails by their chances. The price is already 1.16 times the value in the 2024 study (its after-tax net present value, NPV, at today's uranium), before a C$2.3B funding gap with nothing signed. Valued at what the market pays Denison, the one uranium company building a mine (1.15 times its study value on enterprise value, EV: shares plus debt minus cash), with the capex still to spend added and new debt deducted, an on-time build is worth 0.95 times today's price, a late one 0.75× and a stalled one 0.35×. The analyst's chance of an on-time build (a judgement): 40%.
Price alone won't make this cheap. What could raise the value: the first concrete pour at the production shaft (16 Dec 2026), ground freezing (Jan to Mar 2027), shaft excavation (from Q3 2027) and, above all, the financing package and any capex re-estimate (by 30 Sep 2027; cash lasts to the end of Q3 2027). On the numbers it would turn fair with long-term uranium near US$143/lb, or if the market paid near 1.97 times study value for a mine at first ore.
Already expensive. It would turn fair only below about C$6.67 with nothing else changed. It gets worse with a capex re-estimate above C$2.2B, a funding package with a large share issue, or uranium falling back towards US$80/lb (expected value 0.59×).
Set in advance: any one of these would mean the plan has failed or the rating must be redone.
| When | What |
|---|---|
| early Dec 2026 | PCE drilling season ends |
| 16 Dec 2026 | First concrete pour at the production shaft |
| Mar 2027 | Temporary ground freezing starts |
| about 3 Mar 2027 | FY2026 results |
| start of Q3 2027 | Shaft excavation starts; first PCE resource targeted |
| by 30 Sep 2027 | Financing package and any capex re-estimate (cash funded to the end of Q3 2027) |
| 29 May 2029 | US$250M debentures mature |
| Q3 2030 | First ore |
Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.
The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.
The same function at the rankings page's regular price columns: sensitivities, not forecasts. Each US$ price put into study terms (×1.02658, the exchange-rate conversion) and read off the study's points (US$50, 80, 95, 100, 150); the multiple and the stalled value held; the late build moves; the debentures convert above C$15.30. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
Swipe the table sideways for more columns →
| Price | Expected value | If it works | If it fails | Cheap below | Expensive above |
|---|---|---|---|---|---|
| uranium US$50/lb | 0.35× · expensive | 0.38× | 0.33× | none | C$2.81 |
| uranium US$80/lb | 0.59× · expensive | 0.76× | 0.47× | none | C$5.36 |
| uranium US$91.55/lb | 0.68× · expensive | 0.91× | 0.53× | none | C$6.38 |
| uranium US$98/lb | 0.73× · expensive | 0.99× | 0.56× | none | C$6.96 |
| uranium US$100/lb | 0.75× · expensive | 1.02× | 0.57× | none | C$7.14 |
| uranium US$150/lb | 1.15× · fair | 1.65× | 0.82× | C$4.55 | C$11.70 |
NexGen Energy is worth about C$10.49 a share in Sep 2030 if the plan works and C$6.05 if it fails. At a 40% chance the expected value is C$7.83, 0.71× today's C$11.05: expensive.
Each step says first what its numbers are, then what the step does, then shows the sum.
Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.
The market pays less than the full study value; one peer only, so weak.
The money that goes into the mine is added once and the debt taken off.
What debt and cash do not cover is raised in new shares.
All of the company's value divided by all the shares there will be (688.03 + 94.25 = 782.29M), then compared with today's price.
If Rook I is not funded and built by 30 Sep 2030 it is valued like other unbuilt uranium projects.
A late build: half of a C$2.9B gap raised as shares, discounted 1.5 years.
Each kind of miss counts by its share.
Each future counts by its chance. Over 3.88 years, 1.10× or less is expensive and 1.96× or more is cheap; between is fair. Expensive and cheap also need the written tests.
The share prices at which, everything else as above, the rating would turn.
Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.
The analyst's lines below are for the earlier case (chance 45%, expected value 0.728×). The calculation in brief above uses the case of 16 Nov.
Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.
Rook I NPV at US$94.775 (X1): C$6,535.6M. A1 on EV: Denison EV US$1,958M = C$2,791.7M ÷ Phoenix (C$2,087.1M) = 1.338, ÷ Phoenix + Gryphon (C$2,908.1M) = 0.960 → midpoint 1.149 × 6,535.6 = C$7,508.1M; + capex still to spend C$2,234.2M − new debt C$1,679.0M + option money C$143.4M = C$8,206.7M ÷ 782.29M shares = C$10.49. Late: the C$2,907M gap half as equity (C$1,453.5M at C$8.84, 877.91M shares) and half as debt → (7,508.1 + 2,234.2 − 1,453.5 + 143.4) ÷ 877.91M = C$9.61 ÷ 1.10668^1.5 = C$8.25. Stalled C$3.85 (uranium EV per lb median, F2).
| Metal column | E | Works | Fail | Cheap below | Expensive above |
|---|---|---|---|---|---|
| uranium US$50/lb | 0.35× | 0.38× | 0.33× | no cheap level | C$2.82 |
| uranium US$80/lb | 0.60× | 0.76× | 0.47× | no cheap level | C$5.53 |
| uranium US$91.55/lb | 0.70× | 0.91× | 0.53× | no cheap level | C$6.60 |
| uranium US$98/lb | 0.76× | 0.99× | 0.56× | no cheap level | C$7.21 |
| uranium US$100/lb | 0.77× | 1.02× | 0.57× | no cheap level | C$7.40 |
| uranium US$150/lb | 1.20× | 1.65× | 0.82× | C$6.24 | C$12.17 |
Method: Each US$ price put into study terms (×1.02658, X1) and read off the study's points (US$50, 80, 95, 100, 150); the multiple and the stalled value held; the late build moves; the debentures convert above C$15.30. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
# NexGen Energy (TSX: NXE) - value rating v0.4.1 (16 Nov 2026). C$M; share values C$.
# Horizon to the works date 30 Sep 2030 (3.88 years; cheap 1.959x, expensive 1.097x).
# Rule set v0.4.1: A1 on EV / study NPV (own raise and debt credited separately): one uranium peer, Denison
# (EV US$1,958M at 13 Nov 2026), read two ways (Phoenix alone; Phoenix + Gryphon at its own deck), midpoint;
# all capex still to spend (2,234.2, whoever pays it) added once, new debt deducted; debentures convert above C$15.30. F3: q = 0.5, late = the late funding case
# discounted 1.5 years at 10.668%. F1: stalled at C$3.85 a share (uranium EV per lb median, F2 raise).
FX = 1.5758 / 1.1052
DEFAULTS = dict(
P=11.05, pw=0.45, q=0.5, delay=1.5,
npv=6535.6, # Rook I after-tax NPV8 at US$94.775/lb (spot/long-term average), X1 at the ECB rate
ev_nav=[1958.0 * FX / 2087.1, 1958.0 * FX / 2908.1], # Denison EV / Phoenix 95%; / (Phoenix + Gryphon) 95%
into_project=2234.2, # remaining indexed capex, whoever pays it (own cash 303.5 + new money 1,930.7)
debt_works=1679.0, equity_works=608.2,
equity_late=1453.5, # late: half of a C$2,907M gap as equity, the rest as debt
stalled_ps=3.85, # C$ per share (A = 3,156.2, s = 417.8, n = 688.89M; F2)
years=1417 / 365.25,
)
SHARES = 688.034761
OPT_N, OPT_K = 22.9926, 6.24 # half of 45,985,100 options counted at the average 2026 exercise price
INT_SH0 = 2.46 # shares for the 3% coupon at US$7.75 (start close)
R = 1.5 ** 0.25
def npv_at(u):
"""Study points (C$M, after tax, 2023 $) in study terms: price x 1.02658 (X1)."""
pts = [(50, 2100), (80, 4890), (95, 6320), (100, 6790), (150, 11520)]
x = u * FX / (1 / 0.72)
for (a, va), (b, vb) in zip(pts, pts[1:]):
if x <= b or b == 150: return va + (x - a) * (vb - va) / (b - a)
def _m(i):
s = i['ev_nav']; return i.get('m', (s[0] + s[1]) / 2)
def _branches(i, P):
npv = i['npv'] if 'u' not in i else npv_at(i['u'])
opt = OPT_N if P > OPT_K else 0.0; proc = opt * OPT_K
int_sh = INT_SH0 * 11.05 / P
sh_w = SHARES + i['equity_works'] / (0.8 * P) + opt + int_sh
Mw_ps = (_m(i) * npv + i['into_project'] - i['debt_works'] + proc) / sh_w
if Mw_ps > 15.30: # debentures (US$250M, C$15.30) convert: 23.30M shares, principal no longer repaid
sh_w += 23.299161
Mw_ps = (_m(i) * npv + i['into_project'] - (i['debt_works'] - 356.5) + proc) / sh_w
sh_l = SHARES + i['equity_late'] / (0.8 * P) + opt + int_sh
Ml_ps = (_m(i) * npv + i['into_project'] - i['equity_late'] + proc) / sh_l / R ** i['delay']
Ms_ps = i['stalled_ps']
Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
return dict(m=_m(i), npv=npv, shares_works=sh_w, shares_late=sh_l, Mw_ps=Mw_ps, M_late_ps=Ml_ps,
M_stalled_ps=Ms_ps, Mf_ps=Mf_ps)
def value(inp=None):
i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
y = i['years']
return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_late=b['M_late_ps'] / P, M_stalled=b['M_stalled_ps'] / P,
E=E, E_q0=Eq0, cheap_line=2 ** (y / 4), exp_line=1.1 ** (y / 4), per_year=E ** (1 / y) - 1)
def _E(i, P):
b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b
def _cross(i, line, hi, lo=0.05, steps=4000):
import math
prev = hi
for k in range(steps + 1):
P = hi * math.exp(math.log(lo / hi) * k / steps)
if _E(i, P)[0] >= line:
a, b = P, prev
for _ in range(60):
mid = (a + b) / 2
a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
return a
prev = P
return None
def levels(inp=None):
i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
cheap_arith=cheap, fail_ps_at_cheap=fps)
if __name__ == '__main__':
r = value(); l = levels()
print({k: round(v, 4) for k, v in r.items()}); print(l)
# desk, 16 Nov: the counted case
DEFAULTS.update({'pw': 0.4})Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.
Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.
How we rate a share, with two worked examples →
Human judgement (Chung Huynh) on what matters. Machine effort on everything else.
Chung Huynh is an independent equity researcher, not a licensed financial adviser.
The author may own shares in companies rated here and may buy or sell them at any time.
A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.
Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.
Educational research, not personal financial advice.