NYSE: HL · Gold & silver producers
A US silver producer (Greens Creek in Alaska, Lucky Friday in Idaho, no debt) with a third mine, Keno Hill in Yukon, Canada, held back until its licences are amended, and a pyrite circuit planned at Greens Creek.
Fair, on the expensive edge: 1.08× by the numbers, but the price needs only a peer-level multiple · low confidence
By the numbers alone this reads expensive: 1.079× against the 1.10× line. The desk calls a share expensive only with a written reason that the market's assumption will not hold, and here it has none: the price needs the two mines valued at about 15.4 times their margin, inside what the market pays like-for-like silver producers (Endeavour about 15.0 – 15.5×). So the label is fair. It becomes expensive above US$12.82 (€11.64), where even the high reading of the peer multiple (16.3 times) leaves the expected value under the line; by the central numbers alone the line is crossed above US$11.99, shown as information, never as the label.
Confidence: low. By the numbers the share is 1.9% under the 1.1× line, and small changes move it either way: silver 1.3% higher (US$47.47) or the company's own 2026 cost guidance instead of the latest quarter (1.15×) make it fair by the numbers; costs as high as the full-year guidance implies for Q4 2026 (US$20.8 an ounce, partly because that guidance assumes lower gold, zinc and lead prices) make it 0.89×. The yardstick rests on three silver-led producers, one of them Hecla itself; the other two are Mexican, have shorter reserves and unsettled figures (a strike at First Majestic's San Dimas mine, a guidance cut at Endeavour). Keno Hill's and the pyrite circuit's earnings are estimates: no study exists for either.
What one share should be worth in Nov 2030, by the analyst's estimate:
Works means Keno Hill's licence amendments are granted by 31 Dec 2029 (company: about mid-2029), the related infrastructure is built and its mill is back at or above its Q3 2026 rate (about 415 tons a day; 440 permitted) by 16 Nov 2030, and the Greens Creek pyrite circuit is approved, built and running by then (company: complete late 2028).
Fails means That end state is not reached by 16 Nov 2030. Greens Creek and Lucky Friday keep producing and are valued the same way; Keno Hill stays held down (an estimated 1.5 Moz of silver a year, losing money after its capital) and is valued as a stalled mine per ounce; the pyrite circuit adds nothing. Half of these misses are counted as late (the plan arrives about 1.5 years after the horizon), half as a lasting stall.
Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 16 Nov 2026 (1.1014 US$ per €); the rating itself is worked out in US dollars, and future exchange rates will differ.
Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.
By the central numbers alone the expensive line is crossed above US$11.99 (€10.89). The label turns expensive only above US$12.82, where even the high reading of the peer multiple (16.31 times the margin) leaves the expected value under the line: below that the desk has no written reason that the market is wrong.
The new shares and options each path needs are re-priced at each level.
No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).
A share counts as cheap here if, on average, it should be worth at least 2.00 times its price by Nov 2030. Worked out on paper, that would happen at US$6.38 a share. But at that price a share would still be worth US$12.36 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.
At the rankings' own target: 1.01×. The rankings page's own target for a growing mid-size producer, 10 to 12 times EBITDA (yearly earnings before interest, tax, depreciation and amortisation), on the same plan gives 0.78 to 1.00 times today's price if it works (mid-point 0.89, before four years of cash flow) and an expected value of 1.01× with the counted value if it fails: under the 1.1× line on that yardstick. Shown beside the rating, never counted.
At the top metal price on the rankings: If gold were US$7,000/oz and silver US$108/oz, the top regular prices on the rankings page (not a forecast): value if it works 3.77×, expected value 3.54× (3.36× without late outcomes), with the multiple held at 15.0 times; in practice the market pays fewer times a much wider margin, so this overstates. Shown beside the rating, never counted.
The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).
Fair, on the expensive edge. At US$12.22 (close of Mon 16 Nov 2026) the expected value of a share in four years is 1.08 times today's price (about 1.9% a year). By the numbers that is just under the 1.1× line below which a share counts as expensive, but the desk calls a share expensive only when it can show why the market's assumption will not hold, and here it cannot. The expected value weighs what a share is worth if the plan works and if it fails by their chances. Hecla's two profitable mines, Greens Creek (Alaska) and Lucky Friday (Idaho), earn about US$431M a year at today's silver after their all-in sustaining cost (AISC: the full cost of an ounce, including the spending that keeps the mines going). Valued at 15.0 times that margin, the middle of the three silver-led producers the desk measures, plus four years of free cash flow, a share is worth 1.13 times today's price if the plan works and 1.06 times if not. The plan: Keno Hill's (Yukon) licences amended by the end of 2029 and its mill back at its 2026 rate, and a new pyrite circuit running at Greens Creek, by November 2030. The analyst's chance that it works (a judgement): 30%. For the share to be fair by the numbers the mines need about 15.4 times their margin, about what the best-paid of the other silver-led producers gets, so the evidence does not show that the price is too high.
Price alone won't make this cheap: below about US$6.38, where the arithmetic would read cheap, the value if the plan fails (US$12.36 a share) is far above the price, and the desk's rule then shows no cheap level (a rule made for projects that may stall; for a producer it is flagged for review). With everything else fixed the cheap line needs silver near US$77. Dates to watch: 2026 production and 2027 guidance (about 26 Jan 2027), Keno Hill's 2027 guidance (February 2027), the pyrite circuit decision (2027), the Keno Hill licence amendments (company: about mid-2029).
Expensive above about US$12.82 (€11.64) with nothing else changed: from there even the high reading of the peer multiple (16.3 times the margin) leaves the expected value under the 1.1× line. By the central numbers alone the line is crossed above about US$11.99. It would also turn expensive at today's price if 2027 guidance (January–February 2027) shows the two mines' AISC at about US$17 an ounce or more (1.00×; 0.95× if their silver is also below 12.5 Moz), and it gets worse if Keno Hill's licence date moves past the end of 2029 or if shares sold under the at-the-market programme (a permission filed on 10 Nov 2026 to sell up to 50 million new shares into the market) pay for something worth less than it cost.
Set in advance: any one of these would mean the plan has failed or the rating must be redone.
| When | What |
|---|---|
| 10 – 11 Dec 2026 | Last day to convert the Series B preferred shares (10 Dec); their cash redemption, about US$7.64M (11 Dec; 8-K of 10 Nov 2026) |
| Q4 2026 | Lucky Friday surface cooling commissioning (company) |
| about 26 Jan 2027 | 2026 production and 2027 guidance (the prior year's pattern) |
| February 2027 | Keno Hill's 2027 guidance (company, 3 Nov 2026) |
| about 17 Feb 2027 | FY2026 results and annual report (10-K): the share count shows any at-the-market sales; year-end reserves |
| spring 2027 | Yukon mine-waste guidelines (from the rankings row, not re-read) |
| late 2027 / late 2028 | Pyrite circuit: intermittent production with temporary equipment, if approved (late 2027); circuit complete (late 2028; company, subject to permits and final approval) |
| about mid-2029 | Keno Hill licence amendments, then the related infrastructure (company) |
Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.
The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon. For this company the analyst's label differs from the numbers' label: see the note on the card.
The same function at the rankings page's regular price columns: sensitivities, not forecasts. The multiple (15.02 times the margin) is held; the two mines' margin, Keno Hill's cash flow, the pyrite circuit's margin, tax and four years of free cash flow are re-run at each price; the gold credit moves with gold on 53,000 ounces a year; costs, ounces, Keno Hill's stalled value and its cap are held; lead and zinc do not move. At much higher silver the market pays fewer times a wider margin, so the upper columns overstate. The ±10% rows move both metals from the 16 Nov closes. Sensitivities, not forecasts.
Swipe the table sideways for more columns →
| Price | Expected value | If it works | If it fails | Cheap below | Expensive above |
|---|---|---|---|---|---|
| −10% (gold US$3,467.7 / silver US$42.17) | 0.87× · expensive | 0.90× | 0.86× | none | US$10.35 |
| +10% (gold US$4,238.3 / silver US$51.54) | 1.29× · fair | 1.35× | 1.26× | none | US$15.29 |
| gold US$3,500 / silver US$45 | 0.97× · expensive | 1.01× | 0.96× | none | US$11.54 |
| gold US$4,500 / silver US$69 | 1.91× · fair | 2.02× | 1.86× | none | US$22.74 |
| gold US$5,500 / silver US$85 | 2.57× · cheap | 2.73× | 2.50× | already cheap | US$30.71 |
| gold US$6,500 / silver US$100 | 3.20× · cheap | 3.41× | 3.11× | already cheap | US$38.26 |
| gold US$7,000 / silver US$108 | 3.54× · cheap | 3.77× | 3.44× | already cheap | US$42.23 |
Hecla Mining is worth about US$13.76 a share in Nov 2030 if the plan works and US$12.95 if it fails. At a 30% chance the expected value is US$13.19, 1.08× today's US$12.22: fair.
Each step says first what its numbers are, then what the step does, then shows the sum.
Shares times price is what the whole company costs on the stock market today; less its cash, what the market pays for the mines (enterprise value). Everything below is compared with this price.
The mines are valued like comparable silver producers today: a multiple of the yearly margin they earn at today's silver. Both branches value them the same way.
If the plan works, both are producing by 16 Nov 2030 and are valued by the same multiple, on their own margins; nothing is added before they produce.
Cash the company earns before the horizon belongs to the shareholders in both branches.
No share sale is needed in either branch: the mines pay for the plan.
The two mines keep producing and are valued as above; Keno Hill stays held down.
A late plan: the stalled value plus the plan's extra value, discounted for the delay, less the cash Keno Hill burns meanwhile.
Each kind of miss counts by its share.
Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.
The share prices at which, everything else as above, the rating would turn.
Expensive also needs a written reason that the market's assumption will not hold. The price needs the mines at about 15.4 times their margin, inside what like-for-like silver producers are paid, so that reason is missing and the label is fair. It turns expensive where even the high multiple gives less than the line.
Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.
Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.
# Hecla Mining (NYSE: HL) - value rating of 17 Nov 2026 (brief v0.5, D-063, D-064). US$M unless marked; share values US$.
# Start close Mon 16 Nov 2026. Rule set: P1 - the two producing mines (Greens Creek + Lucky Friday, with corporate costs)
# at the silver-led producer median of table C-3(a) x their AISC margin at today's metal (guided ounces x (silver -
# latest AISC, company basis, which excludes Keno Hill)). Counted multiple 15.02x: the whole silver-led group (fewer than
# five names, brief v0.5), with Hecla's own row corrected to one basis (17.59x: its 14.85x had multiplied Keno Hill's
# ounces by an AISC that excludes Keno Hill); the median is then Endeavour's. D-063 - 'works' is a producing state: a
# restored Keno Hill and the Greens Creek pyrite circuit are valued by the same producer rule on their own margins
# (estimates: no study exists), never before they produce. F1 - in the fail branch Keno Hill is a stalled asset at the
# silver 'FS / permitted, unfunded' median per oz AuEq, capped at Hecla's own value per oz at the start close.
# F3 - q = 0.5, a late plan = the stalled value plus the growth step discounted at the hurdle rate (10.668%/yr) for the
# delay, less the extra cash Keno Hill burns while waiting. Four years of free cash flow at today's metal, with interest
# on cash, are added in both branches. R1 - the label is expensive only where even the high reading of the peer multiple
# (mult_high) gives E under the line; levels() returns that price and, beside it, the price where the central sum
# crosses. Educational research, not personal financial advice.
DEFAULTS = dict(
P=12.22, # share price, US$ (start close Mon 16 Nov 2026, NYSE: HL)
pw=0.30, # chance the plan works (analyst's deep dive; the rankings row had 0.40)
ag=46.859, au=3853.0, # COMEX closes 16 Nov 2026, US$/oz
mult=15.02, # EV / AISC margin: silver-led median of C-3(a) v2 with Hecla's row corrected (Endeavour 15.02x)
mult_high=16.31, # high reading: median + half the gap to the group's highest (Hecla corrected, 17.59x); R1 level
q=0.5, # share of the not-works outcomes that are late or partial (rule F3, whole tenths, at most 0.5)
delay=1.5, # years a late plan runs behind the horizon; discounted at 10.668%/yr
base_oz=13.25, # Moz Ag a year, Greens Creek 8.15 + Lucky Friday 5.10 (2026 guidance midpoints, 3 Nov 2026)
aisc=14.34, # US$/oz Ag, Q3 2026 consolidated AISC after by-product credits (excludes Keno Hill)
gold_koz=53.0, # koz Au a year, Greens Creek (2026 guidance midpoint); payable rate assumed 1.0 (estimate)
credit_gold_ref=3853.0, # US$/oz gold at which the by-product credit equals the reported one (4279 = re-priced to Q3)
sust=147.5, # US$M a year sustaining capital inside the AISC (2026 guidance 142-153, midpoint)
dda=146.2, # US$M a year depreciation, Q3 2026 x 4 (for the tax line only)
expl=55.0, # US$M a year exploration and pre-development (2026 guidance), outside the AISC
gc_growth=1.5, # US$M a year Greens Creek growth capital (2026 guidance 1-2)
tax=0.203, # income and mining tax rate, nine months 2026 provision / pre-tax income
interest=30.3, # US$M a year before tax: Q3 2026 'other income' 7.575 x 4, where interest sits (estimate; cash held flat)
kh_oz_full=3.852, # Moz Ag a year, Keno Hill at its Q3 2026 rate (963,048 oz x 4; 415 tons a day of 440 permitted)
kh_oz_low=1.5, # Moz Ag a year while throughput is held down (estimate: Q4 2026 implied by the 2026 guide, 0.22-0.52 Moz, x 4)
kh_rev=0.8189, # Keno Hill metal sales per oz produced / realised silver, Q3 2026 (50.172 / 0.963048 / 63.62)
kh_cost_full=101.6, # US$M a year, Keno Hill costs applicable to sales at the Q3 2026 rate (25.402 x 4)
kh_fixed=0.6, # share of those costs that does not fall with throughput (estimate)
kh_capex_low=30.0, # US$M a year Keno Hill capital while held down (estimate; 2026 guidance 55-59, all 'growth')
kh_sust=30.0, # US$M a year sustaining capital of a restored Keno Hill (estimate; not disclosed)
kh_infra=60.0, # US$M, infrastructure after the licence amendments (estimate; not disclosed)
kh_stalled_per_oz=206.34, # US$/oz AuEq, silver 'FS / permitted, unfunded' median (C-3(a) v2), capped (rule F1)
pyr_ag=1.1, pyr_au=12.5, # Moz Ag and koz Au a year from the pyrite circuit (company: 1.0-1.2 Moz, 10-15 koz)
pyr_net=0.6, # share of that metal's value left as margin after payable terms and costs (estimate)
pyr_capex=75.0, # US$M, pyrite circuit build (estimate; the company has published none)
pyr_years=2.0, # years of circuit output inside the horizon (complete late 2028, company)
sbc=12.7, # US$M a year of share awards, issued as new shares at the price P (nine months 2026 x 4/3)
invest=0.0, # US$M of listed equity investments counted (121.155 held; 0 = left inside the peer EV basis)
atm_shares=0.0, # M new shares sold under the at-the-market programme (up to 50), at P less 1.5%
atm_waste=0.0, # share of that money spent on something worth nothing
years=4.0, # horizon in years (lines 2.0^(y/4), 1.1^(y/4))
)
SHARES = 671.777326 # M, net of treasury, 10-Q cover, 30 Oct 2026
AWARDS = 676.872 - 671.680 - 0.4847 # M dilutive awards: Q3 2026 diluted less basic weighted count (10-Q), less the
# 0.4847M if-converted preferred shares (150,736 x 3.2154), redeemed in cash instead
CASH = 691.569 # cash and equivalents, 30 Sep 2026 (no borrowings; finance leases 11.211 left out)
PREF = 150736 * 50.6806 / 1e6 # Series B preferred redeemed 11 Dec 2026 (8-K 10 Nov 2026)
AG0, AU0 = 46.859, 3853.0 # start-close metal, for the F1 cap
EV_TODAY = 12.22 * SHARES - CASH # 7,517.5 at the start close
KH_AUEQ = (53.407 + 14.039 + 11.044) * AG0 / AU0 + 0.016 # Moz AuEq, Keno Hill all categories, 31 Dec 2025
R = 1.5 ** 0.25 # hurdle, 10.668% a year
def base_margin(i, ag, au):
return i['base_oz'] * (ag - i['aisc']) + i['gold_koz'] / 1000 * (au - i['credit_gold_ref'])
def kh_low(i, ag):
"""Keno Hill cash margin a year before capital, throughput held down (estimate)."""
cost = i['kh_cost_full'] * (i['kh_fixed'] + (1 - i['kh_fixed']) * i['kh_oz_low'] / i['kh_oz_full'])
return i['kh_oz_low'] * i['kh_rev'] * ag - cost
def kh_full(i, ag):
"""Keno Hill cash margin a year before capital at its Q3 2026 rate."""
return i['kh_oz_full'] * i['kh_rev'] * ag - i['kh_cost_full']
def pyr_margin(i, ag, au):
return i['pyr_net'] * (i['pyr_ag'] * ag + i['pyr_au'] / 1000 * au)
def _branches(i, P):
ag, au, y, t = i['ag'], i['au'], i['years'], i['tax']
base = base_margin(i, ag, au); khl = kh_low(i, ag); pyr = pyr_margin(i, ag, au)
khw = max(0.0, kh_full(i, ag) - i['kh_sust']) # restored Keno Hill, AISC-style margin
taxes = t * max(0.0, base + i['sust'] - i['dda'] - i['expl'] + khl + i['interest'])
fcf_y = base - i['expl'] - i['gc_growth'] + khl - i['kh_capex_low'] + i['interest'] - taxes
fcf_fail = y * fcf_y
fcf_works = fcf_fail + i['pyr_years'] * pyr * (1 - t) - i['pyr_capex'] - i['kh_infra']
cap = max(0.0, (EV_TODAY - i['mult'] * base_margin(i, AG0, AU0)) / KH_AUEQ) # F1 cap, set at the start close
kh_stalled = min(i['kh_stalled_per_oz'], cap) * KH_AUEQ
ev_stalled = i['mult'] * base + kh_stalled
ev_works = i['mult'] * (base + pyr + khw)
atm_cash = i['atm_shares'] * P * 0.985 * (1 - i['atm_waste'])
other = CASH - PREF + i['invest'] + atm_cash
n = SHARES + AWARDS + y * i['sbc'] / P + i['atm_shares']
Ms_ps = (ev_stalled + other + fcf_fail) / n
Mw_ps = (ev_works + other + fcf_works) / n
Mw_ps = max(Mw_ps, Ms_ps) # works >= fail (brief v0.5)
wait = i['delay'] * max(0.0, i['kh_capex_low'] - khl) / n # cash Keno Hill burns during the delay
Ml_ps = max(Ms_ps, Ms_ps + (Mw_ps - Ms_ps) / R ** i['delay'] - wait)
Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
return dict(base_margin=base, pyr_margin=pyr, kh_works_margin=khw, kh_low_cash=khl - i['kh_capex_low'],
taxes=taxes, fcf_year=fcf_y, fcf4_fail=fcf_fail, fcf4_works=fcf_works, cap_per_oz=cap,
kh_stalled=kh_stalled, ev_stalled=ev_stalled, ev_works=ev_works, shares=n,
Mw_ps=Mw_ps, M_late_ps=Ml_ps, M_stalled_ps=Ms_ps, Mf_ps=Mf_ps)
def value(inp=None):
i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_late=b['M_late_ps'] / P, M_stalled=b['M_stalled_ps'] / P,
E=E, E_q0=Eq0, per_year=E ** (1 / i['years']) - 1)
def _E(i, P):
b = _branches(i, P)
E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
return E, Eq0, b
def _cross(i, line, hi, both=False, lo=0.05, steps=4000):
import math
f = (lambda P: min(_E(i, P)[:2])) if both else (lambda P: _E(i, P)[0])
prev = hi
for k in range(steps + 1):
P = hi * math.exp(math.log(lo / hi) * k / steps)
if f(P) >= line:
a, b = P, prev
for _ in range(60):
mid = (a + b) / 2
a, b = (mid, b) if f(mid) >= line else (a, mid)
return a
prev = P
return None
def levels(inp=None):
i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
exp_sum = _cross(i, 1.1 ** (y / 4), hi) # central sum crosses the expensive line
exp = _cross(dict(i, mult=i['mult_high']), 1.1 ** (y / 4), hi) # R1: under the line even at the high multiple
cheap = _cross(i, 2.0 ** (y / 4), hi, both=True) # both E and E at q = 0 must reach the cheap line
fps = _E(i, cheap)[2]['M_stalled_ps'] if cheap else None
return dict(expensive_above=exp, expensive_above_sum=exp_sum,
cheap_below=(cheap if cheap and cheap > fps else None), cheap_arith=cheap, fail_ps_at_cheap=fps)
def label(inp=None):
"""Fair unless the price is above the R1 level (expensive) or a cheap level exists and the price is below it."""
i = dict(DEFAULTS, **(inp or {})); l = levels(i)
if l['expensive_above'] is not None and i['P'] > l['expensive_above']: return 'expensive'
if l['cheap_below'] is not None and i['P'] < l['cheap_below']: return 'cheap'
return 'fair'
if __name__ == '__main__':
r = value(); l = levels()
print({k: round(v, 4) for k, v in r.items()}); print(l); print(label())
# Low / high case: mult 6.36 (all-producer median, written P1 low) with Keno Hill stalled at US$60.68/oz -> E 0.577;
# mult 16.31 with Keno Hill stalled at US$218.58/oz -> E 1.154.
# Test line (run in the folder holding this file):
# python3 -c "import hecla as m; r = m.value(); l = m.levels(); assert (round(r['E'], 3), round(r['E_q0'], 3), round(r['Mw'], 3), round(r['Mf'], 3)) == (1.079, 1.05, 1.126, 1.06); assert round(l['expensive_above'], 2) == 12.82 and round(l['expensive_above_sum'], 2) == 11.99 and l['cheap_below'] is None and round(l['cheap_arith'], 2) == 6.38 and m.label() == 'fair'; print('ok')"Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.
Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.
How we rate a share, with two worked examples →
Human judgement (Chung Huynh) on what matters. Machine effort on everything else.
Chung Huynh is an independent equity researcher, not a licensed financial adviser.
The author may own shares in companies rated here and may buy or sell them at any time.
A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.
Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.
Educational research, not personal financial advice.