All value ratingsCritical minerals

Centaurus Metals

ASX: CTM · Critical minerals

A nickel developer in Brazil (the Jaguar project, Carajás, Pará): feasibility study done and fully permitted, still waiting for its funding and build decision.

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Value rating · 16 Nov 2026 · start close 13 Nov 2026
CheapFairExpensive

Expensive at today's nickel · low confidence (no nickel peers)

Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 30% (before, 35%, the figure the rankings page used). Before: 0.84×, expensive. Now: 0.83×, expensive. Re-run by the analyst and checked by an independent re-run.

Confidence: low. Low. There is no nickel company at any stage to compare with, so both yardsticks are borrowed from gold, silver and copper; the debt size and the overrun reserve are assumptions. The label holds at the lowest and a high reading of the peer multiple (0.29 and 0.77 of study value, with the late build valued the same way: 0.68× and 0.94×) and with nickel 10% higher (0.96×); nickel about 21% higher, near US$19,400/t, would reach the line.

You pay todayA$0.360 · €0.221 a share
Close of Fri 13 Nov 2026 on the ASX, from Twelve Data's dated price history, matching the desk's nightly price record.

What one share should be worth in Dec 2030, by the analyst's estimate:

30% chance it works
A$0.362€0.222if it works · 1.00×
A$0.270€0.166if it fails · 0.75×

Works means Jaguar is funded, built inside the study's capex plus contingency and producing nickel concentrate near design by the end of 2030.

Fails means By the end of 2030 Jaguar is either being built late or over budget (4 in 10 of these cases, valued 2 years late) or has no funded build at all (6 in 10).

Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.6288 A$ per €); the rating itself is worked out in Australian dollars, and future exchange rates will differ.

Expected value in Dec 2030
A$0.298€0.183
You pay today
A$0.360€0.221
0.83× today's price−4.5% a year over 4.13 years
30% × 1.004× + 70% × 0.751× = 0.827×
chance it works × value if it works + chance it fails × value if it fails

Expensive at 1.10× or less, cheap at 2.05× or more (lines scaled to the 4.13-year horizon). Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.

Price levels · everything else fixed
Cheap belownone
Last close (Fri 13 Nov)A$0.360 €0.221
Expensive aboveA$0.230 €0.141

Latest close, Mon 16 Nov 2026: A$0.360 (€0.221), in the expensive range. Same range as the rating.

The new shares and options each path needs are re-priced at each level.

No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).

Why is there no cheap price?

A share counts as cheap here if, on average, it should be worth at least 2.05 times its price by Dec 2030. Worked out on paper, that would happen at A$0.089 a share. But at that price a share would still be worth A$0.274 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.

Beside the rating · not counted in it

At the rankings' own target: 0.87×. The rankings page's own method (0.7 times the project's study value at today's nickel, with the money raised for the build credited) gives 1.14 times today's price if it works and an expected value of 0.87× with the same value if it fails: still expensive. Shown beside the rating, never counted.

At the top metal price on the rankings: If nickel were US$24,000/t, the top regular price on the rankings page (not a forecast): value if it works 2.24×, expected value 1.48×, fair by the numbers. Shown beside the rating, never counted.

The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).

Why

Expensive. At A$0.36 (close of Fri 13 Nov 2026) the expected value of a share at the end of 2030 is 0.83 times today's price, under the 1.10× line for expensive over that 4.1-year horizon. The expected value weighs a share's value if the plan works and if it fails by their chances. To build Jaguar, Centaurus needs about US$177M of new shares on top of US$250M of debt that is not yet signed: more than the company's whole market value today. So even a funded and built Jaguar is worth only 1.00 times today's price, valued at what the market pays for funded mines being built: 0.57 times their study value (the after-tax net present value, NPV, in their own mine studies), measured on enterprise value (EV: shares plus debt minus cash), with the build money added. There are no nickel peers, so gold and silver builders are borrowed. A late build is worth 0.74×, a stalled project 0.76×: a late build still needs the build money, raised in new shares, and counts later, while a stalled project spends nothing more. The analyst's chance that it works (a judgement): 30%.

What would change the rating

Price alone won't make this cheap. What could raise the value: closing the funding package (senior debt and the rest of the equity; company: Q4 2026), China's approval of the second tranche of CNGR (an offtake buyer and shareholder) (expected 31 Dec 2026 in the research records, not re-checked), the shareholder meeting for that tranche (15 Jan 2027), its conditions being met by 31 Jan 2027 or it lapses, and a final investment decision (FID), which the thesis breaker (a dated test, set in advance, that would show the case is wrong) requires by 31 Aug 2027. On the numbers it would turn fair with nickel above about US$19,400/t, or if funded builders traded near 1.08 times their study value.

Already expensive. It would turn fair only below about A$0.230 with nothing else changed. It gets worse with no final investment decision (FID) by 31 Aug 2027, LME (London Metal Exchange) nickel averaging below US$14,000/t for a calendar month, or the remaining equity priced below A$0.288 a share.

Thesis breakers

Set in advance: any one of these would mean the plan has failed or the rating must be redone.

Dated events to watch

WhenWhat
Q4 2026Close-out of the funding package (company guidance of 11 Nov 2026)
15 Jan 2027General meeting and proposed issue date for the second strategic tranche
31 Jan 2027Second strategic tranche lapses without FID and approvals; December quarterly due
30 Nov 2027A$0.50 options expire
H1 2029Offtake contracts start
Try your own assumptions · private test

Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.

CheapFairExpensive
Worth in Dec 2030
You pay today
Chance it works
If it works
If it fails
Today's price against the two price levels
Cheap below
Today
Expensive above
Main assumptions
More judgement calls ()

The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.

At other metal prices

The same function at the rankings page's regular price columns: sensitivities, not forecasts. Jaguar's NPV on the study's nickel-only sensitivity (US$216M per US$1,980/t) at today's real; the multiple, the funding and the stalled value held; the late build moves with the works value. Columns are the study's and the rankings' own nickel cases. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

Swipe the table sideways for more columns →

PriceExpected valueIf it worksIf it failsCheap belowExpensive above
nickel US$14,000/t0.66× · expensive0.69×0.65×noneA$0.174
nickel US$15,500/t0.78× · expensive0.92×0.72×noneA$0.214
nickel US$19,800/t1.14× · fair1.59×0.94×noneA$0.378
nickel US$21,780/t1.30× · fair1.90×1.04×noneA$0.473
nickel US$24,000/t1.48× · fair2.24×1.16×noneA$0.588

How we got this

Show the full calculationThe key steps first; every step and input one tap further

Centaurus Metals is worth about A$0.362 a share in Dec 2030 if the plan works and A$0.270 if it fails. At a 30% chance the expected value is A$0.298, 0.83× today's A$0.360: expensive.

The calculation in brief

Each step says first what its numbers are, then what the step does, then shows the sum.

Today

1What the market pays today
The numbers
658.193M
shares in issue (ASX, 4 Nov 2026)
A$0.360
closing share price, 13 Nov 2026
What this step does

Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.

Calculation
658.193M × A$0.360 = A$236.9M

If it works

2Jaguar's study value at today's nickel
The numbers
US$406.7M
after-tax NPV at US$16,025/t, on the study's own line
0.566
what the market pays per dollar of study value for funded builders (enterprise value ÷ NPV; four gold and silver names pooled: there are no nickel peers)
What this step does

A study is a plan, not a result, so the market pays less than the full study value even once the build is funded.

Calculation
0.566 × US$406.7M = US$230.2M
3Value of the whole company if built
The numbers
US$230.2M
Jaguar
US$379.6M + US$40M
build cost and reserve, money that goes into the project (added once)
US$250M
debt, deducted
What this step does

On the enterprise-value basis the money that goes into the mine is added once and the debt taken off.

Calculation
230.2 + 379.6 + 40 − 250 = US$399.8M = A$589.3M
4The money still to raise
The numbers
US$177.5M
build, reserve, head office and finance costs less cash, debt and the second tranche
A$0.288
price of new shares
What this step does

Raised by selling new shares at today's price less 20%.

Calculation
US$177.5M ÷ (A$0.288 × 0.6785) = 908.2M new shares
5Adding up: one share if it works
The numbers
A$589.3M
the company's value if it works (the parts above)
658.19M
shares in issue today
908.22M
new shares sold to fund the plan (the step above)
63.33M
options, warrants and share units that turn into shares
1,629.74M
all the shares there would be
What this step does

All of the company's value divided by all the shares there will be (658.19 + 908.22 + 63.33 = 1,629.74M), then compared with today's price.

Calculation
A$589.3M ÷ 1,629.74M = A$0.362; A$0.362 ÷ A$0.360 = 1.004× today's price

If it fails

6If it stalls
The numbers
US$134.6M
Centaurus's own value today (the cap) plus half the development spend
What this step does

If Jaguar is not funded, it is worth what the market pays for Centaurus today, no more.

Calculation
US$134.6M after a rescue share sale for US$8.1M, then per share (after a rescue share sale where cash runs short) = A$0.274 a share = 0.760×
7If it comes late
The numbers
2 years
how late
10.7% a year
the desk's required return, used to discount the late value
What this step does

A late build: the works value with the reserve spent, discounted two years.

Calculation
works case, with its own extra funding, discounted for the delay = A$0.266 a share = 0.738×
8Value if it fails: late builds and stalls together
The numbers
40%
of the misses are late builds (an estimate nobody measures yet)
60%
are stalls
What this step does

Each kind of miss counts by its share.

Calculation
0.40 × A$0.266 + 0.60 × A$0.274 = A$0.270 = 0.751× today's price

The result

9Weighing the two futures
The numbers
30%
the desk's chance that the plan works
1.004×
if it works
0.751×
if it fails
What this step does

Each future counts by its chance. Over 4.13 years, 1.10× or less is expensive and 2.05× or more is cheap; between is fair. Expensive and cheap also need the written tests.

Calculation
0.30 × 1.004 + 0.70 × 0.751 = 0.827× = A$0.298
10The two price levels
The numbers
1.10× and 2.05×
the expensive and cheap lines
re-priced
the new shares and the options at each price
What this step does

The share prices at which, everything else as above, the rating would turn.

Calculation
solved by the function at each price = expensive above A$0.230 · no cheap price (see the price levels at the top)

Judgement calls to challenge

Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.

Chance the plan works
We used: Desk 30% → 0.83× · expensive
Alternatives, one at a time:
  • Before 16 Nov 35%0.84× · expensive
  • 20% (10 points lower)0.80× · expensive
  • 40% (10 points higher)0.85× · expensive
About this input
The analyst's estimate, from the deep dive, that the company reaches the “works” state above by its date. No measured base rates exist yet for these stages, so this is a judgement call.
Nickel price, held flat
We used: Desk US$16,025 (LME, 13 Nov) → 0.83× · expensive
Alternatives, one at a time:
  • US$14,0000.66× · expensive
  • US$15,5000.78× · expensive
  • US$19,8001.14× · fair
  • US$21,7801.30× · fair
  • US$24,0001.48× · fair
About this input
Moves the Jaguar study value on the study's own nickel sensitivity. The chips are the analyst's price columns.
Jaguar if built, × its study value
We used: Desk 0.566 (median) → 0.83× · expensive
Alternatives, one at a time:
  • Silver Tiger 0.2860.68× · expensive
  • Denarius 0.5350.81× · expensive
  • GoGold 0.5980.84× · expensive
  • Montage 0.9841.05× · expensive
About this input
What the market pays for projects that are funded or being built, per dollar of study value (enterprise value ÷ NPV). There are no nickel peers, so the four gold and silver builders are pooled: borrowed, weak.
Misses that are a late build
We used: Desk 40% → 0.83× · expensive
Alternatives, one at a time:
  • None (the cheap test)0.83× · expensive
About this input
Of the outcomes that miss the works state, the share that is a build that comes late rather than a stall. Nobody measures this yet; the cheap test uses none. A late build can be worth less than a stall: it still needs the build money, raised by selling new shares, and it counts later, while a stalled project spends nothing more.
Debt for the build
We used: Desk US$250M → 0.83× · expensive
Alternatives, one at a time:
  • No debt0.79× · expensive
About this input
Less debt means more new shares.

Every step

The analyst's arithmetic, line by lineAs written in the rating, with the metal-price table

The analyst's lines below are for the earlier case (chance 35%, expected value 0.840×). The calculation in brief above uses the case of 16 Nov.

Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.

Jaguar NPV at US$16,025/t: US$406.7M. A1 on EV, four funded or building names pooled (no nickel group): Silver Tiger 0.286, Denarius 0.535, GoGold 0.598, Montage 0.984 → median 0.566 × 406.7 = US$230.2M; + capex 379.6 + reserve 40.0 − debt 250.0 = US$399.8M ÷ 1,629.7M shares (908.2M new at A$0.288 for US$177.5M; tranche 2 50.3M; nil options 13.0M) = US$0.245 = A$0.362. Late: reserve spent, ÷ 1.10668^2 → A$0.266. Stalled: cap US$131.3M + half the development spend US$3.4M; F2 raise of US$8.1M on 671.2M shares → A$0.274.

  • Start: A$0.360 (€0.221), close of Fri 13 Nov 2026 (source as v0.4). Shares by branch: works 1,629.742M.
  • If it works: A$0.362 a share = 1.004×.
  • If it fails: late build A$0.266 (0.738×), stalled A$0.274 (0.760×); q = 0.4: Mf = A$0.270 = 0.751×.
  • E = 0.35 × 1.0043 + 0.65 × 0.7513 = 0.8398 (-4.1% a year over 4.13 years; lines: cheap 2.046, hurdle 1.520, expensive 1.1034). E at q = 0: 0.8456.
  • Chance the price implies for the hurdle: not reachable (even a certain success is below the hurdle); cheap at no chance; expensive at every chance.
  • Price levels (everything else fixed, new shares re-priced at each price): expensive above A$0.233 (€0.143); the arithmetic's cheap level is A$0.087, against a stalled value of A$0.274 a share at that price: no cheap level (rule F1).
  • Yardstick B (stored, not counted): works 1.35× (the row's own target, as v0.4) → E 0.961× with the counted fail value.
  • Low case (m = 0.2857): Mw 0.72×, Mf 0.66×, E 0.68×.
  • High case (m = 0.7748): Mw 1.22×, Mf 0.82×, E 0.96×.
  • Metal −10% / +10%: E 0.70× / 0.98×. Bull (shown, never counted): if nickel US$24,000/t, works 2.24×, E 1.54×.
Metal column E Works Fail Cheap below Expensive above
nickel US$14,000/t 0.66× 0.69× 0.65× no cheap level A$0.171
nickel US$15,500/t 0.79× 0.92× 0.72× no cheap level A$0.215
nickel US$19,800/t 1.17× 1.59× 0.94× no cheap level A$0.397
nickel US$21,780/t 1.34× 1.90× 1.04× no cheap level A$0.50
nickel US$24,000/t 1.54× 2.24× 1.16× no cheap level A$0.63

Method: Jaguar's NPV on the study's nickel-only sensitivity (US$216M per US$1,980/t) at today's real; the multiple, the funding and the stalled value held; the late build moves with the works value. Columns are the study's and the row's own nickel cases. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

The rating function itself (Python)The exact code behind the card, the sliders and this calculation
# Centaurus Metals (ASX: CTM) - value rating v0.4.1 (16 Nov 2026). US$M unless marked; share values A$.
# Horizon to 31 Dec 2030 (4.13 years; cheap 2.046x, expensive 1.103x).
# Rule set v0.4.1: A1 on EV / study NPV (own cash and raise credited separately): the four funded or building
# names measured at today's metal, pooled (no nickel group); capex and reserve added once, debt deducted.
# F3: q = 0.4, late = works value with the reserve spent, discounted 2 years at 10.668%. F1: stalled at the cap
# (Centaurus's own EV today, US$131.3M) + half the development spend, F2 raise.
AUD = 1.1052 / 1.6288
DEFAULTS = dict(
    P=0.36,            # share price, A$ (start close 13 Nov 2026)
    pw=0.35, q=0.4, delay=2.0,
    npv=406.7,         # Jaguar after-tax NPV8 at US$16,025/t nickel (A2 line through the study's two cases)
    ni=16025.0,
    ev_nav=[185.0 / 647.5, 173.1 / 323.8, 684.0 / 1144.6, 4275.6 / (0.9 * 4830.2)],  # Silver Tiger, Denarius, GoGold, Montage
    capex=379.6, reserve=40.0, head_office=16.8, fin_costs=35.6,
    debt=250.0, tranche2=15.0, tranche2_sh=50.3,
    stalled_A=134.6, stalled_s=8.1,   # US$M: cap 131.3 + half the development spend 3.4; shortfall 8.1
    years=4.13,
)
SHARES = 658.192696
NIL_OPTIONS = 13.0254
CASH = 43.5 * AUD
R = 1.5 ** 0.25

def npv_at(ni):
    """Study nickel-only sensitivity with the real at today's 5.66: US$216M per +10% (US$1,980/t) around 406.7."""
    return 406.7 + (ni - 16025.0) * 216 / 1980

def _m(i):
    s = sorted(i['ev_nav']); n = len(s)
    return i.get('m', s[n // 2] if n % 2 else (s[n // 2 - 1] + s[n // 2]) / 2)

def _branches(i, P):
    npv = i['npv'] if i['ni'] == 16025.0 else npv_at(i['ni'])
    opt50 = 22.025955 if P > 0.50 else 0.0                           # A$0.50 options, expire 30 Nov 2027
    mkt = i['capex'] + i['reserve'] + i['head_office'] + i['fin_costs'] - CASH - i['debt'] - i['tranche2'] - opt50 * 0.50 * AUD
    new = max(mkt, 0.0) / (0.8 * P * AUD)
    sh = SHARES + NIL_OPTIONS + opt50 + i['tranche2_sh'] + new
    Vw = _m(i) * npv + i['capex'] + i['reserve'] - i['debt']
    Mw_ps = Vw / sh / AUD
    Ml_ps = (Vw - i['reserve']) / sh / AUD / R ** i['delay']
    A, s = i['stalled_A'], i['stalled_s']
    n0 = SHARES + NIL_OPTIONS                                         # nil-price options are in the money (C4)
    p = 0.8 * (A - s) / n0; Ms_ps = A / (n0 + s / p) / AUD
    Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
    return dict(m=_m(i), npv=npv, market_equity=mkt, new_shares=new, shares_works=sh, Mw_ps=Mw_ps,
                M_late_ps=Ml_ps, M_stalled_ps=Ms_ps, Mf_ps=Mf_ps)

def value(inp=None):
    i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
    E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
    Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
    y = i['years']
    return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_late=b['M_late_ps'] / P, M_stalled=b['M_stalled_ps'] / P,
                E=E, E_q0=Eq0, cheap_line=2 ** (y / 4), exp_line=1.1 ** (y / 4), per_year=E ** (1 / y) - 1)

def _E(i, P):
    b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b

def _cross(i, line, hi, lo=0.002, steps=4000):
    import math
    prev = hi
    for k in range(steps + 1):
        P = hi * math.exp(math.log(lo / hi) * k / steps)
        if _E(i, P)[0] >= line:
            a, b = P, prev
            for _ in range(60):
                mid = (a + b) / 2
                a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
            return a
        prev = P
    return None

def levels(inp=None):
    i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
    exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
    fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
    return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
                cheap_arith=cheap, fail_ps_at_cheap=fps)

if __name__ == '__main__':
    r = value(); l = levels()
    print({k: round(v, 4) for k, v in r.items()}); print(l)

# desk, 16 Nov: the counted case
DEFAULTS.update({'pw': 0.3})
The inputs (17)Each marked fact, estimate or desk choice, with its source

Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.

The function's inputs

Share price at the start closeFact
0.36
share price, A$ (start close 13 Nov 2026)
Chance the plan worksDesk choice
0.3
see the analyst's arithmetic
Misses that are a late buildDesk choice
0.4
see the analyst's arithmetic
How late a late build is, yearsDesk choice
2
see the analyst's arithmetic
Study value (NPV)Desk choice
406.7
Jaguar after-tax NPV8 at US$16,025/t nickel (a straight line through the study's two cases)
Nickel price, held flatFact
16,025
LME nickel, 13 Nov 2026
ev navDesk choice
0.2857, 0.5346, 0.5976, 0.9835
Silver Tiger, Denarius, GoGold, Montage
Build costDesk choice
379.6
see the analyst's arithmetic
reserveDesk choice
40
see the analyst's arithmetic
head officeDesk choice
16.8
see the analyst's arithmetic
fin costsDesk choice
35.6
see the analyst's arithmetic
Debt for the buildDesk choice
250
see the analyst's arithmetic
tranche2Desk choice
15
see the analyst's arithmetic
tranche2 shDesk choice
50.3
see the analyst's arithmetic
stalled ADesk choice
134.6
US$M: cap 131.3 + half the development spend 3.4; shortfall 8.1
stalled sDesk choice
8.1
US$M: cap 131.3 + half the development spend 3.4; shortfall 8.1
Years to the end of the horizonDesk choice
4.13
see the analyst's arithmetic

Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.

Sources

How we rate a share, with two worked examples →

Back to all value ratings (14 companies)

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Chung Huynh is an independent equity researcher, not a licensed financial adviser.

The author may own shares in companies rated here and may buy or sell them at any time.

A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.

Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.

Educational research, not personal financial advice.