TSXV: AGAG · Gold & silver developers
A silver explorer in Salta, Argentina (El Quevar, about 4,800 m up in the Puna): a resource but no economic study yet.
Low confidence in the values: no economic study yet
Confidence: medium on the rating, low on the values. No study exists: the ounces in 2030, the spending and the per-ounce price are estimates. The label holds on every single change tested (either way of valuing a success, each comparison group for a failure, the high value if it works, silver 10% up or down); it turns fair only with two favourable changes together, a chance above 38%, or silver above about US$70.
What one share should be worth in Nov 2030, by the analyst's estimate:
Works means By 2030 the resource has roughly doubled to about 90 Moz (49.4 Moz today), a first economic study shows a mine that pays at US$45 silver, and a producer or the backers fund the next stage.
Fails means Any of the three is missing by 13 Nov 2030: El Quevar is a resource-stage silver project with about 60 Moz, no usable study and a distressed raise behind it.
Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.5758 C$ per €); the rating itself is worked out in Canadian dollars, and future exchange rates will differ.
Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.
Latest close, Mon 16 Nov 2026: C$0.280 (€0.178), in the expensive range. Same range as the rating.
The new shares and options each path needs are re-priced at each level.
No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).
A share counts as cheap here if, on average, it should be worth at least 2.00 times its price by Nov 2030. Worked out on paper, that would happen at C$0.077 a share. But at that price a share would still be worth C$0.120 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.
At the rankings' own target: 0.89×. The rankings' own range for the value if it works, 1.49 – 4.14 times today's price (about 90 Moz at US$3 – 4 an ounce), taken at its midpoint; 0.63 – 1.16 times at the ends of the range. Shown beside the rating, never counted.
At the top metal price on the rankings: If silver US$108 (the rankings page's top price column; not a forecast, not Chung's view): worth 6.51 times today's price if it works, 1.63 times on average. Shown, never counted.
The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).
To return about 10.7% a year at today's price (1.5 times in four years), the plan would need a 61% chance of working; to count as fair it needs 38%, against the desk's 20%. Put another way, a successful El Quevar would need to be worth about US$6.55 per ounce of silver in 2030, 2.5 times what the market pays today for silver projects with a feasibility study (US$2.61). About C$50M, 59% of the market cap, must be raised first, which takes 290M shares to about 524M, and the company's own target for the next resource is 70-75 Moz, not the roughly 90 Moz the plan needs.
Price alone won't make this cheap; a price at or below about C$0.18 makes it fair. A resource of 90 Moz or more in the update due H1 2027, funding from a producer or the backers at or above the market price, or silver holding above about US$70 would each lift the value.
A resource under 60 Moz, penalty elements in the concentrate, or a 2027 raise below C$0.20 a share.
Set in advance: any one of these would mean the plan has failed or the rating must be redone.
| When | What |
|---|---|
| by 20 Nov 2026 (guided) | Locked-cycle metallurgy and concentrate quality |
| by 29 Nov 2026 | Q3 2026 statements (cash at 30 Sep) |
| H1 2027 | Updated El Quevar resource |
| 2027 | Equity financing (funds last to about July 2027) |
| about Q4 2028 | First economic study |
Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.
The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.
The same function at the rankings page's regular price columns: sensitivities, not forecasts. The works value per ounce moves 1.5 times the silver move; options and warrants join when struck below the works value; the fail value held. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
Swipe the table sideways for more columns →
| Price | Expected value | If it works | If it fails | Cheap below | Expensive above |
|---|---|---|---|---|---|
| silver US$45 | 0.72× · expensive | 1.93× | 0.41× | none | C$0.164 |
| silver US$69 | 1.08× · expensive | 3.74× | 0.41× | none | C$0.282 |
| silver US$85 | 1.31× · fair | 4.88× | 0.41× | C$0.156 | C$0.364 |
| silver US$100 | 1.52× · fair | 5.94× | 0.41× | C$0.195 | C$0.445 |
| silver US$108 | 1.63× · fair | 6.51× | 0.41× | C$0.216 | C$0.488 |
Argenta Silver is worth about C$0.639 a share in Nov 2030 if the plan works and C$0.120 if it fails. At a 20% chance the expected value is C$0.224, 0.77× today's C$0.290: expensive.
Each step says first what its numbers are, then what the step does, then shows the sum.
Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.
No study yet, so the value comes per ounce.
Raised by selling new shares at today's price less 20%.
All of the company's value divided by all the shares there will be (290.34 + 233.22 = 523.55M), then compared with today's price.
If the drilling does not reach a study-backed resource, the project is valued like early-study silver projects.
Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.
The share prices at which, everything else as above, the rating would turn.
Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.
Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.
Unchanged from v0.4: works 90 Moz ÷ 79.117 × US$206.34 = C$334.65M ÷ 523.55M shares = C$0.64; fail C$57.80M with an F2 raise → C$0.120.
| Metal column | E | Works | Fail | Cheap below | Expensive above |
|---|---|---|---|---|---|
| silver US$45 | 0.72× | 1.93× | 0.41× | no cheap level | C$0.164 |
| silver US$69 | 1.08× | 3.74× | 0.41× | no cheap level | C$0.282 |
| silver US$85 | 1.31× | 4.88× | 0.41× | C$0.156 | C$0.364 |
| silver US$100 | 1.52× | 5.94× | 0.41× | C$0.195 | C$0.445 |
| silver US$108 | 1.63× | 6.51× | 0.41× | C$0.216 | C$0.488 |
Method: The works value per ounce moves 1.5 times the silver move (the v0.4 method); options and warrants join when struck below the works value; the fail value held. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
# Argenta Silver (TSXV: AGAG) - value rating v0.4.1 (16 Nov 2026). C$M; share values C$. Unchanged rules.
# No study: works at silver FS / permitted EV per oz AuEq (US$206.34) on 90 Moz Ag expected at the works state;
# fail on 60 Moz at the pooled resource-stage median US$53.46/oz AuEq, F2 raise; q = 0.
FX = 1.5758 / 1.1052
DEFAULTS = dict(
P=0.29, pw=0.20, per_oz=206.34, moz=90.0, ag=49.121, elasticity=1.5,
stalled=57.80, funds=20.0, spend_works=75.0, spend_fail=40.0, years=4.0,
)
SHARES = 290.337502
SERIES = [(5.2, 0.26), (2.00295, 0.40), (0.73, 0.14), (3.22, 0.16), (0.9, 0.29), (4.83775, 0.30), (0.15, 0.35),
(1.164, 0.50), (5.085, 0.80), (6.0, 0.82)] # the C$0.60 / C$0.80 warrants (expire 2028, before the study) are left out
HI = 10
def _branches(i, P):
Vw = i['moz'] / 79.117 * i['per_oz'] / 1e0 * FX * (1 + i['elasticity'] * (i['ag'] / 49.121 - 1))
ex = []
vps = Vw / SHARES
for _ in range(10): # series struck below the works value per share are exercised
ex = [(n, k) for n, k in SERIES if k < vps]
money = sum(n * k for n, k in ex); n_i = sum(n for n, _ in ex)
gap = max(0.0, i['spend_works'] - i['funds'] - money)
sh = SHARES + n_i + gap / (0.8 * P); vps = Vw / sh
A = i['stalled']; s = i['spend_fail'] - i['funds']
p = 0.8 * (A - s) / SHARES; fv = A / (SHARES + s / p)
return dict(gap=gap, shares_works=sh, Mw_ps=vps, M_stalled_ps=fv, Mf_ps=fv)
def _E(i, P):
b = _branches(i, P); return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b
def _cross(i, line, hi, lo=0.005, steps=4000):
"""Highest price at or below `hi` where E(P) >= line (scan down on a log grid, then bisect)."""
import math
prev = hi
for k in range(steps + 1):
P = hi * math.exp(math.log(lo / hi) * k / steps)
if _E(i, P)[0] >= line:
a, b = P, prev
for _ in range(60):
mid = (a + b) / 2
a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
return a
prev = P
return None
def levels(inp=None):
i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = HI * i['P']
exp = _cross(i, 1.1 ** (y / 4), hi); cheap = _cross(i, 2.0 ** (y / 4), hi)
fps = _E(i, cheap)[1]['M_stalled_ps'] if cheap else None
return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fps else None),
cheap_arith=cheap, fail_ps_at_cheap=fps)
def value(inp=None):
i = dict(DEFAULTS, **(inp or {})); P = i['P']; b = _branches(i, P)
E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
Eq0 = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['M_stalled_ps']) / P
return dict(b, Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, M_stalled=b['M_stalled_ps'] / P, E=E, E_q0=Eq0,
per_year=E ** (1 / i['years']) - 1)
if __name__ == '__main__':
r = value(); l = levels()
print({k: round(v, 4) for k, v in r.items()}); print(l)Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.
Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.
How we rate a share, with two worked examples →
Human judgement (Chung Huynh) on what matters. Machine effort on everything else.
Chung Huynh is an independent equity researcher, not a licensed financial adviser.
The author may own shares in companies rated here and may buy or sell them at any time.
A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.
Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.
Educational research, not personal financial advice.