ASX: CTM · Critical minerals
A nickel developer in Brazil (the Jaguar project, Carajás, Pará): feasibility study done and fully permitted, still waiting for its funding and build decision.
Expensive at today's nickel · low confidence (no nickel peers)
Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 30% (before, 35%, the figure the rankings page used). Before: 0.84×, expensive. Now: 0.83×, expensive. Re-run by the analyst and checked by an independent re-run.
Confidence: low. Low. There is no nickel company at any stage to compare with, so both yardsticks are borrowed from gold, silver and copper; the debt size and the overrun reserve are assumptions. The label holds at the lowest and a high reading of the peer multiple (0.29 and 0.77 of study value, with the late build valued the same way: 0.68× and 0.94×) and with nickel 10% higher (0.96×); nickel about 21% higher, near US$19,400/t, would reach the line.
What one share should be worth in Dec 2030, by the analyst's estimate:
Works means Jaguar is funded, built inside the study's capex plus contingency and producing nickel concentrate near design by the end of 2030.
Fails means By the end of 2030 Jaguar is either being built late or over budget (4 in 10 of these cases, valued 2 years late) or has no funded build at all (6 in 10).
Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.6288 A$ per €); the rating itself is worked out in Australian dollars, and future exchange rates will differ.
Expensive at 1.10× or less, cheap at 2.05× or more (lines scaled to the 4.13-year horizon). Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.
Latest close, Mon 16 Nov 2026: A$0.360 (€0.221), in the expensive range. Same range as the rating.
The new shares and options each path needs are re-priced at each level.
No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).
A share counts as cheap here if, on average, it should be worth at least 2.05 times its price by Dec 2030. Worked out on paper, that would happen at A$0.089 a share. But at that price a share would still be worth A$0.274 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.
At the rankings' own target: 0.87×. The rankings page's own method (0.7 times the project's study value at today's nickel, with the money raised for the build credited) gives 1.14 times today's price if it works and an expected value of 0.87× with the same value if it fails: still expensive. Shown beside the rating, never counted.
At the top metal price on the rankings: If nickel were US$24,000/t, the top regular price on the rankings page (not a forecast): value if it works 2.24×, expected value 1.48×, fair by the numbers. Shown beside the rating, never counted.
The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).
Expensive. At A$0.36 (close of Fri 13 Nov 2026) the expected value of a share at the end of 2030 is 0.83 times today's price, under the 1.10× line for expensive over that 4.1-year horizon. The expected value weighs a share's value if the plan works and if it fails by their chances. To build Jaguar, Centaurus needs about US$177M of new shares on top of US$250M of debt that is not yet signed: more than the company's whole market value today. So even a funded and built Jaguar is worth only 1.00 times today's price, valued at what the market pays for funded mines being built: 0.57 times their study value (the after-tax net present value, NPV, in their own mine studies), measured on enterprise value (EV: shares plus debt minus cash), with the build money added. There are no nickel peers, so gold and silver builders are borrowed. A late build is worth 0.74×, a stalled project 0.76×: a late build still needs the build money, raised in new shares, and counts later, while a stalled project spends nothing more. The analyst's chance that it works (a judgement): 30%.
Price alone won't make this cheap. What could raise the value: closing the funding package (senior debt and the rest of the equity; company: Q4 2026), China's approval of the second tranche of CNGR (an offtake buyer and shareholder) (expected 31 Dec 2026 in the research records, not re-checked), the shareholder meeting for that tranche (15 Jan 2027), its conditions being met by 31 Jan 2027 or it lapses, and a final investment decision (FID), which the thesis breaker (a dated test, set in advance, that would show the case is wrong) requires by 31 Aug 2027. On the numbers it would turn fair with nickel above about US$19,400/t, or if funded builders traded near 1.08 times their study value.
Already expensive. It would turn fair only below about A$0.230 with nothing else changed. It gets worse with no final investment decision (FID) by 31 Aug 2027, LME (London Metal Exchange) nickel averaging below US$14,000/t for a calendar month, or the remaining equity priced below A$0.288 a share.
Set in advance: any one of these would mean the plan has failed or the rating must be redone.
| When | What |
|---|---|
| Q4 2026 | Close-out of the funding package (company guidance of 11 Nov 2026) |
| 15 Jan 2027 | General meeting and proposed issue date for the second strategic tranche |
| 31 Jan 2027 | Second strategic tranche lapses without FID and approvals; December quarterly due |
| 30 Nov 2027 | A$0.50 options expire |
| H1 2029 | Offtake contracts start |
Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.
The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.
The same function at the rankings page's regular price columns: sensitivities, not forecasts. Jaguar's NPV on the study's nickel-only sensitivity (US$216M per US$1,980/t) at today's real; the multiple, the funding and the stalled value held; the late build moves with the works value. Columns are the study's and the rankings' own nickel cases. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
Swipe the table sideways for more columns →
| Price | Expected value | If it works | If it fails | Cheap below | Expensive above |
|---|---|---|---|---|---|
| nickel US$14,000/t | 0.66× · expensive | 0.69× | 0.65× | none | A$0.174 |
| nickel US$15,500/t | 0.78× · expensive | 0.92× | 0.72× | none | A$0.214 |
| nickel US$19,800/t | 1.14× · fair | 1.59× | 0.94× | none | A$0.378 |
| nickel US$21,780/t | 1.30× · fair | 1.90× | 1.04× | none | A$0.473 |
| nickel US$24,000/t | 1.48× · fair | 2.24× | 1.16× | none | A$0.588 |
Centaurus Metals is worth about A$0.362 a share in Dec 2030 if the plan works and A$0.270 if it fails. At a 30% chance the expected value is A$0.298, 0.83× today's A$0.360: expensive.
Each step says first what its numbers are, then what the step does, then shows the sum.
Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.
A study is a plan, not a result, so the market pays less than the full study value even once the build is funded.
On the enterprise-value basis the money that goes into the mine is added once and the debt taken off.
Raised by selling new shares at today's price less 20%.
All of the company's value divided by all the shares there will be (658.19 + 908.22 + 63.33 = 1,629.74M), then compared with today's price.
If Jaguar is not funded, it is worth what the market pays for Centaurus today, no more.
A late build: the works value with the reserve spent, discounted two years.
Each kind of miss counts by its share.
Each future counts by its chance. Over 4.13 years, 1.10× or less is expensive and 2.05× or more is cheap; between is fair. Expensive and cheap also need the written tests.
The share prices at which, everything else as above, the rating would turn.
Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.
The analyst's lines below are for the earlier case (chance 35%, expected value 0.840×). The calculation in brief above uses the case of 16 Nov.
Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.
Jaguar NPV at US$16,025/t: US$406.7M. A1 on EV, four funded or building names pooled (no nickel group): Silver Tiger 0.286, Denarius 0.535, GoGold 0.598, Montage 0.984 → median 0.566 × 406.7 = US$230.2M; + capex 379.6 + reserve 40.0 − debt 250.0 = US$399.8M ÷ 1,629.7M shares (908.2M new at A$0.288 for US$177.5M; tranche 2 50.3M; nil options 13.0M) = US$0.245 = A$0.362. Late: reserve spent, ÷ 1.10668^2 → A$0.266. Stalled: cap US$131.3M + half the development spend US$3.4M; F2 raise of US$8.1M on 671.2M shares → A$0.274.
| Metal column | E | Works | Fail | Cheap below | Expensive above |
|---|---|---|---|---|---|
| nickel US$14,000/t | 0.66× | 0.69× | 0.65× | no cheap level | A$0.171 |
| nickel US$15,500/t | 0.79× | 0.92× | 0.72× | no cheap level | A$0.215 |
| nickel US$19,800/t | 1.17× | 1.59× | 0.94× | no cheap level | A$0.397 |
| nickel US$21,780/t | 1.34× | 1.90× | 1.04× | no cheap level | A$0.50 |
| nickel US$24,000/t | 1.54× | 2.24× | 1.16× | no cheap level | A$0.63 |
Method: Jaguar's NPV on the study's nickel-only sensitivity (US$216M per US$1,980/t) at today's real; the multiple, the funding and the stalled value held; the late build moves with the works value. Columns are the study's and the row's own nickel cases. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
# Centaurus Metals (ASX: CTM) - value rating v0.4.1 (16 Nov 2026). US$M unless marked; share values A$.
# Horizon to 31 Dec 2030 (4.13 years; cheap 2.046x, expensive 1.103x).
# Rule set v0.4.1: A1 on EV / study NPV (own cash and raise credited separately): the four funded or building
# names measured at today's metal, pooled (no nickel group); capex and reserve added once, debt deducted.
# F3: q = 0.4, late = works value with the reserve spent, discounted 2 years at 10.668%. F1: stalled at the cap
# (Centaurus's own EV today, US$131.3M) + half the development spend, F2 raise.
AUD = 1.1052 / 1.6288
DEFAULTS = dict(
P=0.36, # share price, A$ (start close 13 Nov 2026)
pw=0.35, q=0.4, delay=2.0,
npv=406.7, # Jaguar after-tax NPV8 at US$16,025/t nickel (A2 line through the study's two cases)
ni=16025.0,
ev_nav=[185.0 / 647.5, 173.1 / 323.8, 684.0 / 1144.6, 4275.6 / (0.9 * 4830.2)], # Silver Tiger, Denarius, GoGold, Montage
capex=379.6, reserve=40.0, head_office=16.8, fin_costs=35.6,
debt=250.0, tranche2=15.0, tranche2_sh=50.3,
stalled_A=134.6, stalled_s=8.1, # US$M: cap 131.3 + half the development spend 3.4; shortfall 8.1
years=4.13,
)
SHARES = 658.192696
NIL_OPTIONS = 13.0254
CASH = 43.5 * AUD
R = 1.5 ** 0.25
def npv_at(ni):
"""Study nickel-only sensitivity with the real at today's 5.66: US$216M per +10% (US$1,980/t) around 406.7."""
return 406.7 + (ni - 16025.0) * 216 / 1980
def _m(i):
s = sorted(i['ev_nav']); n = len(s)
return i.get('m', s[n // 2] if n % 2 else (s[n // 2 - 1] + s[n // 2]) / 2)
def _branches(i, P):
npv = i['npv'] if i['ni'] == 16025.0 else npv_at(i['ni'])
opt50 = 22.025955 if P > 0.50 else 0.0 # A$0.50 options, expire 30 Nov 2027
mkt = i['capex'] + i['reserve'] + i['head_office'] + i['fin_costs'] - CASH - i['debt'] - i['tranche2'] - opt50 * 0.50 * AUD
new = max(mkt, 0.0) / (0.8 * P * AUD)
sh = SHARES + NIL_OPTIONS + opt50 + i['tranche2_sh'] + new
Vw = _m(i) * npv + i['capex'] + i['reserve'] - i['debt']
Mw_ps = Vw / sh / AUD
Ml_ps = (Vw - i['reserve']) / sh / AUD / R ** i['delay']
A, s = i['stalled_A'], i['stalled_s']
n0 = SHARES + NIL_OPTIONS # nil-price options are in the money (C4)
p = 0.8 * (A - s) / n0; Ms_ps = A / (n0 + s / p) / AUD
Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
return dict(m=_m(i), npv=npv, market_equity=mkt, new_shares=new, shares_works=sh, Mw_ps=Mw_ps,
M_late_ps=Ml_ps, M_stalled_ps=Ms_ps, Mf_ps=Mf_ps)
def value(inp=None):
i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
y = i['years']
return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_late=b['M_late_ps'] / P, M_stalled=b['M_stalled_ps'] / P,
E=E, E_q0=Eq0, cheap_line=2 ** (y / 4), exp_line=1.1 ** (y / 4), per_year=E ** (1 / y) - 1)
def _E(i, P):
b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b
def _cross(i, line, hi, lo=0.002, steps=4000):
import math
prev = hi
for k in range(steps + 1):
P = hi * math.exp(math.log(lo / hi) * k / steps)
if _E(i, P)[0] >= line:
a, b = P, prev
for _ in range(60):
mid = (a + b) / 2
a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
return a
prev = P
return None
def levels(inp=None):
i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
cheap_arith=cheap, fail_ps_at_cheap=fps)
if __name__ == '__main__':
r = value(); l = levels()
print({k: round(v, 4) for k, v in r.items()}); print(l)
# desk, 16 Nov: the counted case
DEFAULTS.update({'pw': 0.3})Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.
Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.
How we rate a share, with two worked examples →
Human judgement (Chung Huynh) on what matters. Machine effort on everything else.
Chung Huynh is an independent equity researcher, not a licensed financial adviser.
The author may own shares in companies rated here and may buy or sell them at any time.
A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.
Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.
Educational research, not personal financial advice.