Avino Silver & Gold Mines

NYSE American / TSX: ASM · Gold & silver producers

A small silver producer in Durango, Mexico (the Avino mine), planning a second mill for its La Preciosa deposit.

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Value rating · 16 Nov 2026 · start close 13 Nov 2026
CheapFairExpensive

Fair, on the mine multiple · low confidence

Confidence: low. The label turns on the mine multiple: fair above 8.4×, where Avino's silver-led peers trade at 12.8 – 15× and the median of all producers is 6.36×. La Preciosa's value is a per-ounce stand-in for a mine with no study; every plant figure is an estimate. With no late builds the expected value is 1.14×, still fair.

You pay todayUS$4.29 · €3.88 a share
Close of Fri 13 Nov 2026 on NYSE American (in US$), from the desk's nightly price record, equal to stockanalysis.com's dated price history read on 15 Nov 2026.

What one share should be worth in Nov 2030, by the analyst's estimate:

15% chance it works
US$7.92€7.17if it works · 1.85×
US$5.09€4.61if it fails · 1.19×

Works means A stand-alone La Preciosa mill is funded and built by about 2030 and the Avino mine keeps earning its margin at today's metal.

Fails means No stand-alone mill by November 2030: either a build that is decided and funded but late (3 in 10 of these cases), or no build, with Avino a one-mill producer and La Preciosa an undeveloped deposit.

Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.1052 US$ per €); the rating itself is worked out in US dollars, and future exchange rates will differ.

Expected value in Nov 2030
US$5.52€4.99
You pay today
US$4.29€3.88
1.29× today's price+6.5% a year over 4 years
15% × 1.847× + 85% × 1.187× = 1.286×
chance it works × value if it works + chance it fails × value if it fails

Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.

Price levels · everything else fixed
Cheap belownone
Last close (Fri 13 Nov)US$4.29 €3.88
Expensive aboveUS$5.08 €4.60

Latest close, Mon 16 Nov 2026: US$4.03 (€3.66), in the fair range. Same range as the rating.

The new shares and options each path needs are re-priced at each level.

No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).

Why is there no cheap price?

A share counts as cheap here if, on average, it should be worth at least 2.00 times its price by Nov 2030. Worked out on paper, that would happen at US$2.38 a share. But at that price a share would still be worth US$4.36 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.

Beside the rating · not counted in it

At the rankings' own target: 1.36×. The rankings' own 11x EBITDA on the same works case (works 2.33x). Shown, not counted. The rankings use 11 times EBITDA, which is profit before capital spending; the rating uses 14.85 times the margin after all costs and spending, a smaller base, so the rankings' figure comes out higher.

At the top metal price on the rankings: If gold US$7,000 / silver US$108 (the rankings page's top price column; not a forecast, not Chung's view): worth 5.97 times today's price if it works, 4.04 times on average. Shown, never counted.

The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).

Why

At US$4.29 the expected value in four years is 1.29 times today's price, about 6.5% a year. The Avino mine is valued like the three silver-led producers (14.85 times its US$37.6M yearly margin at today's metal). La Preciosa has no study, so a finished mill is valued at what the market pays per ounce for silver mines being built (US$283.69 per gold-equivalent ounce) plus its estimated US$250M build cost. If the mill is built by 2030 (the desk's chance: 15%) a share is worth 1.85 times today's price; if not, 1.19 times (a late mill is 3 in 10 of these cases). At the median multiple of all producers (6.36×) the same sum reads 1.01×, expensive.

What would change the rating

Price alone won't make this cheap. A La Preciosa study with its build cost, recovery and a date would be the first checkable reason in either direction.

A price above US$5.08 with nothing else changed; the mine valued at less than 8.4 times its margin; silver and gold both about 10% lower (expected value 1.05×); or a Q4 2026 all-in sustaining cost (AISC) above US$32 per silver-equivalent ounce at guidance prices.

Thesis breakers

Set in advance: any one of these would mean the plan has failed or the rating must be redone.

Dated events to watch

WhenWhat
about 21 Jan 2027Q4 and 2026 production, 2027 guidance
about March 2027Q4 and 2026 results: AISC against the US$30-32 guide
mid-2027La Preciosa pre-feasibility study (management, spoken)
mid-2028La Preciosa feasibility study and build decision (management, spoken)
Try your own assumptions · private test

Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.

CheapFairExpensive
Worth in Nov 2030
You pay today
Chance it works
If it works
If it fails
Today's price against the two price levels
Cheap below
Today
Expensive above
Main assumptions
More judgement calls ()

The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.

At other metal prices

The same function at the rankings page's regular price columns: sensitivities, not forecasts. Both mines' margins re-run at each price (copper and costs held); mine multiple 14.85× held; La Preciosa's per-ounce works value moves 1.51 times its revenue move (median of the desk's re-based silver studies); four-year free cash flow moves with revenue less 30.5% tax; the stalled value and the cap on the value if it fails held. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

Swipe the table sideways for more columns →

PriceExpected valueIf it worksIf it failsCheap belowExpensive above
gold US$3,500 / silver US$451.08× · expensive1.56×0.99×noneUS$4.19
gold US$4,500 / silver US$692.13× · fair3.13×1.95×noneUS$8.42
gold US$5,500 / silver US$852.94× · cheap4.37×2.68×already cheapUS$11.43
gold US$6,500 / silver US$1003.66× · cheap5.42×3.35×already cheapUS$14.23
gold US$7,000 / silver US$1084.04× · cheap5.97×3.70×already cheapUS$15.70

How we got this

Show the full calculationThe key steps first; every step and input one tap further

Avino Silver & Gold Mines is worth about US$7.92 a share in Nov 2030 if the plan works and US$5.09 if it fails. At a 15% chance the expected value is US$5.52, 1.29× today's US$4.29: fair.

The calculation in brief

Each step says first what its numbers are, then what the step does, then shows the sum.

Today

1What the market pays today
The numbers
169.369M
shares in issue (NYSE American / TSX)
US$4.29
closing share price, 13 Nov 2026
What this step does

Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.

Calculation
169.369M × US$4.29 = US$726.6M

If it works

2Avino's mine in 2030
The numbers
14.85×
what the market pays for silver-led producers per dollar of yearly margin (three names)
US$37.63M
the mine's yearly margin after all costs, at today's metal
What this step does

The producing mine is valued like comparable silver producers today.

Calculation
14.85 × US$37.63M = US$558.8M
3La Preciosa once built
The numbers
US$283.69/oz
what silver builders fetch per ounce (gold-equivalent)
2.799 Moz
La Preciosa's resource
What this step does

No study exists, so the built mine is valued per ounce, plus its build cost (money into the project, added once).

Calculation
283.69 × 2.799 = US$794.0M
4The money still to raise
The numbers
US$109.3M
build cost, studies and working cash less cash and the mine's four-year cash flow
US$3.43
price of new shares
What this step does

Raised by selling new shares at today's price less 20%.

Calculation
US$109.3M ÷ US$3.43 = 31.85M new shares
5Adding up: one share if it works
The numbers
mine US$558.8 + La Preciosa US$794.0 + build money US$250 + working cash US$25 − loans US$1.7 + option money US$3.1 = US$1,629.2M
the company's value if it works (the parts above)
169.37M
shares in issue today
31.85M
new shares sold to fund the plan (the step above)
4.38M
options, warrants and share units that turn into shares
205.60M
all the shares there would be
What this step does

All of the company's value divided by all the shares there will be (169.37 + 31.85 + 4.38 = 205.60M), then compared with today's price.

Calculation
US$1,629.2M ÷ 205.60M = US$7.92; US$7.92 ÷ US$4.29 = 1.847× today's price

If it fails

6If it stalls
The numbers
US$11.18/oz
La Preciosa at the cap: what today's price implies the market pays per ounce, from today's enterprise value of US$590.1M (market value less all cash of US$138.2M, plus loans; the sums here use the usable cash of US$136.9M) less the mine; plus the mine, cash and cash flow
What this step does

If no new plant by 2030, you own the existing mine, its cash and an unbuilt La Preciosa.

Calculation
mine + La Preciosa at the cap + cash + cash flow − studies − loans + option money, then per share (after a rescue share sale where cash runs short) = US$4.36 a share = 1.016×
7If it comes late
The numbers
1.5 years
how late
10.7% a year
the desk's required return, used to discount the late value
What this step does

A late plant: the works value discounted 1.5 years.

Calculation
works case, with its own extra funding, discounted for the delay = US$6.81 a share = 1.587×
8Value if it fails: late builds and stalls together
The numbers
30%
of the misses are late builds (an estimate nobody measures yet)
70%
are stalls
What this step does

Each kind of miss counts by its share.

Calculation
0.30 × US$6.81 + 0.70 × US$4.36 = US$5.09 = 1.187× today's price

The result

9Weighing the two futures
The numbers
15%
the desk's chance that the plan works
1.847×
if it works
1.187×
if it fails
What this step does

Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.

Calculation
0.15 × 1.847 + 0.85 × 1.187 = 1.286× = US$5.52
10The two price levels
The numbers
1.10× and 2.00×
the expensive and cheap lines
re-priced
the new shares and the options at each price
What this step does

The share prices at which, everything else as above, the rating would turn.

Calculation
solved by the function at each price = expensive above US$5.08 · no cheap price (see the price levels at the top)

Judgement calls to challenge

Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.

Chance the plan works
We used: Desk 15% → 1.29× · fair
Alternatives, one at a time:
  • 5% (10 points lower)1.22× · fair
  • 25% (10 points higher)1.35× · fair
About this input
The analyst's estimate, from the deep dive, that the company reaches the “works” state above by its date. No measured base rates exist yet for these stages, so this is a judgement call.
Silver price, held flat
We used: Desk US$49.121 (COMEX, 13 Nov) · gold US$3,886 → 1.29× · fair
Alternatives, one at a time:
  • US$45 · gold US$3,5001.08× · expensive
  • US$69 · gold US$4,5002.13× · fair
  • US$85 · gold US$5,5002.94× · cheap
  • US$100 · gold US$6,5003.66× · cheap
  • US$108 · gold US$7,0004.04× · cheap
About this input
The chips are the gold and silver rankings' price columns (they move gold too), not forecasts.
Avino's mine, × its yearly margin
We used: Desk 14.85× (silver-led) → 1.29× · fair
Alternatives, one at a time:
  • All producers 6.36×1.01× · expensive
  • Silver-slump years 2016 – 19: 9.97×1.17× · fair
  • Ten-year middle: 11.22×1.23× · fair
  • Silver-jump years 2020, 2025: 15.99×1.31× · fair
About this input
What buyers pay for the producing mine as a multiple of its margin after all costs. 14.85× is the median of three silver-led producers (Avino itself trades at 15.7×). History chips: year-end EV ÷ that year's EBITDA for Pan American, First Majestic, Coeur, Endeavour, Avino and Hecla, 2016 – 25, from vcpscanner.com (a market-data aggregator), read 15 Nov 2026; medians of 19, 50 and 10 company-years out of 24, 60 and 12 possible: six had no data and four above 40× are left out. EBITDA is before capital spending, while the desk's margin is after it, so read them as a rough guide.
Misses that are a late build
We used: Desk 30% → 1.29× · fair
Alternatives, one at a time:
  • None (the cheap test)1.14× · fair
About this input
Of the outcomes that miss the works state, the share that is a build that comes late rather than a stall. Nobody measures this yet; the cheap test uses none. A late build can be worth less than a stall: it still needs the build money, raised by selling new shares, and it counts later, while a stalled project spends nothing more.

Every step

The analyst's arithmetic, line by lineAs written in the rating, with the metal-price table

Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.

Mine (P1): margin 2.220 Moz × (49.121 − 32.17) = US$37.63M × 14.85 = US$558.8M. La Preciosa built (A2 fallback, no study): 2.799 Moz AuEq × US$283.69 = US$794.0M, plus the US$250M build cost (money into the project, once). C4: 250 + 15 + 25 − 136.9 − 43.8 = US$109.3M at US$3.43 = 31.85M shares; 205.60M shares. Works = 558.8 + 794.0 + 250 + 25 − 1.7 + 3.09 = US$1,629.2M → US$7.92. Late = works ÷ 1.10668^1.5 = US$6.81. Stalled: 558.8 + La Preciosa capped at (590.1 − 558.8) ÷ 2.799 = US$11.18/oz (US$31.3M) + cash 136.9 + FCF 43.8 − 15 − 1.7 + 3.09 = US$757.2M ÷ 173.75M = US$4.36.

  • Start: US$4.29 (€3.88), close of Fri 13 Nov 2026 (source as v0.4). Shares by branch: works 205.595M, fail 173.748M.
  • If it works: US$7.92 a share = 1.847×.
  • If it fails: late build US$6.81 (1.587×), stalled US$4.36 (1.016×); q = 0.3: Mf = US$5.09 = 1.187×.
  • E = 0.15 × 1.8472 + 0.85 × 1.1871 = 1.2861 (+6.5% a year over 4.00 years; lines: cheap 2.000, hurdle 1.500, expensive 1.1000). E at q = 0: 1.1405.
  • Chance the price implies for the hurdle: 47%; cheap at no chance; expensive at no chance (the fail value alone is above the line).
  • Price levels (everything else fixed, new shares re-priced at each price): expensive above US$5.08 (€4.60); the arithmetic's cheap level is US$2.63, against a stalled value of US$4.36 a share at that price: no cheap level (rule F1).
  • Yardstick B (stored, not counted): works 2.33× (the row's own target, as v0.4) → E 1.359× with the counted fail value.
  • Low case (mult = 6.36, lp_per_oz = 93.86): Mw 0.88×, Mf 0.77×, E 0.79×.
  • High case (mult = 14.94, lp_per_oz = 378.6): Mw 2.15×, Mf 1.27×, E 1.40×.
  • Metal −10% / +10%: E 1.05× / 1.53×. Bull (shown, never counted): if gold US$7,000 / silver US$108, works 5.97×, E 4.04×.
Metal column E Works Fail Cheap below Expensive above
gold US$3,500 / silver US$45 1.08× 1.56× 0.99× no cheap level US$4.19
gold US$4,500 / silver US$69 2.13× 3.13× 1.95× no cheap level US$8.42
gold US$5,500 / silver US$85 2.94× 4.37× 2.68× no cheap level US$11.43
gold US$6,500 / silver US$100 3.66× 5.42× 3.35× no cheap level US$14.23
gold US$7,000 / silver US$108 4.04× 5.97× 3.70× no cheap level US$15.70

Method: Both mines' margins re-run at each price (copper and costs held); mine multiple 14.85× held; La Preciosa's per-ounce works value moves 1.51 times its revenue move (median of the desk's re-based silver studies); four-year free cash flow moves with revenue less 30.5% tax; the stalled value and the F1 cap held. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.

The rating function itself (Python)The exact code behind the card, the sliders and this calculation
# Avino Silver & Gold Mines (NYSE American: ASM) - value rating v0.4.1 (16 Nov 2026). US$M; share values US$.
# Rule set v0.4.1: P1 - the producing Avino mine at the silver-led producer median 14.85x its AISC margin at
# today's metal (low 6.36x, high 14.935x); a mine not yet built is never valued by the producer rule, so a built
# La Preciosa (no study, no NPV) takes A2's fallback: table C-3(a) v2 EV per oz AuEq of silver 'funded / in
# construction' (US$283.69), with the money that goes into the project added once. F3: q = 0.3, late = works
# value discounted at the hurdle rate (10.668%/yr) for 1.5 years. F1: stalled La Preciosa at the silver
# resource-stage median (US$60.68/oz AuEq) capped at its own value per oz at the start close.
DEFAULTS = dict(
    P=4.29,            # share price, US$ (start close 13 Nov 2026)
    pw=0.15,           # chance it works (desk)
    ag=49.121, au=3886.3,
    mult=14.85,        # Avino mine EV / AISC margin
    lp_per_oz=283.69,  # built La Preciosa, US$ per oz AuEq (silver funded / in construction median)
    lp_oz=2.799,       # Moz AuEq, La Preciosa resource (all categories)
    stalled_per_oz=60.68,
    q=0.3, delay=1.5,
    capex=250.0,       # US$M, estimate (no filing figure)
    studies=15.0, work_cash=25.0,
    elasticity=1.51,   # works value per oz moves 1.51x the metal move (median of the desk's re-based silver studies)
    years=4.0,
)
SHARES = 169.368596
RSUS = 1.825166
CAD = 1.1052 / 1.5758                          # US$ per C$
OPTIONS = [(0.450, 1.12), (0.535, 0.78), (1.494, 2.11), (0.075, 4.38), (0.436572, 9.41), (0.300, 9.47)]  # (M, C$)
CASH, LOANS = 136.9, 1.7                        # usable cash; equipment loans (30 Sep 2026)
EV_TODAY = 590.1
R = (1.5 ** 0.25)                               # hurdle rate per year, 10.668%

def mine_margin(ag, au):
    return 53.43 * ag / 49.121 + 29.22 * au / 3886.3 + 26.39 - 71.41   # revenue (Ag, Au, Cu fixed) - AISC

def lp_revenue(ag, au):
    return 209.86 * ag / 49.121 + 25.14 * au / 3886.3

def fcf4(ag, au):
    """4-year free cash flow at the metal price: US$43.8M at today's metal, moving with the mine's revenue less 30.5% tax."""
    rev = 53.43 * ag / 49.121 + 29.22 * au / 3886.3 + 26.39
    return 43.8 + 4 * (rev - 109.04) * (1 - 0.305)

def _branches(i, P):
    ag, au = i['ag'], i['au']
    itm = [(n, k) for n, k in OPTIONS if k * CAD < P]
    n_opt = sum(n for n, _ in itm); money = sum(n * k for n, k in itm) * CAD
    mine = i['mult'] * mine_margin(ag, au)
    f4 = fcf4(ag, au)
    move = lp_revenue(ag, au) / lp_revenue(49.121, 3886.3) - 1
    if i.get('lp_mode', 'A1') == 'A1':
        lp_built = i['lp_per_oz'] * i['lp_oz'] * (1 + i['elasticity'] * move)
        capex_credit = i['capex']                  # money into the project, added once (EV-per-unit yardstick)
    else:                                          # v0.4 reading (producer rule on the unbuilt mine), for checks only
        lp_built = i['lp_mult'] * (lp_revenue(ag, au) - 104.65)
        capex_credit = 0.0
    gap = i['capex'] + i['studies'] + i['work_cash'] - CASH - f4
    new = max(0.0, gap) / (0.8 * P)
    extra_cash = max(0.0, -gap)
    n0 = SHARES + RSUS + n_opt
    Vw = mine + lp_built + capex_credit + i['work_cash'] + extra_cash - LOANS + money
    Mw_ps = Vw / (n0 + new)
    Ml_ps = Mw_ps / R ** i['delay']
    cap = (EV_TODAY - i['mult'] * mine_margin(49.121, 3886.3)) / i['lp_oz']    # F1 cap at the start close
    st = min(i['stalled_per_oz'], max(cap, 0.0)) * i['lp_oz']
    Vs = mine + st + CASH + f4 - i['studies'] - LOANS + money
    Ms_ps = Vs / n0
    Mf_ps = i['q'] * Ml_ps + (1 - i['q']) * Ms_ps
    return dict(mine=mine, lp_built=lp_built, fcf4=f4, gap=gap, new_shares=new, shares_works=n0 + new,
                shares_fail=n0, Mw_ps=Mw_ps, M_late_ps=Ml_ps, M_stalled_ps=Ms_ps, Mf_ps=Mf_ps, cap_per_oz=cap)

def value(inp=None):
    i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
    E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
    Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
    return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_late=b['M_late_ps'] / P, M_stalled=b['M_stalled_ps'] / P,
                E=E, E_q0=Eq0, per_year=E ** (1 / i['years']) - 1)

def _E(i, P):
    b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b

def _cross(i, line, hi, lo=0.02, steps=4000):
    import math
    prev = hi
    for k in range(steps + 1):
        P = hi * math.exp(math.log(lo / hi) * k / steps)
        if _E(i, P)[0] >= line:
            a, b = P, prev
            for _ in range(60):
                mid = (a + b) / 2
                a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
            return a
        prev = P
    return None

def levels(inp=None):
    i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
    exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
    fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
    return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
                cheap_arith=cheap, fail_ps_at_cheap=fps)

if __name__ == '__main__':
    r = value(); l = levels()
    print({k: round(v, 4) for k, v in r.items()}); print(l)
The inputs (15)Each marked fact, estimate or desk choice, with its source

Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.

The function's inputs

Share price at the start closeFact
4.29
share price, US$ (start close 13 Nov 2026)
Chance the plan worksDesk choice
0.15
chance it works (desk)
Silver price, held flatFact
49.121
COMEX silver close, 13 Nov 2026
Gold price, held flatFact
3,886.3
COMEX gold close, 13 Nov 2026
Avino's mine, × its yearly marginDesk choice
14.85
Avino mine EV / AISC margin
La Preciosa if built, US$ an ounceDesk choice
283.69
built La Preciosa, US$ per oz AuEq (silver funded / in construction median)
lp ozDesk choice
2.799
Moz AuEq, La Preciosa resource (all categories)
stalled per ozDesk choice
60.68
see the analyst's arithmetic
Misses that are a late buildDesk choice
0.3
see the analyst's arithmetic
How late a late build is, yearsDesk choice
1.5
see the analyst's arithmetic
La Preciosa build costEstimate
250
US$M, estimate (no filing figure)
studiesDesk choice
15
see the analyst's arithmetic
work cashDesk choice
25
see the analyst's arithmetic
elasticityDesk choice
1.51
works value per oz moves 1.51x the metal move (median of the desk's re-based silver studies)
Years to the end of the horizonDesk choice
4
see the analyst's arithmetic

Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.

Sources

How we rate a share, with two worked examples →

Back to all value ratings (14 companies)

Human judgement (Chung Huynh) on what matters. Machine effort on everything else.

Chung Huynh is an independent equity researcher, not a licensed financial adviser.

The author may own shares in companies rated here and may buy or sell them at any time.

A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.

Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.

Educational research, not personal financial advice.