TSX / Nasdaq: AYA · Gold & silver producers
A silver producer in Morocco (the Zgounder mine, Anti-Atlas), with a second, gold-led project (Boumadine) at the preliminary-study stage.
Fair, on the edge · low confidence · price-based since 17 Nov
Changed on 17 Nov 2026 (price-based): rated expensive on the close of Fri 13 Nov 2026 (C$32.58, 1.085×). On Mon 16 Nov 2026 the share closed at C$30.38, below this deep dive's expensive line of C$32.14, so it now reads fair: at that price a share is expected to be worth 1.16× its price by Nov 2030. Every value of the 16 Nov deep dive is unchanged; only the share price moved, and with it the price of the new shares the plan needs. The analyst re-checks it at the next pass.
Confidence: low. The expected value is 5.7% above the expensive line: a close above C$32.14 makes it expensive again. Aya publishes no all-in sustaining cost (AISC), so the margin uses an estimate (US$26.46 an ounce). The two funded gold builders that set Boumadine's value (Denarius, Montage) are unlike it, and their values include their own growth projects.
What one share should be worth in Nov 2030, by the analyst's estimate:
Works means The Boumadine feasibility study (2027) holds the PEA economics and a funded build is under way by end-2028 without a large share issue.
Fails means No funded Boumadine build by end-2028: in November 2030 Aya is the Zgounder mine with its cash, and Boumadine an unfunded study-stage project valued at what PEA-stage gold projects fetch per ounce.
Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 16 Nov 2026 (1.5734 C$ per €); the rating itself is worked out in Canadian dollars, and future exchange rates will differ.
Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.
The new shares and options each path needs are re-priced at each level.
No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).
A share counts as cheap here if, on average, it should be worth at least 2.00 times its price by Nov 2030. Worked out on paper, that would happen at C$17.46 a share. But at that price a share would still be worth C$29.36 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.
At the rankings' own target: 1.16× (at the rated close of C$32.58). The rankings' own range for the value if it works (1.04 – 2.10 times today's price, midpoint 1.57), with the same value if it fails. Shown beside the rating, never counted.
At the top metal price on the rankings (at the rated close of C$32.58): If gold US$7,000 / silver US$108 (the rankings page's top price column; not a forecast, not Chung's view): worth 4.14 times today's price if it works, 3.17 times on average. Shown, never counted.
The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).
At C$30.38, the close of Mon 16 Nov 2026, the expected value in four years is 1.163 times the price, above the 1.100× line for expensive and below the 2.00× line for cheap, so the share is fair. Zgounder is valued like the three silver-led producers (14.85 times its yearly margin at today's silver, about US$1.9B). If Boumadine is funded and being built by the end of 2028 (the desk's chance: 39%), a share is worth 1.47 times the price; if not, 0.97 times. Boumadine has only a preliminary study, 79% of it on Inferred ounces (the least certain category), and its mining licence expired in May 2026. Rated expensive on the close of Fri 13 Nov 2026 (C$32.58, 1.085×); only the share price has changed since.
Price alone won't make this cheap: far below today's price, the value if it fails would be above the price.
Back to expensive: a close above C$32.14 with nothing else changed. News that would weigh on it: 2027 Zgounder guidance below 6.0 Moz or above US$21.50/oz cash cost, a second slip of the Boumadine feasibility study, or the licence not renewed by 30 Jun 2027.
Set in advance: any one of these would mean the plan has failed or the rating must be redone.
| When | What |
|---|---|
| 4 Dec 2026 | Duro Felguera arbitration: the stay runs out |
| about 13 Jan 2027 | Q4 and full-year 2026 production (guide 6.6 – 6.8 Moz silver-equivalent: gold counted as silver) |
| about 27 Jan 2027 | 2027 guidance: first costs under the open-pit pushbacks |
| about 30 Mar 2027 | Full-year 2026 results |
| H1 2027 | Boumadine open-pit mining contract tender |
| H2 2027 | Boumadine feasibility study with ESIA (company target) |
| no date given | Renewal of Boumadine mining licence LE-383661 (expired 16 May 2026) |
Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.
The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.
The same function at the rankings page's regular price columns: sensitivities, not forecasts. Zgounder's margin and four-year free cash flow re-run at each price (multiple 14.85× held); Boumadine's NPV read off the PEA's revenue line (last slope above its top row); the funding gap re-run; the stalled Boumadine value and the cap on the value if it fails held at the start close. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
Swipe the table sideways for more columns →
| Price | Expected value | If it works | If it fails | Cheap below | Expensive above |
|---|---|---|---|---|---|
| gold US$3,500 / silver US$45 | 0.99× · expensive | 1.22× | 0.84× | none | C$27.29 |
| gold US$4,500 / silver US$69 | 1.89× · fair | 2.39× | 1.57× | none | C$52.17 |
| gold US$5,500 / silver US$85 | 2.51× · cheap | 3.23× | 2.05× | already cheap | C$69.28 |
| gold US$6,500 / silver US$100 | 3.09× · cheap | 4.02× | 2.50× | already cheap | C$85.46 |
| gold US$7,000 / silver US$108 | 3.40× · cheap | 4.44× | 2.74× | already cheap | C$94.01 |
Aya Gold & Silver is worth about C$44.65 a share in Nov 2030 if the plan works and C$29.36 if it fails. At a 39% chance the expected value is C$35.33, 1.16× today's C$30.38: fair.
Each step says first what its numbers are, then what the step does, then shows the sum.
Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.
What the producing mine leaves each year after all its costs. Aya publishes no all-in cost, so this margin is the analyst's estimate (about US$26.46 an ounce).
Buyers in 2030 pay what they pay for comparable silver producers today.
A study is a plan, not a result, so the market pays less than the full study value.
On the enterprise-value basis the money that goes into the mine is added once.
Raised by selling new shares at today's price less 20%. The share price is turned into US dollars at the ECB rate of 13 Nov 2026 (US$0.7014 per C$).
All of the company's value divided by all the shares there will be (144.20 + 5.08 + 9.89 = 159.17M), then compared with today's price.
If no funded build by end-2028, Aya is the Zgounder mine with its cash, and Boumadine an unfunded study-stage project. No late-build case (decided): the works state is a funded build.
Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.
The share prices at which, everything else as above, the rating would turn.
Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.
The analyst's lines below are at the rated close of Fri 13 Nov 2026 (C$32.58, expected value 1.085×); the card, the calculation in brief and the sliders use the close of Mon 16 Nov 2026 (C$30.38).
Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.
Zgounder (P1): margin 5.7 Moz × (49.121 − 17.53) − 50.88 = US$129.19M a year × 14.85 = US$1,918.5M; four-year free cash flow US$332.7M (tax 36.8%). Boumadine at today's metal: NPV US$3,937.6M (PEA revenue line), Aya's 85% = US$3,347.0M. A1 on EV: gold funded / in construction EV ÷ NPV = Denarius 0.535, Montage 0.984 (90% basis) → median 0.759 × 3,347.0 = US$2,541M. Works = 1,918.5 + 2,541 + capex 463 (money into the project, added once) + option cash 62.7 = US$4,985M ÷ 158.82M shares (4.73M new at C$26.06 for the US$86.5M gap) = US$31.39 = C$44.75. Stalled (q = 0): 1,918.5 + net cash 128.8 + FCF 332.7 − 130 + Boumadine 4.5645 Moz × US$188.53 (cap US$277/oz not binding) + 62.7 = US$3,173M ÷ 154.09M = C$29.36.
| Metal column | E | Works | Fail | Cheap below | Expensive above |
|---|---|---|---|---|---|
| gold US$3,500 / silver US$45 | 0.93× | 1.15× | 0.79× | no cheap level | C$27.29 |
| gold US$4,500 / silver US$69 | 1.76× | 2.23× | 1.46× | no cheap level | C$52.17 |
| gold US$5,500 / silver US$85 | 2.34× | 3.01× | 1.91× | no cheap level | C$69.28 |
| gold US$6,500 / silver US$100 | 2.89× | 3.75× | 2.33× | no cheap level | C$85.46 |
| gold US$7,000 / silver US$108 | 3.17× | 4.14× | 2.56× | no cheap level | C$94.01 |
Method: Zgounder's margin and four-year free cash flow re-run at each price (multiple 14.85× held); Boumadine's NPV read off the PEA's revenue line (last slope above its top row); the funding gap re-run; the stalled Boumadine value and the F1 cap held at the start close. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
# Aya Gold & Silver (TSX: AYA) - value rating v0.4.1 (16 Nov 2026). US$M unless marked; share values in C$.
# Rule set v0.4.1: P1 - producing Zgounder at the silver-led producer median 14.85x its AISC margin at today's
# metal (low 6.36x, high 14.935x); A1 - Boumadine (works state: a funded build) at the EV / study-NPV median of
# gold 'funded / in construction' (Denarius; Montage on its 90% of the NPV), with the money that goes into the project added once;
# F3 - q = 0 (the works state is not production); F1 - stalled Boumadine at the gold PEA median per oz.
USD_PER_CAD = 1.1052 / 1.5758 # US$ per C$, ECB 13 Nov 2026
DEFAULTS = dict(
P=32.58, # share price, C$ (start close 13 Nov 2026)
pw=0.39, # chance it works (desk)
ag=49.121, au=3886.3, # COMEX closes 13 Nov 2026, US$/oz
mult=14.85, # Zgounder EV / AISC margin (silver-led producers' median, table C-3(a) v2)
ev_nav=[173.1 / 323.8, 4275.6 / (0.9 * 4830.2)], # gold funded / in construction, EV / study NPV today (Denarius, Montage)
q=0.0, # share of misses that are late builds (rule F3: 0, works state is a funded build)
zg_oz=5.7, # Moz silver a year, 2026 guidance midpoint
cash_cost=17.53, # US$/oz, Q3 2026
sust=4 * (5.929 + 6.790), # US$M a year of capital spending + G&A in the AISC estimate (AISC est. US$26.46/oz)
capex=463.0, studies=85.0, wasted_fail=130.0,
stalled_oz=4.5645, stalled_per_oz=188.53, # Moz AuEq attributable; US$/oz gold PEA median
years=4.0,
)
SHARES = 144.195352
OPTIONS = [(2.890944, 1.43), (0.314667, 4.75), (0.063300, 7.69), (4.870000, 15.63), (0.500000, 14.45)] # (M, C$)
UNITS = 0.929067 + 0.080174 + 0.244973
NET_CASH = 183.791 + 16.405 - 71.429 # 30 Sep 2026
EV_TODAY = 3182.7 # US$M at the start close
B_ROWS = [(5441, 0), (8169, 1808), (10995, 3537), (14237, 5525), (16246, 6738)] # PEA: LOM revenue -> NPV5
def boumadine_npv(au, ag):
rev = 10995 + 1.84828 * (au - 3500) + 68.99195 * (ag - 50) # payable Au 1,848.28 koz, Ag 68.99 Moz
for (r0, v0), (r1, v1) in zip(B_ROWS, B_ROWS[1:]):
if rev <= r1 or (r1, v1) == B_ROWS[-1]:
return v0 + (rev - r0) * (v1 - v0) / (r1 - r0)
def _parts(i):
margin = i['zg_oz'] * (i['ag'] - i['cash_cost']) - i['sust']
zg = i['mult'] * margin
profit = 4 * (margin + 4 * 5.929 - 31.0) - 7.337
fcf4 = 4 * margin - 0.368 * profit - 7.337
npv_b = 0.85 * boumadine_npv(i['au'], i['ag'])
s = sorted(i['ev_nav']); m = (s[0] + s[-1]) / 2 if len(s) == 2 else s[len(s) // 2]
m = i.get('m', m)
return margin, zg, fcf4, npv_b, m
def _branches(i, P):
margin, zg, fcf4, npv_b, m = _parts(i)
itm = [(n, k) for n, k in OPTIONS if k < P]
n0 = SHARES + UNITS + sum(n for n, _ in itm)
opt_cash = sum(n * k for n, k in itm) * USD_PER_CAD
gap = max(0.0, i['capex'] + i['studies'] - NET_CASH - fcf4)
new = gap / (0.8 * P * USD_PER_CAD)
surplus = max(0.0, NET_CASH + fcf4 - i['capex'] - i['studies'])
Vw = zg + m * npv_b + i['capex'] + surplus + opt_cash # money into the project added once
Mw_ps = Vw / (n0 + new) / USD_PER_CAD
margin0 = i['zg_oz'] * (49.121 - i['cash_cost']) - i['sust']
cap = (EV_TODAY - i['mult'] * margin0) / i['stalled_oz'] # F1 cap, set at the start close (today's metal)
st = min(i['stalled_per_oz'], max(cap, 0.0)) * i['stalled_oz']
Vs = zg + NET_CASH + fcf4 - i['wasted_fail'] + st + opt_cash
Ms_ps = Vs / n0 / USD_PER_CAD
Ml_ps = Ms_ps # q = 0 by rule F3 here; a late build would need its own value
Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
return dict(margin=margin, zgounder=zg, fcf4=fcf4, npv_b=npv_b, m=m, gap=gap, new_shares=new,
shares_works=n0 + new, shares_fail=n0, Mw_ps=Mw_ps, Mf_ps=Mf_ps, M_stalled_ps=Ms_ps, cap_per_oz=cap)
def value(inp=None):
i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, E=E, per_year=E ** (1 / i['years']) - 1)
def _E(i, P):
b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b
def _cross(i, line, hi, lo=0.05, steps=4000):
import math
prev = hi
for k in range(steps + 1):
P = hi * math.exp(math.log(lo / hi) * k / steps)
if _E(i, P)[0] >= line:
a, b = P, prev
for _ in range(60):
mid = (a + b) / 2
a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
return a
prev = P
return None
def levels(inp=None):
i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
cheap_arith=cheap, fail_ps_at_cheap=fps)
if __name__ == '__main__':
r = value(); l = levels()
print({k: round(v, 4) for k, v in r.items()}); print(l)
# desk, 17 Nov 2026: price-based change (D-068), the close of Mon 16 Nov 2026
DEFAULTS.update({'P': 30.38})Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.
Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.
How we rate a share, with two worked examples →
Human judgement (Chung Huynh) on what matters. Machine effort on everything else.
Chung Huynh is an independent equity researcher, not a licensed financial adviser.
The author may own shares in companies rated here and may buy or sell them at any time.
A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.
Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.
Educational research, not personal financial advice.