TSXV: ALDE · Copper
A copper developer in Argentina (80% of the Altar project, San Juan): a preliminary economic study (PEA) done; the next, more detailed study is due in 2027.
Expensive: 6.9% under the 1.1× line · low confidence
Changed on 16 Nov: the chance it works is now the analyst's own figure from the deep dive, 30% (before, 38%, the figure the rankings page used). Before: 1.07×, expensive. Now: 1.02×, expensive. Re-run by the analyst and checked by an independent re-run.
Confidence: low. Low. The expected value is 6.9% under the line on the per-pound yardstick that is counted, and far under it on study value. Read to the end of 2029, the rankings' own cut-off, instead of four years, it is 1.02× against a 1.08× line: still expensive, even if the spending that builds nothing were zero (1.05×). Copper about 8% higher on the study's own line (about US$6.67/lb) would turn it fair.
What one share should be worth in Nov 2030, by the analyst's estimate:
Works means By the end of 2029 the pre-feasibility study holds the PEA's value and a mining company holds a stake in Altar; the build is still unfunded.
Fails means On 13 Nov 2030 there is no study that holds or no partner: Altar is valued like other early-study copper projects that are stuck, per pound of copper in the ground.
Per share, after the new shares each path needs, so each value compares directly with today's price. € at the ECB reference rate of 13 Nov 2026 (1.5758 C$ per €); the rating itself is worked out in Canadian dollars, and future exchange rates will differ.
Expensive at 1.10× or less, cheap at 2.00× or more. Expensive also needs a written reason; cheap also needs a written reason, a dated catalyst and no tripped thesis breaker.
Latest close, Mon 16 Nov 2026: C$2.63 (€1.67), in the expensive range. Same range as the rating.
The new shares and options each path needs are re-priced at each level.
No cheap price. Price alone won't make this share cheap; it would take good news (see “What would change the rating”).
A share counts as cheap here if, on average, it should be worth at least 2.00 times its price by Nov 2030. Worked out on paper, that would happen at C$1.35 a share. But at that price a share would still be worth C$2.32 if the project stalls, because that value is fixed at today's prices (what the market pays today for this company or for similar stalled projects) and does not fall with the share price. The sum would then say you make money even if everything goes wrong, which is not believable: if the share really fell that far, the value if it stalls would fall with it. So the page shows no cheap price instead of a misleading number.
At the rankings' own target: 1.31×. At the rankings row's own range for a working Altar (about 1.3 – 3.5 times today's price, mid-point 2.4) the expected value is 1.31×: fair on that yardstick. Shown beside the rating, never counted. Copper projects at this stage fetch far less today, about 0.03 of their study value re-priced to today's copper, which is why the rankings' target gives so much more.
At the top metal price on the rankings: If copper were US$8/lb, the top regular price on the rankings page (not a forecast): value if it works 2.37×, expected value 1.30×, fair by the numbers. Shown beside the rating, never counted.
The value at metal futures prices about three years out is pending for all 14 (exchange data on hold).
Expensive. At C$2.74 (close of Fri 13 Nov 2026) the expected value of a share in four years is 1.02 times today's price, 6.9% under the 1.1× line for expensive. The expected value weighs a share's value if the plan works and if it fails by their chances. Both outcomes are valued per pound of copper in the ground, as the market prices comparable projects today. If a pre-feasibility study (the second of the three standard mine studies) holds the first study's value and a mining company takes a stake in Altar by the end of 2029, a share is worth 1.45 times today's price (2.29 US cents a pound, the median of copper projects at that stage); if not, 0.84× (1.26 cents, the median of projects stuck at the first study, after four years of spending). The analyst's chance of success (a judgement): 30%. Valued on the projects' study values instead, both outcomes are far lower.
Price alone won't make this cheap. What could raise the value: the first cash figure after the drilling season (statements due about 30 Nov 2026), the updated Altar resource (Q4 2026, its third date), an application for Argentina's RIGI investment regime (Q1 2027), the pre-feasibility study (2027), and a partner taking a project stake (no company date; the rankings' cut-off is 2029). On the numbers it turns fair if a partner pays about 2.7 US cents a pound or more (about US$172M for 20% of Altar), if copper projects at that stage re-rate above that level, or with copper above about US$6.67/lb.
Already expensive, by 6.9%. It would turn fair only below about C$2.54 with nothing else changed. It gets worse with a fourth date for the resource update, cash at 30 Sep 2026 far below C$27M, or a 2027 study with a capital cost well above US$2.0B.
Set in advance: any one of these would mean the plan has failed or the rating must be redone.
| When | What |
|---|---|
| about 30 Nov 2026 | First-quarter statements (to 30 Sep 2026) |
| Q4 2026 | Updated Altar resource (third date) |
| Q1 2027 | RIGI application (presentation, not a release) |
| 2027 | Pre-feasibility study |
Move a slider, and the value, the rating and the two price levels are worked out again with the same arithmetic as the rating above. The gold mark on each scale is the desk's setting; tap a chip to jump to a value.
The sliders run the analyst's own rating function (translated line by line from Python and tested against it on random inputs), so at the desk's settings they give exactly the card's numbers, and the two price levels are worked out again at each setting. The label here follows the numbers; cheap also needs the cheap line without late builds, and the written tests. Metal prices and costs are held flat to the end of the horizon.
The same function at the rankings page's regular price columns: sensitivities, not forecasts. The per-pound works value moves in proportion to Altar's own study value on the line through its two points (about 2.2 times the copper move at today's price); the fail value (PEA median, cap on the value if it fails) is held fixed; new shares re-priced at the close. Peer multiples, the stalled value and the cap on the value if it fails are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
Swipe the table sideways for more columns →
| Price | Expected value | If it works | If it fails | Cheap below | Expensive above |
|---|---|---|---|---|---|
| copper US$5/lb | 0.85× · expensive | 0.85× | 0.84× | none | C$2.09 |
| copper US$6/lb | 1.00× · expensive | 1.36× | 0.84× | none | C$2.48 |
| copper US$7/lb | 1.15× · fair | 1.86× | 0.84× | none | C$2.87 |
| copper US$8/lb | 1.30× · fair | 2.37× | 0.84× | none | C$3.29 |
Aldebaran Resources is worth about C$3.96 a share in Nov 2030 if the plan works and C$2.31 if it fails. At a 30% chance the expected value is C$2.81, 1.02× today's C$2.74: expensive.
Each step says first what its numbers are, then what the step does, then shows the sum.
Shares times price is what the whole company costs on the stock market today. Everything below is compared with this price.
Both branches use value per pound (the works value may never be below the fail value).
Raised by selling new shares at today's price less 20%.
All of the company's value divided by all the shares there will be (185.44 + 29.15 = 214.59M), then compared with today's price.
If no partner funds the next stage, Altar is valued like other early-study copper projects.
Each future counts by its chance. Over 4.00 years, 1.10× or less is expensive and 2.00× or more is cheap; between is fair. Expensive and cheap also need the written tests.
The share prices at which, everything else as above, the rating would turn.
Where a reasonable person could choose differently, and what that would do. Each result is the model re-run with that one change; the sliders above let you combine them.
The analyst's lines below are for the earlier case (chance 38%, expected value 1.072×). The calculation in brief above uses the case of 16 Nov.
Codes in the analyst's own notes: E = expected value as a multiple of today's price; Mw, Mf = value if it works, if it fails; pw = chance it works; q = share of misses that are late builds; hurdle = 1.5 times in four years (10.7% a year); A1 = valued at what the market pays similar companies today; C4 = new shares for the money still to raise; F1 = the value if it fails is capped at the company's own value today per unit; F2 = a rescue share sale at 80% of value; F3 = a late build valued like success, discounted for the delay; R1 = the written-reason test; X1 = currencies converted at the ECB rate of the start date; yardstick B = the rankings' own target, shown and never counted.
Per-pound yardstick in both branches (works ≥ fail rule). Works: copper PFS median 2.29¢ (Surge 0.83, Hot Chili 2.29, Solaris 3.76) × 25,440 Mlb = US$582.6M = C$830.6M + Centauri C$19.5M = C$850.2M. C4: spending C$87.5M − cash C$33.56M − option money C$16.23M = C$37.71M at C$2.192 = 17.20M shares; 214.59M shares → C$3.96. Fail: copper PEA median without Aldebaran 1.26¢ (cap 1.31¢ does not bind) × 25,440 = US$320.5M = C$457.0M + 19.5 = A = C$476.6M; shortfall s = 66.2 − 33.56 − 16.23 = C$16.41M; F2 price 0.8 × (476.6 − 16.4) ÷ 197.39M = C$1.865; 8.80M new shares → C$2.31.
| Metal column | E | Works | Fail | Cheap below | Expensive above |
|---|---|---|---|---|---|
| copper US$5/lb | 0.85× | 0.85× | 0.84× | no cheap level | C$2.09 |
| copper US$6/lb | 1.04× | 1.36× | 0.84× | no cheap level | C$2.58 |
| copper US$7/lb | 1.23× | 1.86× | 0.84× | no cheap level | C$3.08 |
| copper US$8/lb | 1.42× | 2.37× | 0.84× | no cheap level | C$3.61 |
Method: The per-pound works value moves in proportion to Altar's own study value on the line through its two points (about 2.2 times the copper move at today's price); the fail value (PEA median, F1 cap) is held fixed; new shares re-priced at the close. Limits: Peer multiples, the stalled value and the F1 cap are held at the start close; in reality they move with the metal. Columns far above a study's tested range are rough; costs are held flat. Sensitivities, not forecasts.
# Aldebaran Resources (TSXV: ALDE) - value rating v0.4.1 (16 Nov 2026). C$ unless marked.
# Rule set v0.4.1: the value if it works may never be below the value if it fails, so both branches use the
# per-unit yardstick (EV per lb Cu, all categories, attributable; table C-3(a) v2); F1 cap 1.31 c/lb; F2 raise; q = 0.
FX = 1.5758 / 1.1052 # C$ per US$, ECB 13 Nov 2026
DEFAULTS = dict(
P=2.74, # share price, C$ (start close 13 Nov 2026)
pw=0.38, # chance it works (desk)
works_c_lb=2.29, # works value, US c/lb: copper PFS median (Surge 0.83, Hot Chili 2.29, Solaris 3.76)
fail_c_lb=1.26, # stalled value, US c/lb: copper PEA median without Aldebaran (0.81, 0.97, 1.55, 1.60)
cap_c_lb=1.31, # F1 cap: Aldebaran's own EV per lb at the start close (US$332.5M / 25,440 Mlb)
lb=25440.0, # Mlb Cu attributable (80% of Altar, M&I 22.0 + Inf 9.8 Blb)
centauri=19.525, # C$M, 21,455,943 Centauri shares x C$0.91 (estimate, thin market)
cash=33.561, # C$M at 30 Jun 2026 (audited)
spend_works=87.5, # C$M spending 1 Jul 2026 - 31 Dec 2029 (estimate)
spend_fail=66.2, # C$M spending that builds nothing to 13 Nov 2030 (estimate)
cu=6.173, # copper US$/lb; the works value moves in proportion to Altar's own study line
years=4.0,
)
SHARES = 185.442834
OPTIONS = [(0.10, 0.78), (4.57, 0.79), (0.13, 0.79), (7.15, 1.74), (0.10, 3.32), (3.99, 3.25)] # (M, strike C$)
def npv_altar(cu):
"""Altar PEA, 100%, after-tax NPV8 US$M on the line through US$2,009M @ 4.35 and US$3,340M @ 5.00."""
return 3340 + (cu - 5.00) * (3340 - 2009) / 0.65
def _branches(i, P):
itm = [(n, k) for n, k in OPTIONS if k < P] # options in the money at the price
n_opt = sum(n for n, _ in itm); money = sum(n * k for n, k in itm)
scale = npv_altar(i['cu']) / npv_altar(6.173)
A_w = i['works_c_lb'] / 100 * i['lb'] * scale * FX + i['centauri']
gap = max(0.0, i['spend_works'] - i['cash'] - money) # rule C4, raised at the price less 20%
sh_w = SHARES + n_opt + gap / (0.8 * P)
Mw_ps = A_w / sh_w
c = min(i['fail_c_lb'], i['cap_c_lb'])
A_f = c / 100 * i['lb'] * FX + i['centauri']
s = max(0.0, i['spend_fail'] - i['cash'] - money) # rule F2 distressed raise
n = SHARES + n_opt
if A_f - s <= 0:
Mf_ps = 0.0
else:
p = 0.8 * (A_f - s) / n
Mf_ps = A_f / (n + s / p)
return dict(Mw_ps=Mw_ps, Mf_ps=Mf_ps, shares_works=sh_w, shares_fail=n + (s / p if A_f > s else 0), gap=gap)
def value(inp=None):
i = dict(DEFAULTS, **(inp or {}))
P = i['P']; b = _branches(i, P)
E = (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P
return dict(b, M_stalled_ps=b['Mf_ps'], Mw=b['Mw_ps'] / P, Mf=b['Mf_ps'] / P, E=E,
per_year=E ** (1 / i['years']) - 1)
def _E(i, P):
b = _branches(i, P)
return (i['pw'] * b['Mw_ps'] + (1 - i['pw']) * b['Mf_ps']) / P, b
def _cross(i, line, hi, lo=0.01, steps=4000):
"""Highest price at or below `hi` where E(P) >= line (scan down, then bisect)."""
import math
prev = hi
for k in range(steps + 1):
P = hi * math.exp(math.log(lo / hi) * k / steps)
if _E(i, P)[0] >= line:
a, b = P, prev
for _ in range(60):
mid = (a + b) / 2
a, b = (mid, b) if _E(i, mid)[0] >= line else (a, mid)
return a
prev = P
return None
def levels(inp=None):
i = dict(DEFAULTS, **(inp or {})); y = i['years']; hi = 10 * i['P']
exp = _cross(i, 1.1 ** (y / 4), hi)
cheap = _cross(i, 2.0 ** (y / 4), hi)
fail_ps = _E(i, cheap)[1]['Mf_ps'] if cheap else None
return dict(expensive_above=exp, cheap_below=(cheap if cheap and cheap > fail_ps else None),
cheap_arith=cheap, fail_ps_at_cheap=fail_ps)
if __name__ == '__main__':
r = value(); l = levels()
print({k: round(v, 4) for k, v in r.items()}); print(l)
assert round(r['E'], 2) == 1.07 and round(r['Mw'], 2) == 1.45 and round(r['Mf'], 2) == 0.84 # test line
# desk, 16 Nov: the counted case
DEFAULTS.update({'pw': 0.3})Fact from a filing, exchange or agency · Estimate the desk's own · Desk choice a judgement you can challenge.
Every number here is computed by the same model that drives the rating card and the sliders, so the three cannot disagree.
How we rate a share, with two worked examples →
Human judgement (Chung Huynh) on what matters. Machine effort on everything else.
Chung Huynh is an independent equity researcher, not a licensed financial adviser.
The author may own shares in companies rated here and may buy or sell them at any time.
A rating is reviewed when the price crosses one of its two levels, after major news or a dated catalyst, and at least every three months.
Ratings use today's metal prices. Every number shows its date and source; figures marked estimate are the desk's own.
Educational research, not personal financial advice.